Home
>
NRC Library
>
Document Collections
>
Commission Documents
>
Recently
Released Commission Documents
> 2013
Recently Released Commission Documents for 2013
| Release Date | SECY Number |
Description | SECY Paper | SRM | CVR | Trans- cript |
|---|---|---|---|---|---|---|
| 05/22/2013 | 05/29/2013 Meeting Slides: Briefing on Results of the Agency Action Review Meeting (AARM) | |||||
| 05/22/2013 | 05/29/2013 Meeting Agenda: Briefing on Results of the Agency Action Review Meeting (AARM) | |||||
| 05/21/2013 | 05/20/2013 Commission Meeting: Briefing on Human Capital and Equal Employment Opportunity (EEO) | |||||
| 05/21/2013 | Letter from Chairman Allison M. Mcfarlane to Senator Mary L. Landrieu, regarding the effects of sequestration on NRC's small business contracting | |||||
| 05/17/2013 | 04/22/2013 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation | |||||
| 05/15/2013 | 05/28/2013 Briefing on Security Issues (Closed – Ex. 1) – Full Written Explanation | |||||
| 05/15/2013 | SECY-13-0052 | Weekly Information Report – Week Ending May 3, 2013 | ||||
| 05/15/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Scott Peters, regarding possible restart of the San Onofre Nuclear Generating Station (SONGS) | |||||
| 05/14/2013 | 05/20/2013 Meeting Slides: Briefing on Human Capital and Equal Employment Opportunity (EEO) | |||||
| 05/14/2013 | 05/20/2013 Meeting Agenda: Briefing on Human Capital and Equal Employment Opportunity (EEO) | |||||
| 05/13/2013 | COMSECY-12-0026 | Revisions to Proposed Rule: Amendments to Material Control and Accounting Regulations (RIN 3150-AI61) | ||||
| 05/10/2013 | COMSECY-13-0006 | 10 CFR 50.46c Rulemaking: Request to Defer Draft Guidance and Extension Request for Final Rule and Final Guidance | ||||
| 05/09/2013 | SECY-13-0045 | Direct Final Rule: Safeguards Information – Modified Handling Categorization Change for Materials Facilities (RIN 3150-AJ18) | ||||
| 05/07/2013 | SECY-13-0044 | Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting | ||||
| 05/03/2013 | Letter from Chairman Allison M. Macfarlane to Senator Barbara Boxer, response to letter regarding issues with the steam generator tubes at the San Onofre Nuclear Generating Station and concerns regarding Southern California Edison’s April 5, 2013 license amendment request for Unit 2 | |||||
| 05/03/2013 | SECY-13-0047 | Weekly Information Report – Week Ending April 26, 2013 | ||||
| 05/03/2013 | SECY-12-0071 | Final Rule: Domestic Licensing of Source Material - Amendments/Integrated Safety Analysis (RIN 3150-AI50) | ||||
| 05/03/2013 | SECY-12-0071 | Staff Requirements Memorandum: Final Rule: Domestic Licensing of Source Material - Amendments/Integrated Safety Analysis (RIN 3150-AI50) | ||||
| 05/03/2013 | SECY-13-0006 | Commission Order to Designate an Interim Class of U.S Nuclear Regulatory Commission-Licensed Facilities that are Eligible to Apply to the Commission for Preemption Authority Under Section 161a of the Atomic Energy Act of 1954, as Amended | ||||
| 05/02/2013 | 04/22/2013 Commission Meeting: Meeting with Department of Energy Office of Nuclear Energy | |||||
| 05/01/2013 | SECY-13-0006 | Staff Requirements Memorandum: Commission Order to Designate An Interim Class of U.S. Nuclear Regulatory Commission-Licensed Facilities That Are Eligible to Apply to the Commission for Preemption Authority Under Section 161A of the Atomic Energy Act of 1954, As Amended | ||||
| 05/01/2013 | SECY-13-0042 | Construction Reactor Oversight Process Self-Assessment for Calendar Year 2012 | ||||
