Part 21 Reports: 2013
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Log No | Notifier | Description | Report Date | Event No. / Accession No. |
|---|---|---|---|---|
| 2013-32-00 | Nine Mile Point Unit 2 |
Failure of High Pressure Core Spray System Pressure Pump due to Motor Winding Failure (a 10 CFR 50.73 Report) | 04/25/2013 | ML13122A227 |
| 2013-31-00 | Engine Systems, Inc. | Fuel Injectors Failed Pressure Test (See related Part 21 report number 2013-16-00) | 05/03/2013 | ML13127A014 |
| 2013-30-00 | Curtiss-Wright Electro-Mechanical Corp. | Insufficient Process Control on Pump Impeller | 05/03/2013 | ML13127A013 |
| 2013-29-00 | Curtiss-Wright Flow Control Co. | Interim Report of a Potential Defect in a Relief Valve Bellows | 05/03/2013 | ML13127A012 |
| 2013-28-00 | Shaw AREVA MOX Services | Defect identified in some Type 304L and 316L Stainless Steel pipe | 04/29/2013 | ML13120A277 |
| 2013-27-00 | ITT Engineered Valves, LLC | Type M1 Diaphragms May Not Be Qualified for Specific Radiation Design Conditions | 04/26/2013 | ML13120A112 |
| 2013-26-00 | Engine Systems Inc. | Refurbished Emergency Diesel Generator Cylinder Heads May Have Missing Valve Keeper Seals | 04/23/2013 | ML13116A303 |
| 2013-25-00 | Summer Units 2 & 3 | Failure to Comply with Conditions of Construction Permit (a 50.55(e) Report) | 04/10/2013 | EN 48910 |
| 2013-24-00 | Vogtle Units 3 & 4 | Failure to Comply with Conditions of Construction Permit (a 50.55(e) Report) | 04/10/2013 | EN 48906 |
| 2013-23-00 | Flowserve | Limitorque Valves with Incorrect Motor Nameplates Installed | 04/05/2013 | ML13099A093 |
| 2013-22-00 | ABB Inc. | Issue Concerning the Zero Point Acceleration (ZPA) Rating for 3 Phase Relay Type SSC-T | 04/01/2013 | ML13093A155 |
| 2013-21-01 | Watts Bar 2 | Instrumentation Lines Not Inspected Completely for Proper Slope (an Interim 10 CFR 50.55(e) Report) | 04/29/2013 | ML13121A427 |
| 2013-21-00 | Watts Bar 2 | Instrumentation Lines Not Inspected Completely for Proper Slope (a 10 CFR 50.55(e) Report) | 04/01/2013 | EN 48871 |
| 2013-20-01 | Integrated Resources Inc. | Foxboro Power Supply Potential Failures due to Defective Tie Wraps and Holders (Update) | 04/01/2013 | ML13093A153 |
| 2013-20-00 | Integrated Resources Inc. | Foxboro Power Supply Potential Failures due to Defective Tie Wraps and Holders | 03/28/2013 | ML13091A387 |
| 2013-19-00 | ATC Nuclear | Interim Part 21 Report Involving Review of Seismic Methodology | 03/28/2013 | ML13091A388 |
| 2013-18-00 | Electroswitch | Series 24 CSR Relays with Potentially Oversized Drive Cam Component | 03/26/2013 | ML13099A238 |
| 2013-17-00 | Fairbanks Morse Engine | Foreign Material Found Inside Emergency Diesel Generator Air Start Piping Assembly | 03/25/2013 | ML13086A255 |
| 2013-16-00 | Tennessee Valley Authority | Browns Ferry Emergency Diesel Generator Replacement Fuel Injectors Failed a Pressure Test | 03/22/2013 | ML13085A339 |
| 2013-15-00 | Emerson Process Management | Incorrect Assembly Instructions for TopWorx GO Switches | 03/22/2013 | ML13085A340 |
| 2013-14-01 | AAF International | Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air (HEPA) Filters | 04/11/2013 | ML13105A111 |
| 2013-14-00 | AAF International | Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air (HEPA) Filters | 03/18/2013 | ML13079A320 |
| 2013-13-00 | ASCO Valve, Inc. | Direct Acting Three Way Solenoid Valve will not Shift when De-energized | 03/20/2013 | ML13084A054 |
| 2013-12-01 | Limerick | Flowserve Model 28KXL Pump Impeller Defect | 04/15/2013 | ML13106A062 |
| 2013-12-00 | Limerick | Flowserve Model 28KXL Pump Impeller Defect | 03/15/2013 | ML13077A334 |
| 2013-11-00 | Emerson Process Management | Loose Fisher Controls Proximity Switch Target Magnets (a 10 CFR 50.55(e) Report) | 03/12/2013 | ML13073A108 |
| 2013-10-00 | Curtiss-Wright Flow Control | Scientech Dual Alarm Modules and Single Alarm Modules | 03/01/2013 | ML13063A443 |
| 2013-09-00 | Flowserve | Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valve (See related Part 21 Report No. 2013-02-00) | 02/25/2013 | ML13064A012 |
| 2013-08-01 | Dresser-Rand | Defective Raw Material Used to Manufacture Valve Stems for Terry Type Emergency Feedwater Pump Drive Turbines |
03/11/2013 | ML13073A107 |
| 2013-08-00 | Dresser-Rand | Defective Raw Material Used to Manufacture Valve Stems for Terry Type Emergency Feedwater Pump Drive Turbines | 02/12/2013 | ML13045A893 |
| 2013-06-00 | Shaw Modular Solutions | Indeterminate Status of Rebar Splices Used for Modules Being Supplied to AP 1000 Projects Vogtle Unit 3 and V. C. Summer Unit 2 | 02/08/2013 | ML13044A360 |
| 2013-05-01 | Emerson Process Management | TopWorx M8 Switches Built and Shipped with Adhesive that was Beyond its Expiration Date (Final Report) | 03/13/2013 | ML13093A251 |
| 2013-05-00 | Emerson Process Management | TopWorx M8 Switches Built and Shipped with Adhesive that was Beyond its Expiration Date | 02/11/2013 | ML13044A074 |
| 2013-04-00 | Emerson Process Management | Notification of Potential Part 21 Report Involving Fisher Type 546 and 546NS Transducers | 01/11/2013 | ML13015A306 |
| 2013-03-01 | MPR Associates, Inc. | Part 21 Report on a Replacement Basler EDG Excitation System Failure | 03/29/2013 | ML13092A118 |
| 2013-03-00 | MPR Associates, Inc. | Interim Report on a Replacement Basler EDG Excitation System Failure | 01/09/2013 | ML13010A518 |
| 2013-02-00 | Browns Ferry Unit 1 | Anti-Rotation Pin Failure in 10-inch Anchor Darling (Flowserve) Double Disc Gate Valve | 01/04/2013 | ML13008A321 |
| 2013-01-02 | Watts Bar Unit 2 | 10 CFR 50.55(e) Second Interim Report – Commercial Grade Dedication Program Degraded | 05/06/2013 | ML13129A176 |
| 2013-01-01 | Watts Bar Unit 2 | 10 CFR 50.55(e) Report Update - Commercial Grade Dedication Program Degraded | 01/31/2013 | ML13037A455 |
| 2013-01-00 | Watts Bar Unit 2 | 10 CFR 50.55(e) Report - Commercial Grade Dedication Program Degraded | 01/03/2013 | EN 48646 |
Page Last Reviewed/Updated Friday, May 17, 2013

