Power Reactor Status Report for September 27, 2003

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 09/12/2003 DEFUELED    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 65   HOLDING POWER DUE TO CONDENSATE BOOSTER PUMP PROBLEM *  
Ginna 0 09/15/2003 REFUELING OUTAGE    
Hope Creek 1 0 09/19/2003 SHUT DOWN FOR MAINTENANCE    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 28   REDUCED POWER FOR SCHEDULED LOAD DROP *  
Peach Bottom 3 0 09/14/2003 REFUELING OUTAGE    
Pilgrim 1 100        
Salem 1 24   INCREASING POWER *  
Salem 2 44   INCREASING POWER *  
Seabrook 1 95   COASTDOWN TO REFUELING OUTAGE *  
Susquehanna 1 0 09/23/2003 FORCED OUTAGE *  
Susquehanna 2 100        
Three Mile Island 1 98   COASTDOWN TO REFUELING OUTAGE *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 93   100% ELECTRICAL CAPABILITY    
Brunswick 2 96   100% ELECTRICAL CAPABILITY *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 84   COASTDOWN TO REFUELING OUTAGE *  
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/05/2003 REFUELING    
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 09/19/2003 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 99        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 0 09/18/2003 REFUELING OUTAGE    
Turkey Point 3 100        
Turkey Point 4 95   COASTDOWN TO REFUELING OUTAGE    
Vogtle 1 96   COASTDOWN TO REFUELING OUTAGE *  
Vogtle 2 100        
Watts Bar 1 0 09/07/2003 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 09/22/2003 REFUELING OUTAGE    
Byron 2 100        
Clinton 91   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 02/15/2002 RCS AT FULL TEMP/PRESSURE FOR PRESSURE TESTS *  
Dresden 2 96   100% ELECTRICAL CAPABILITY *  
Dresden 3 57   CONTROL ROD PATTERN ADJUSTMENTS *  
Duane Arnold 93   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 60   FUEL LEAK LOCALIZATION TESTING *  
Point Beach 1 100        
Point Beach 2 80   COASTDOWN TO REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 0 09/12/2003 REFUELING OUTAGE - CORE RELOAD IN PROGRESS    
Quad Cities 1 99   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/23/2003 REFUELING OUTAGE *  
Callaway 100     *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 99        
Cooper 65   CONTROL ROD HCU MAINTENANCE *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/12/2003 REFUELING OUTAGE - RV HEAD REMOVED    
Grand Gulf 1 100        
Palo Verde 1 98        
Palo Verde 2 0 09/26/2003 REFUELING OUTAGE *  
Palo Verde 3 99        
River Bend 1 99   INCREASING POWER *  
San Onofre 2 100        
San Onofre 3 97   TURBINE VALVE TESTING *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 93   COASTDOWN TO REFUELING OUTAGE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021