| 04/30/2013 | COMSECY-13-0010 | Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned | ||||
| 04/30/2013 | Staff Requirements Memorandum: Briefing on the Status of Lessons Learned from the Fukushima Dai-ichi Accident | |||||
| 04/30/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Tim Ryan in response to his letter outlining his concerns regarding ongoing agency activities resulting from the Fukushima accident in Japan, pertaining to Mark I and Mark II containments | |||||
| 04/26/2013 | SECY-13-0046 | Weekly Information Report - Week Ending April 19, 2013 | ||||
| 04/25/2013 | 04/23/2013 Briefing on the Status of Lessons Learned from the Fukushima Dai-ichi Accident | |||||
| 04/24/2013 | 04/22/2013 Commission Meeting: Meeting with Department of Energy Office of Nuclear Energy | |||||
| 04/23/2013 | SECY-13-0038 | Fiscal Year 2012 Results of the Industry Trends Program for Operating Power Reactors | ||||
| 04/23/2013 | Letter from Chairman Allison M. Macfarlane to Senator David Vitter, regarding ongoing agency activities resulting from the Fukushima accident in Japan | |||||
| 04/23/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Lou Barletta, regarding a prospectus for a replacement lease for the NRC in Suburban Maryland | |||||
| 04/23/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding ongoing agency activities resulting from the Fukushima accident in Japan, specifically Mark I and Mark II containments | |||||
| 04/23/2013 | Letter from Chairman Allison M. Macfarlane to Senator Barbara Boxer, regarding ongoing agency activities resulting from the Fukushima accident in Japan, specifically Mark I and Mark II containments | |||||
| 04/12/2013 | SECY-13-0043 | Weekly Information Report - Week Ending April 12, 2013 | ||||
| 04/22/2013 | SECY-13-0037 | Reactor Oversight Process Self-Assessment for Calendar Year 2012 | ||||
| 04/19/2013 | SECY-13-0036 | Annual Report to the Commission on Licensee Performance in the Materials and Waste Programs Fiscal Year 2012 | ||||
| 04/19/2013 | SECY-13-0033 | Allowing Interim Operation Under Title 10 of the Code of Federal Regulations Section 52.103 | ||||
| 04/19/2013 | Letter from Chairman Allison M. Macfarlane to Senator Barbara Boxer, regarding an update on NRC's progress in addressing recommendations related to the agency's response to the accident at Fukushima Dai-ichi | |||||
| 04/17/2013 | Letter from Chairman Allison M. Macfarlane to Congress and OMB, providing NRC’s Fiscal Year 2014 Congressional Budget Justification | |||||
| 04/17/2013 | 04/23/2013 Meeting Slides: Briefing on the Status of Lessons Learned from the Fukushima Dia-ichi Accident | |||||
| 04/17/2013 | 04/23/2013 Meeting Agenda: Briefing on the Status of Lessons Learned from the Fukushima Dia-ichi Accident | |||||
| 04/17/2013 | 04/22/2013 Meeting Slides: Meeting with Department of Energy Office of Nuclear Energy | |||||
| 04/17/2013 | 04/22/2013 Meeting Agenda: Meeting with Department of Energy Office of Nuclear Energy | |||||
| 04/12/2013 | SECY-13-0041 | Weekly Information Report - Week Ending April 5, 2013 | ||||
| 04/12/2013 | SECY-13-0031 | Status of Regulatory Guide Update Program | ||||
| 04/12/2013 | SECY-12-0167 | Closure of Petition for Rulemaking to Require Installation of Radiation Alarms for Rooms Housing Neutron Sources (Prm-73-15) | ||||
| 04/12/2013 | Staff Requirements Memorandum: Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) | |||||
| 04/08/2013 | SECY-13-0034 | Weekly Information Report - Week Ending March 29, 2013 | ||||
