Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 94   DOWNPOWERING TO 65% FOR MFW PUMP MAINTENANCE *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 62   SUMMER LOAD DROP AND SCRAM TESTING *  
Millstone 2 100        
Millstone 3 100     *  
Nine Mile Point 1 99   INCREASING POWER *  
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 60   ROD PATTERN ADJUSTMENTS *  
Pilgrim 1 100        
Salem 1 0 03/30/2004 REFUELING OUTAGE    
Salem 2 96   HOLDING FOR MSR MAINTENANCE *  
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 02/16/2004 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 96   MAX POWER ALLOWED    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 0 05/06/2004 MAINTENANCE OUTAGE    
Hatch 1 100     *  
Hatch 2 99   MAXIMUM OPERATING POWER (MOP)    
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 05/01/2004 DEFUELED    
Oconee 1 100        
Oconee 2 0 03/19/2004 DEFUELED    
Oconee 3 100        
Robinson 2 0 04/20/2004 REFUELING OUTAGE    
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 5   OFFLINE FOR MAIN TRANSFORMER BUSHING REPAIR *  
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 0 05/14/2004 PLANT TRIP - SEE EN # 40752 * 1
Vogtle 1 100        
Vogtle 2 0 04/18/2004 STARTUP IN PROGRESS *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 90   TURBINE VALVE TESTING *  
Byron 1 100        
Byron 2 100        
Clinton 18   OFFLINE FOR TURBINE REPAIR *  
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPACITY    
Dresden 3 99   100% ELECTRICAL CAPACITY    
Duane Arnold 94   100% ELECTRICAL CAPACITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 0 04/02/2004 REFUELING OUTAGE    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 62   INCREASING POWER *  
Arkansas Nuclear 2 100        
Callaway 0 04/10/2004 REFUELING OUTAGE *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 03/22/2004 REFUELING OUTAGE    
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 98     *  
Palo Verde 2 100        
Palo Verde 3 99     *  
River Bend 1 96   ROD SEQUENCE CHANGE *  
San Onofre 2 100        
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.