Power Reactor Status Report for May 28, 1999

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 100        
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 100        
FITZPATRICK 1 100        
GINNA 1 100        
HOPE CREEK 1 100        
INDIAN POINT 2 99   MAXIMUM OPERATING POWER - TURBINE THROTTLE VALVES FULLY OPEN    
INDIAN POINT 3 100        
LIMERICK 1 100        
LIMERICK 2 98   INCREASING POWER TO 100% *  
MILLSTONE 2 0 05/25/1999 PERFORMING REPAIRS AND STARTUP SURVEILLANCES    
MILLSTONE 3 0 05/01/1999 REFUELING OUTAGE - DEFUELED    
NINE MILE POINT 1 0 04/11/1999 REFUELING OUTAGE - CORE RELOAD COMPLETED *  
NINE MILE POINT 2 100        
OYSTER CREEK 1 100        
PEACH BOTTOM 2 100        
PEACH BOTTOM 3 100        
PILGRIM 1 0 05/08/1999 REFUELING OUTAGE    
SALEM 1 100     *  
SALEM 2 18   INTEND TO SYNC GENERATOR ON GRID THIS MORNING AND CONTINUE WITH POWER ASCENS *  
SEABROOK 1 100        
SUSQUEHANNA 1 81   REDUCED POWER FOR MAINTENANCE ON BYPASS VALVE *  
SUSQUEHANNA 2 100        
THREE MILE ISLAND 1 100        
VERMONT YANKEE 1 100        

Region 2

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 76   INCREASING POWER TO 100% FOLLOWING A ROD IMPROVEMENT *  
CATAWBA 1 65   HOLDING POWER FOR TROUBLESHOOTING GENERATOR BUSHING TEMPERATURE ALARMS *  
CATAWBA 2 0 05/03/1999 MAINTENANCE OUTAGE - REPAIR OF GENERATOR ROTOR    
CRYSTAL RIVER 3 100        
FARLEY 1 0 05/27/1999 RX TRIP DUE TO LOSS OF MAIN FEED PUMP - SEE EVENT #35771 * 1
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 99        
HATCH 2 98        
MCGUIRE 1 100        
MCGUIRE 2 100        
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 0 05/20/1999 REFUELING OUTAGE    
OCONEE 2 100        
OCONEE 3 100        
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 98        
SURRY 1 100        
SURRY 2 1   RX CRITICAL - TROUBLESHOOTING CONDENSER VACUUM PROBLEMS *  
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 100        
WATTS BAR 1 100        

Region 3

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 100        
BRAIDWOOD 2 100        
BYRON 1 100        
BYRON 2 100        
CLINTON 1 30   HOLDING POWER FOR SURVEILLANCES AND SYSTEM WALKDOWNS *  
COOK 1 0 09/08/1997 MAINTENANCE OUTAGE    
COOK 2 0 09/09/1997 REFUELING OUTAGE    
DAVIS BESSE 1 100        
DRESDEN 2 100        
DRESDEN 3 100        
DUANE ARNOLD 1 100        
FERMI 2 97        
KEWAUNEE 1 97   POWER LIMITED DUE TO STEAM GENERATOR TUBE PLUGGING    
LASALLE 1 100        
LASALLE 2 100        
MONTICELLO 1 30   HOLDING FOR SURVEILLANCE TESTING *  
PALISADES 1 100        
PERRY 1 100        
POINT BEACH 1 100        
POINT BEACH 2 100        
PRAIRIE ISLAND 1 37   INCREASING POWER TO 50% FOR NI ADJUSTMENT *  
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 100        
QUAD CITIES 2 100        

Region 4

Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 91   DECREASING POWER TO 85% FOR WEEKLY TURBINE SURVEILLANCES *  
ARKANSAS NUCLEAR 2 100        
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 100        
DIABLO CANYON 1 100        
DIABLO CANYON 2 100        
FT CALHOUN 1 100        
GRAND GULF 1 100        
PALO VERDE 1 100        
PALO VERDE 2 100        
PALO VERDE 3 100        
RIVER BEND 1 0 04/03/1999 REFUELING OUTAGE *  
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WASHINGTON NUCLEAR 2 0 04/17/1999 MAINTENANCE OUTAGE    
WATERFORD 3 100        
WOLF CREEK 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021