| 04/08/2013 | SECY-13-0029 | History of the Use and Consideration of the Large Release Frequency Metric by the U.S. Nuclear Regulatory Commission | ||||
| 04/04/2013 | Letter from Chairman Allison M. Macfarlane to Congress, OPM, EEOC, and DOJ, providing the NRC’s FY-2012 Annual Report on the Notification and Federal Employee Antidiscrimination and Retaliation (No FEAR) Act of 2002 | |||||
| 04/04/2013 | 04/02/2013 Commission Meeting: Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) | |||||
| 04/03/2013 | SECY-13-0032 | Weekly Information Report - Week Ending March 22, 2013 | ||||
| 04/02/2013 | 04/02/2013 Commission Meeting: Affirmation Session | |||||
| 04/02/2013 | CLI-13-05 | The Shaw Group Inc. | ||||
| 04/02/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding the use of a specific format for public meetings regarding the 2012 performance of both Pilgrim and Seabrook nuclear power plants | |||||
| 03/26/2013 | SECY-13-0001 | Staff Recommendations for Improving the Integration of the Ongoing 10 CFR Part 61 Rulemaking Initiatives | ||||
| 03/26/2013 | 03/26/2013 Meeting Slides: Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) | |||||
| 03/26/2013 | 03/26/2013 Meeting Agenda: Meeting with Organization of Agreement States (OAS) and Conference of Radiation Control Program Directors (CRCPD) | |||||
| 03/22/2013 | SECY-12-0160 | Proposed Rule: Petition for Rulemaking Process (Rin 3150-AI30); Expanded Authority of Executive Director for Operations to Deny Petitions for Rulemaking Under Management Directive 6.3 | ||||
| 03/21/2013 | SECY-13-0028 | Weekly Information Report - Week Ending March 15, 2013 | ||||
| 03/20/2013 | 04/22/2013 Discussion of Management and Personnel Issues (Closed – Ex. 2 and 6) – Full Written Explanation | |||||
| 03/20/2013 | SECY-12-0110 | Consideration of Economic Consequences Within the U.S. Nuclear Regulatory Commission’s Regulatory Framework | ||||
| 03/19/2013 | SECY-12-0157 | Consideration of Additional Requirements for Containment Venting Systems for Boiling Water Reactors with Mark I and Mark II Containments | ||||
| 03/14/2013 | SECY-12-0137 | Implementation of the Cumulative Effects of Regulation Process Changes | ||||
| 03/14/2013 | SECY-13-0027 | Weekly Information Report - Week Ending March 8, 2013 | ||||
| 03/14/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Edward J. Markey, regarding addition of engineered filters to venting systems for Mark I and Mark II containments | |||||
| 03/14/2013 | SECY-12-0168 | Calvert Cliffs 3 Nuclear Project, LLC & Unistar Nuclear Operating Services, LLC (Calvert Cliffs Nuclear Power Plant, Unit 3), Docket No. 52-016-COL, Petition For Review of LBP-12-19 | ||||
| 03/12/2013 | SECY-12-0137 | Implementation of the Cumulative Effects of Regulation Process Changes | ||||
| 03/11/2013 | Letter from Chairman Allison M. Macfarlane to Congressman John Barrow regarding concerns about ongoing NRC activities resulting from the Fukushima accident in Japan | |||||
| 03/11/2013 | 03/11/2013 Commission Meeting: Affirmation Session | |||||
| 03/11/2013 | CLI-13-04 | Calvert Cliffs 3 Nuclear Project, LLC & Unistar Nuclear Operating Services, LLC | ||||
| 03/11/2013 | Letter from Chairman Allison M. Macfarlane to Congress, GAO, and OMB providing a summary of actions taken by the NRC in response to recommendations contained in various GAO reports that address NRC activities | |||||
| 03/08/2013 | SECY-13-0026 | Weekly Information Report - Week Ending March 1, 2013 | ||||
| 03/08/2013 | Staff Requirements Memorandum: Briefing on Uranium Recovery | |||||
