Commission Action Memoranda (COM) for 2014

As a general policy, COMs and COMSECYs will be released to the public unless they contain specific limited types of information which warrant protection. Missing numbers in the listing indicate that these papers involve matters which the Commission has specifically agreed should be withheld: Classified, Safeguards, Allegation, Investigation, Security-Related, Proprietary, Privacy Act Information, Federal/State/Foreign Government and International Agency-Controlled Information, Adjudicatory, Enforcement, Lawyer-Client or Legal Work Product, and limited sensitive matters which contain a specific withhold recommendation and supporting justification. (Reference Internal Commission Procedures, Chapter II.)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Description Date
COMSECY-14-0041

Yucca Mountain Project Activities

12/24/2014
Staff Requirements –Yucca Mountain Project Activities 02/03/2015
Commission Voting Record –Yucca Mountain Project Activities 02/03/2015
COMSECY-14-0038 Tasking to Develop Material Categorization for Potential Reprocessing Facilities 11/25/2014
Staff Requirements – Tasking to Develop Material Categorization for Potential Reprocessing Facilities 12/30/2014
Commission Voting Record – Tasking to Develop Material Categorization for Potential Reprocessing Facilities 12/30/2014
COMSECY-14-0037 Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluaton of Flooding Hazards 11/21/2014
Staff Requirements – Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluaton of Flooding Hazards 03/30/2015
Commission Voting Record – Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluaton of Flooding Hazards 03/30/2015
COMSECY-14-0033 Public Release of Report, "A Preliminary Numerical Study of the Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central California" 10/10/2014
Staff Requirements – Public Release of Report, "A Preliminary Numerical Study of the Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central California" 11/05/2014
Commission Voting Record – Public Release of Report, "A Preliminary Numerical Study of the Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central California" 11/05/2014
COMSECY-14-0030 Proposed Suspension of the Reactor Oversight Process Self – Assessment for Calendar Year 2014  
Staff Requirements – Proposed Suspension of the Reactor Oversight Process Self – Assessment for Calendar Year 2014 09/19/2014
Commission Voting Record – Proposed Suspension of the Reactor Oversight Process Self – Assessment for Calendar Year 2014 09/19/2014
COMSECY-14-0028 Agreement State Program Policy Statements:  Update on Recent Activities and Recommendations for Path Forward 07/14/2014
Staff Requirements – Agreement State Program Policy Statements:  Update on Recent Activities and Recommendations for Path Forward 08/12/2014
Commission Voting Record – Agreement State Program Policy Statements:  Update on Recent Activities and Recommendations for Path Forward 08/12/2014
COMSECY-14-0020 Revisions to Direct Final Rule:  Safeguards Information - Modified Handling Categorization Change for Materials Facilities (RIN 3150-AJ18) 05/26/2014
Staff Requirements – Revisions to Direct Final Rule: Safeguards Information - Modified Handling Categorization Change for Materials Facilities (RIN 3150-AJ18) 08/26/2014
Chairman Macfarlane's vote on – Revisions to Direct Final Rule: Safeguards Information - Modified Handling Categorization Change for Materials Facilities (RIN 3150-AJ18) 07/03/2014
Commissioner Svinicki's vote on – Revisions to Direct Final Rule: Safeguards Information - Modified Handling Categorization Change for Materials Facilities (RIN 3150-AJ18) 07/21/2014
Commissioner Magwood's vote on – Revisions to Direct Final Rule: Safeguards Information - Modified Handling Categorization Change for Materials Facilities (RIN 3150-AJ18) 07/09/2014
