Power Reactor Status Report for March 2, 2002

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 71   INCREASING POWER *  
CALVERT CLIFFS 1 0 02/15/2002 REFUELING OUTAGE    
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 91   COASTDOWN TO REFUELING OUTAGE *  
HOPE CREEK 1 100        
INDIAN POINT 2 100        
INDIAN POINT 3 100        
LIMERICK 1 86   COASTDOWN TO REFUELING OUTAGE    
LIMERICK 2 100        
MILLSTONE 2 0 02/15/2002 REFUELING OUTAGE    
MILLSTONE 3 100        
NINE MILE POINT 1 100        
NINE MILE POINT 2 100   COASTDOWN TO REFUELING OUTAGE *  
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 100        
SALEM 1 100     *  
SALEM 2 100        
SEABROOK 1 100        
SUSQUEHANNA 1 0 03/02/2002 REFUELING OUTAGE *  
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 94   INCREASING POWER *  

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 96   COASTDOWN TO REFUELING OUTAGE    
BRUNSWICK 1 0 03/01/2002 REFUELING OUTAGE *  
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 100        
CRYSTAL RIVER 3 100        
FARLEY 1 92   TURBINE VALVE TESTING *  
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 96        
HATCH 2 100        
MCGUIRE 1 100        
MCGUIRE 2 0 02/22/2002 REFUELING OUTAGE    
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 65   MAIN FEEDWATER PUMP MAINTENANCE *  
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 97   COASTDOWN TO REFUELING OUTAGE    
VOGTLE 2 100        
WATTS BAR 1 0 02/24/2002 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 95   100% ELECTRICAL CAPABILITY    
BYRON 1 94   COASTDOWN TO REFUELING OUTAGE    
BYRON 2 99   MEASURED SG TUBE LEAKAGE 22 GPD *  
CLINTON 1 100        
COOK 1 100        
COOK 2 48   FLUX MAPPING *  
DAVIS BESSE 1 0 02/15/2002 REFUELING OUTAGE    
DRESDEN 2 87   REDUCED POWER FOR MAINTENANCE *  
DRESDEN 3 100        
DUANE ARNOLD 1 93   100% ELECTRICAL CAPABILITY    
FERMI 2 74   MAIN FEEDWATER PUMP MAINTENANCE *  
KEWAUNEE 1 100        
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 100        
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 15   MAIN GNEARATOR ONLINE *  
QUAD CITIES 1 100        
QUAD CITIES 2 0 02/11/2002 REFUELING OUTAGE *  

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 100        
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100     *  
COLUMBIA GENERATING 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 97     *  
DIABLO CANYON 2 100        
FT CALHOUN 1 98        
GRAND GULF 1 100        
PALO VERDE 1 99        
PALO VERDE 2 99        
PALO VERDE 3 99        
RIVER BEND 1 100        
SAN ONOFRE 2 100        
SAN ONOFRE 3 0 02/27/2002 PREPARING FOR STARTUP *  
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021