| 03/07/2013 | COMSECY-13-0002 | Consolidation of Japan Lessons Learned Near-Term Task Force Recommendations 4 and 7 Regulatory Activities | ||||
| 03/06/2013 | Letter from Chairman Allison M. Macfarlane to Senator Frank L. Lautenberg regarding the safety of the Oyster Creek Nuclear Generating Station following Hurricane Sandy | |||||
| 03/05/2013 | Staff Requirements Memorandum: Briefing on Public Participation in NRC Regulatory Decision-Making | |||||
| 03/04/2013 | SECY-13-0020 | Third 6-Month Status Update on Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Subsequent Tsunami | ||||
| 03/01/2013 | Letter from Chairman Allison M. Macfarlane to Senator Robert Menendez regarding Oyster Creek Nuclear Generating Station | |||||
| 02/28/2013 | SECY-12-0161 | Status Update: Tasks Related to Alternative Dispute Resolution in the Allegation and Enforcement Programs | ||||
| 02/28/2013 | SECY-13-0023 | Weekly Information Report - Week Ending February 22, 2013 | ||||
| 02/26/2013 | 02/20/2013 Commission Meeting: Briefing on Uranium Recovery | |||||
| 02/25/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Fred Upton, et al, regarding ongoing NRC activities resulting from the Fukushima accident in Japan | |||||
| 02/22/2013 | SECY-13-0022 | Weekly Information Report - Week Ending February 15, 2013 | ||||
| 02/20/2013 | 02/20/2013 Commission Meeting: Affirmation Session | |||||
| 02/20/2013 | CLI-13-03 | Nextera Energy Seabrook, LLC | ||||
| 02/19/2013 | SECY-12-0166 | Proposed Rule: Revisions to Transportation Safety Requirements and Harmonization with International Atomic Energy Agency Transportation Requirements (RIN 3150-AI11) | ||||
| 02/15/2013 | SECY-13-0019 | Weekly Information Report - Week Ending February 8, 2013 | ||||
| 02/15/2013 | Staff Requirements Memorandum: Briefing on Steam Generator Tube Degradation | |||||
| 02/15/2013 | Staff Requirements Memorandum: Briefing on Equal Employment Opportunity (EEO) and Small Business Programs | |||||
| 02/13/2013 | 02/20/2013 Meeting Slides: Briefing on Uranium Recovery | |||||
| 02/13/2013 | SECY-13-0013 | Annual Report on Court Litigation (Calendar Year 2012) | ||||
| 02/13/2013 | 02/20/2013 Meeting Agenda: Briefing on Uranium Recovery | |||||
| 02/12/2013 | 02/07/2013 Commission Meeting: Briefing on Steam Generator Tube Degradation | |||||
| 02/12/2013 | SECY-13-0016 | Weekly Information Report - Week Ending February 1, 2013 | ||||
| 02/11/2013 | Letter from Chairman Allison Macfarlane to Senator Barbara Boxer regarding the Mitsubishi Heavy Industries (MHI) document entitled, “Root Cause Analysis Report for Tube Wear Identified in the Unit 2 and 3 Steam Generators of San Onofre Generating Station" | |||||
| 02/11/2013 | Letter from Chairman Allison M. Macfarlane to new Members of Congress congratulating them on their election to the U.S. House of Representatives | |||||
| 02/08/2013 | COMGEA-12-0001/ COMWDM-12-0002 |
Proposed Initiative to Improve Nuclear Safety and Regulatory Efficiency | ||||
| 02/06/2013 | SECY-13-0014 | Weekly Information Report - Week Ending January 25, 2013 | ||||
| 02/05/2013 | 02/01/2013 Commission Meeting: Briefing on Equal Employment Opportunity (EEO) and Small Business Programs | |||||
| 02/05/2013 | 01/31/2013 Commission Meeting: Briefing on Public Participation in NRC Regulatory Decision-Making | |||||
| 02/04/2013 | SECY-13-0012 | Weekly Information Report - Week Ending January 18, 2013 | ||||
| 01/31/2013 | 02/07/2013 Meeting Slides: Briefing on Steam Generator Tube Degradation | |||||
| 01/31/2013 | 02/07/2013 Meeting Agenda: Briefing on Steam Generator Tube Degradation | |||||