Commissioner Ostendorff's vote on – Revisions to Direct Final Rule: Safeguards Information - Modified Handling Categorization Change for Materials Facilities (RIN 3150-AJ18) 06/27/2014
COMSECY-14-0018 Revisions to Proposed Rule:  Medical Use of Byproduct Material - Medical Event Definitions, Training and Experience, Clarifying Amendments (RIN 3150-AI63) 05/15/2014
Staff Requirements – Revisions to Proposed Rule:  Medical Use of Byproduct Material - Medical Event Definitions, Training and Experience, Clarifying Amendments (RIN 3150-AI63) 06/26/2014
Commission Voting Record – Revisions to Proposed Rule:  Medical Use of Byproduct Material - Medical Event Definitions, Training and Experience, Clarifying Amendments (RIN 3150-AI63) 06/26/2014
COMSECY-14-0015 Security Inspections at U.S. Nuclear Regulatory Commission Decommissioning Power Reactors 04/23/2014
Staff Requirements – Security Inspections at U.S. Nuclear Regulatory Commission Decommissioning Power Reactors 05/28/2014
Commission Voting Record – Security Inspections at U.S. Nuclear Regulatory Commission Decommissioning Power Reactors 05/28/2014
COMSECY-14-0014 Cumulative Effects of Regulation and Risk Prioritization Initiative: Update on Recent Activities and Recommendations for Path Forward 04/09/2014
Staff Requirements – Cumulative Effects of Regulation and Risk Prioritization Initiative: Update on Recent Activities and Recommend 07/18/2014
Commissioner Svinicki's vote on COMSECY-14-0014 – Cumulative Effects of Regulation and Risk Prioritization Initiative: Update on Recent Activities and Recommendations for Path Forward 06/09/2014
Chairman Macfarlane's vote on COMSECY-14-0014 – Cumulative Effects of Regulation and Risk Prioritization Initiative: Update on Recent Activities and Recommendations for Path Forward 05/29/2014
Commissioner Ostendorff's vote on COMSECY-14-0014 – Cumulative Effects of Regulation and Risk Prioritization Initiative: Update on Recent Activities and Recommendations for Path Forward 05/27/2014
Commissioner Magwood's vote on COMSECY-14-0014 – Cumulative Effects of Regulation and Risk Prioritization Initiative: Update on Recent Activities and Recommendations for Path Forward 05/13/2014
COMSECY-14-0013 Yucca Mountain Project Activities 04/09/2014
Staff Requirements – Yucca Mountain Project Activities 05/19/2014
COMSECY-14-0002 Renewal of Advisory Committee on Medical Isotopes (Acmui) Charter 01/23/2014
Staff Requirements – Renewal of Advisory Committee on Medical Isotopes (Acmui) Charter 01/30/2014
Commission Voting Record – Renewal of Advisory Committee on Medical Isotopes (Acmui) Charter 01/30/2014
COMWDM-14-0002 Improving Safety and Regulatory Effectiveness by Enhancing the NRC's Framework for Risk-Informed Decision Making 06/13/2014
Memorandum –Improving Safety and Regulatory Effectiveness by Enhancing the NRC's Framework for Risk-Informed Decision Making 08/01/2014
Commission Voting Record – Improving Safety and Regulatory Effectiveness by Enhancing the NRC's Framework for Risk-Informed Decision Making 08/01/2014
COMAMM-14-0001/
COMWDM-14-0001
Background and Proposed Direction to NRC Staff to Verify Assumptions Made Concerning Patient Release Guidance 03/10/2014
Staff Requirements – Background and Proposed Direction to NRC Staff to Verify Assumptions Made Concerning Patient Release Guidance 04/28/2014
Commission Voting Record – Background and Proposed Direction to NRC Staff to Verify Assumptions Made Concerning Patient Release Guidance 04/28/2014
COMWCO-14-0001/
COMGEA-14-0001
Proposed Initiative to Conduct a Lessons-Learned Review of the NRC's Force-On-Force Inspection Program 01/06/2014
Staff Requirements – Proposed Initiative to Conduct a Lessons-Learned Review of the NRC's Force-On-Force Inspection Program 02/11/2014
Commission Voting Record – Proposed Initiative to Conduct a Lessons-Learned Review of the NRC's Force-On-Force Inspection Program 02/11/2014