Part 21 Report - 1995-191
ACCESSION #: 9508290238
Information & Support Services
P.O. Box 3707
Seattle, WA 98124 2207
BOEING
August 22, 1995
G-1151-SJA-95-313
Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C. 20555
Reference: a) Boeing Letter G-1151-RSO-92-365 dated August 31, 1992;
R. S. Orr to the NRC Operations Center
b) NRC Letter Docket No. 99901227 dated August 12, 1992; L.
J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21
Inquiry
Dear Sir or Madam:
In accordance with the reference correspondence and 10 CFR 21, Boeing is
sending the NRC the attached error notice(s) received from our former
software suppliers. Because of unknown current addresses, the following
former customers were not notified:
Reactor Controls, Inc.
Echo Energy Consultants, Inc.
Nuclear Applications and Systems Analysis Company (Japan)
Nuclear Power Services
Error notices have been sent to our other former customers.
Very truly yours,
Sandra J. Andrews
Nuclear Administrator
G-1151 M/S 7A-33
(206) 865-6248
Attachment(s): GTICES Program Response Form No. 95.15
Georgia Tech
Computer Aided Structural Engineering Center
Georgia Institute of Technology
School of Civil & Environmental Engineering
Atlanta, Georgia 30332 0355
USA
404 o 894 o 2260
404 o 894 o 8044 FAX
August 17, 1995
Attention: Nuclear Administrator
Boeing Information & Support Services
P.O.Box 24346, M/S 7A-33
Seattle, Washington 98124-0346
RE: GT STRUDL
Dear Sir or Madam:
Enclosed please find a copy of GTICES PROGRAM REPORT FORM No. 95.15 and a
VENDOR ACKNOWLEDGEMENT FORM. Please sign and return the VENDOR
ACKNOWLEDGEMENT FORM to acknowledge receipt of the GTICES Program Report.
Thank you for reviewing the Program Report and for returning the
Acknowledgement Form.
Best regards,
CASE Center
Catherine Lee
Configuration Control Manager
CL/jhb
Enclosures
GTSTRUDL Program Report Form
GPRF No.: 95.15
DATE: August 17, 1995
FROM: Computer-Aided Structural Engineering Center
Georgia Institute of Technology
Atlanta, Georgia 30332-0355
SEVERITY LEVEL
URGENT Problem results in incorrect answers which may not be
apparent or job aborts and cannot be recovered within
the session or job.
SERIOUS Problem results in incorrect answers which are
obvious or problem prevents completion of a
particular user's task.
x MINOR Problem can be worked around or problem poses high
frustration factor.
INFORMATIVE Documentation error, program usage tip, user
Inconveniences.
Date Problem Confirmed August 17, 1995
Date Notification Sent August 18, 1995
Computers PC Only
Operating System DOS
Version All versions including 92.01 Mod 0 and later
Target Release for Correction 95.02
Manager, ASD
Signature Title
R & D Division
Michael H. Swanger August 17, 1995
Typed or Printed Name Date of Signature
Signature Title
Professional Services Division
Typed or Printed Name Date of Signature
Rev. 2.2
GTSTRUDL Program Report Form
(Continued)
GPRF No.: 95.15
DATE: August 17, 1995
DESCRIPTION:
Reinforced concrete P-[symbol omitted] analysis aborts if members
having variable properties are present in the model. A workaround is to
represent each segment in the variable-property members as an individual
prismatic member. This will require additional joints and members.
Applicable sections of the User's Manual:
Section 2.1.9.2, Volume 1 The MEMBER PROPERTIES Command
Section 8, Volume 4 Consideration of Column Slenderness
Rev. 2.2
*** END OF DOCUMENT ***