The U.S. Nuclear Regulatory Commission (NRC) receives reports from its licensees under Part 21 of Title 10 of the Code of Federal Regulations. This regulation specifies the conditions under which information must be submitted when a licensed facility, activity, or basic component fails to comply with the Atomic Energy Act of 1954, as amended, or other NRC regulations.

Recently Updated Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log No. Notifier Description Report Date Event No. / Accession No.
2015-87-03 Homewood Products Corporation Final Report on Part 21 Issue with Irradiations Performed by Steris Isomedix Services 05/13/2016 ML16145A069
2016-21-00 Curtiss-Wright Nuclear Division Potential Defect Applicable to Hytork XL1126 Pneumatic Actuators 05/13/2016 ML16139A831
2016-20-01 AZZ/Nuclear Logistics Inc. Masterpact NT and NW Style Circuit Breakers Failed to Electrically Close Following an Anti-Pump Condition (Updated) 05/13/2016 ML16139A832
2016-20-00 AZZ/Nuclear Logistics Inc. Masterpact NT and NW Style Circuit Breakers Failed to Electrically Close Following an Anti-Pump Condition 05/12/2016 ML16139A833
2016-19-00 Electroswitch Part 21 Notification on Various Electroswitch Products Sold as Safety Class 1E 05/10/2016 ML16139A834
2016-25-00 WECTEC LLC Interim Part 21 Report Regarding a Weld Deviation on Structural Module CB36 for the Vogtle Unit 3 AP1000 Project 05/06/2016 ML16140A115
2016-11-01 Rotork Controls, Inc. Part 21 Notification Concerning V12 [Part No N69-921] and K5 [N69-838 & N69·926] Safety Related Micro Switches 05/04/2016 ML16127A595
2016-16-01 National Technical Systems Updated Potential Part 21 on Siemens 401-158 Safety Clip used on Type 3AF Circuit Breakers 04/29/2016 ML16126A111
2015-88-01 CB&I AREVA MOX Services Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 04/26/2016 ML16118A372
2016-18-00 WECTEC LLC Interim Part 21 Report Regarding Disposition Of A Nonconformance On Submodule CA03-16 For The V. C. Summer Unit 2 AP1000 Project 04/22/2016 ML16118A306
2016-15-00 Emerson Process Management Safety Related Fisher Controls Type 3582G Positioner Travel Pin Lock Erroneously Provided as Commercial Grade 04/14/2016 ML16113A334
2016-17-00 WECTEC LLC Interim Report Regarding Shield Wall Panel Dimensions for V. C. Summer Unit 2 AP1000 Project 04/14/2016 ML16111B134
2016-14-00 Prairie Island Units 1 and 2 Interim Report of a Deviation or Failure to Comply Related to a Load Sequencer Undervoltage Relay 04/14/2016 ML16106A207
2015-75-02 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 04/12/2016 ML16110A262
2015-26-01 AZZ / Nuclear Logistics Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Update) 04/08/2016 ML16109A177
2016-07-01 Louisiana Energy Services Final Report for Potential 10 CFR 21 Notification 04/06/2016 ML16104A403
2015-87-02 Homewood Products Corporation Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Updated) 03/22/2016 ML16102A078
2016-13-00 United Controls International Part 21 Notification for Mersen (formerly Ferraz Shawmut) OT15 Fuses 03/22/2016 ML16098A446
2015-20-01 United Controls International Follow Up to Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module 03/22/2016 ML16098A445
2016-12-00 Emerson Process Management – Fisher Controls Plug/Stem Assembly Groove Pin Dedication 03/18/2016 ML16084A302
2016-11-00 Rotork Controls, Inc. Interim Report Related to a Basic Micro Switch Which Did Not Change State 03/18/2016 ML16088A087
2016-16-00 National Technical Systems Potential Part 21 on Siemens 401-158 Safety Clip used on Type 3AF Circuit Breakers 03/14/2016 ML16112A210
