Power Reactor Status Report for June 20, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 65   INCREASING POWER AFTER EXITING A REFUELING OUTAGE *  
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 100        
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100        
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 100        
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 95   MAXIMUM GENERATOR OUTPUT DUE TO A POWER UPRATE *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 92   INCREASING POWER AFTER RECOVERING FROM AN AUTOMATIC REACTOR TRIP ON 06/17/02 (Refer to event #39000) *  
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100   MEASURED '2C' STEAM GENERATOR TUBE LEAKAGE = 9.2 GPD *  
CLINTON 1 94   100% ELECTRICAL CAPABILITY    
COOK 1 97   HOLDING POWER AT THIS LEVEL TO PERFORM A POST REFUELING OUTAGE CALORIMETRIC AFTER RECOVERING FROM A MANUAL REACTOR TRIP FROM 88% POWER ON 06/14/02 (Refer to event #38993) *  
COOK 2 100        
DAVIS BESSE 1 0 02/15/2002 REFUELING OUTAGE - FUEL OFFLOAD IN PROGRESS (DURING DAY SHIFT ONLY) *  
DRESDEN 2 97   100% ELECTRICAL CAPABILITY    
DRESDEN 3 100        
DUANE ARNOLD 1 94   100% ELECTRICAL CAPABILITY    
FERMI 2 100        
KEWAUNEE 1 100        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 98   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COLUMBIA GENERATING 65   HOLDING POWER AT THIS LEVEL TO PERFORM LOAD FOLLOWING    
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 99        
COOPER 1 88   HOLDING POWER AT THIS LEVEL TO PERFORM A ROD ADJUSTMENT *  
DIABLO CANYON 1 100        
DIABLO CANYON 2 55   HOLDING POWER AT THIS LEVEL TO PERFORM CONDENSER WATERBOX CLEANING *  
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100     *  
PALO VERDE 2 98        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 0 05/20/2002 REFUELING OUTAGE - REFUELED - REACTOR VESSEL HEAD TENSIONING IN PROGRESS *  
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 95   HOLDING POWER AT THIS LEVEL TO PERFORM FEEDWATER PUMP POST-MAINTENANCE TESTING AFTER RECOVERING FROM A MANUAL REACTOR TRIP ON 06/14/02 (Refer to event #38991) *  
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021