| 01/31/2013 | 01/31/2013 Commission Meeting: Affirmation Session | |||||
| 01/31/2013 | 01/09/2013 Commission Meeting: Affirmation Session | |||||
| 01/31/2013 | CLI-13-02 | All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Effective Immediately) All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status: Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) |
||||
| 01/29/2013 | Staff Requirements Memorandum: Briefing on Venting Systems for Mark I and Mark II Containments | |||||
| 01/25/2013 | SECY-13-0006 | Commission Order to Designate an Interim Class of U.S Nuclear Regulatory Commission-Licensed Facilities that are Eligible to Apply to the Commission for Preemption Authority Under Section 161a of the Atomic Energy Act of 1954, as Amended | ||||
| 01/25/2013 | SECY-13-0004 | 2012 Annual Report on Commission Adjudication | ||||
| 01/25/2013 | 02/01/2013 Meeting Slides: Briefing on Equal Employment Opportunity (EEO) and Small Business Programs | |||||
| 01/25/2013 | 02/01/2013 Meeting Agenda: Briefing on Equal Employment Opportunity (EEO) and Small Business Programs | |||||
| 01/24/2013 | 01/31/2013 Meeting Slides: Briefing on Public Participation in NRC Regulatory Decision-Making | |||||
| 01/24/2013 | 01/31/2013 Meeting Agenda: Briefing on Public Participation in NRC Regulatory Decision-Making | |||||
| 01/23/2013 | SECY-13-0011 | Weekly Information Report - Week Ending January 11, 2013 | ||||
| 01/22/2013 | 02/21/2013 Briefing on Threat Environment Assessment (Closed – Ex. 1) – Full Written Explanation | |||||
| 01/22/2013 | 01/08/2013 Commission Meeting: Briefing on Fort Calhoun | |||||
| 01/18/2013 | SECY-13-0009 | Weekly Information Report - Week Ending January 4, 2013 | ||||
| 01/16/2013 | SECY-13-0001 | Staff Recommendations for Improving the Integration of the Ongoing 10 CFR Part 61 Rulemaking Initiatives | ||||
| 01/15/2013 | 01/09/2013 Commission Meeting: Briefing on Venting Systems for Mark I and Mark II Containments | |||||
| 01/10/2013 | SECY-12-0112 | Policy Statements on Agreement State Programs | ||||
| 01/10/2013 | 01/08/2013 Meeting: Briefing on Fort Calhoun | |||||
| 01/09/2013 | 01/09/2013 Commission Meeting: Affirmation Session | |||||
| 01/09/2013 | SECY-13-0003 | Weekly Information Report - Week Ending December 28, 2012 | ||||
| 01/09/2013 | CLI-13-01 | Honeywell International, Inc. | ||||
| 01/09/2013 | Letter from Chairman Allison M. Macfarlane to Congressman Raul M. Grijalva, responding to a request that the San Onofre Nuclear Generating Station (SONGS) remain offline until public safety can be assured | |||||
| 01/08/2013 | SECY-12-0034 | Proposed Rulemaking - 10 CFR 50.46c: Emergency Core Cooling System Performance During Loss-Of-Coolant Accidents (RIN 3150-AH42) | ||||
| 01/07/2013 | SECY-13-0002 | Weekly Information Report - Week Ending December 21, 2012 | ||||
| 01/03/2013 | 01/09/2013 Meeting Slides: Briefing on Venting Systems for Mark I and Mark II Containments | |||||
| 01/03/2013 | 01/09/2013 Meeting Agenda: Briefing on Venting Systems for Mark I and Mark II Containments |
Page Last Reviewed/Updated Wednesday, May 22, 2013
Commission documents are filed in the collections based on the year issued, not on the release date of the document. For example, SECY-08-0011 will be listed in the 2008 collection, COMSECY-07-0035 in the 2007 collection and an SRM or CVR associated with a particular SECY Paper will be found in the year that corresponds to the SECY Paper number (e.g. SRM on SECY-08-0001 will be found in the 2008 collection).