2016-10-00 Anvil Engineered Pipe Supports Hydraulic Snubber Seal Material Deviation Interim Report 03/14/2016 ML16076A262
2016-01-02 Emerson Process Management - Fisher Controls Non-Dedicated Commercial Grade Cap Screws Provided with Safety Related Fisher Type 3570 Positioners 03/11/2016 ML16076A261
2015-86-02 WECTEC LLC (formerly CB&I Power) Updated Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects 03/09/2016 ML16076A263
2016-09-00 Peach Bottom Unit 3 Loss of High Pressure Coolant Injection System Function as a Result of Failed Flow Controller Signal Converter (a 50.73 Report) 02/26/2016 ML16057A011
2016-08-01 Nuclear Logistics, Inc. Initial Notification of a Potential 10 CFR 21 Condition Relating to Freedom Series Starter/Contactors 02/26/2016 ML16061A011
2016-03-01 Curtiss-Wright Nuclear Division Part 21 – Final Status and Closeout of a Notification of a Potential Defect in Okonite Tape Splices 02/22/2016 ML16055A122
2016-08-00 Nuclear Logistics, Inc. Initial Notification of a Potential 10 CFR 21 Condition Relating to Freedom Series Starter/Contactors 02/18/2016 ML16061A010
2014-02-01 CCI Thermal Technologies, Inc. Closure of Nonconformance of an Electrical Tubular Water Heater 02/12/2016 ML16048A250
2015-86-01 WECTEC LLC (formerly CB&I Power) Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects 02/03/2016 ML16039A257
2014-56-02 Nutherm International, Inc. Final Update on Part 21 Issue Regarding Incorrect Industrial Irradiation Dose 02/03/2016 ML16039A269
2016-01-01 Emerson Process Management - Fisher Controls Non-Dedicated Commercial Grade Cap Screws Provided with Safety Related Fisher Type 3570 Positioners (Update) 02/02/2016 EN 51643
2016-07-00 Louisiana Energy Services Interim Report for Potential 10 CFR 21 Notification 02/02/2016 ML16035A489
2016-06-00 Curtiss-Wright Nuclear Division Interim Report Regarding Qualification/Verification Testing of Reversed Engineered (HCU) Accumulators Used in the Control Rod Drive System of Boiling Water Reactors 02/02/2016 ML16035A253
2015-69-01 WECTEC LLC (formerly CB&I Power) Part 21 Report Regarding Deviations of Pipe Spools for AP1000 Projects 02/01/2016 ML16039A256
2016-04-00 Emerson Process Management – Fisher Controls Improper Accessory Mounting Bracket Processing 01/29/2016 ML16039A255
2016-05-00 Canberra Industries, Inc. Interim Part 21 Report Related to Several Improperly Dedicated Commercial Grade Components 01/26/2016 ML16035A254
2016-03-00 Curtiss-Wright Nuclear Division Notification of a Potential Defect in Okonite Tape Splices 01/22/2016 ML16028A103
2015-78-01 WECTEC LLC (formerly CB&I Power) Updated Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project 01/21/2016 ML16053A285
2015-75-01 WECTEC LLC (formerly CB&I Power) Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 01/21/2016 ML16053A286
2014-88-01 WECTEC LLC (formerly CB&I Power) Closure of Interim Report Regarding Deviations of Procurement Documents and Materials for AP1000 Projects 01/15/2016 ML16034A222
2016-01-00 Emerson Process Management - Fisher Controls Non-Dedicated Commercial Grade Cap Screws Provided with Safety Related Fisher Type 3570 Positioners 01/08/2016 ML16014A223
2015-87-01 Homewood Products Corporation Part 21 Issue on Irradiations performed by Steris Isomedix Services 01/08/2016 ML16012A502
2012-56-01 CB&I AREVA MOX Services Nonconforming Welds on a Pellet Handling Transfer Glovebox (Updated) 01/07/2016 ML16007A113
2016-02-00 WECTEC LLC (formerly CB&I Power) Interim Report Regarding Leak Chase Deviations for Vogtle Unit 4 and V. C. Summer Unit 3 AP1000 Projects 01/05/2016 ML16008A959