| Date |
Title |
| 12/17/2004 |
Risk-Informing 10 CFR 50.46, “Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors”  |
| 12/10/2004 |
Estimating Loss-of-Coolant Accident Frequencies Through the Elicitation Process  |
| 12/10/2004 |
Safety Evaluation of the Industry Guidelines Related to Pressurized Water Reactor Sump Performance  |
| 12/09/2004 |
Interim Letter – Regulatory Structure for New Plant Licensing: Technology-Neutral Framework  |
| 12/07/2004 |
Proposed Rule - AP1000 Design Certification  |
| 11/19/2004 |
Draft Proposed Rule on Post-Fire
Operator Manual Actions  |
| 11/18/2004 |
ACRS Assessment of the Quality of
Selected NRC Research Projects  |
| 11/18/2004 |
Lessons Learned from the ACRS Review
of the AP1000 Design  |
| 11/17/2004 |
Resolution of Certain Items Identified by the ACRS in NUREG-1740, “Voltage-Based Alternative Repair Criteria”  |
| 11/08/2004 |
Draft Regulatory Guide 1127, “Combining
Modal Responses and Spatial Components in Seismic Response Analysis”
|
| 11/08/2004 |
Proposed Rule: Fitness for Duty
(FFD) Programs, 10 CFR Part 26  |
| 11/02/2004 |
Report on “An Overview of
Differences in Nuclear Safety Regulatory Approaches and Requirements
Between United States and Other Countries”  |
| 10/22/2004 |
Proposed Resolution of Generic Safety
Issue 185, “Control of Recriticality Following Small-break LOCAs
in PWRs"  |
| 10/18/2004 |
Vermont Yankee Extended Power Uprate
Request  |
| 10/18/2004 |
Safety Evaluation of the Industry
Guidelines Related to Pressurized Water Reactor Sump Performance
|
| 10/14/2004 |
Review of ACR-700 Pre-Application
Safety Assessment Report  |
| 10/14/2004 |
Draft NUREG-XXXX, “The
Report on the Independent Verification of the Mitigating Systems Performance
Index (MSPI) Results for the Pilot Plants”  |
| 10/13/2004 |
Seabrook Station, Unit No. 1
- Advisory Committee on Reactor Safety Review of Stretch Power Uprate
Amendment (TAC No. MC2364)  |
| 10/12/2004 |
Draft Final Regulatory Guide
DG-1085, “Standard Format and Content of Decommissioning Cost
Estimates For Nuclear Power Reactors,” and NUREG-1713, “Standard
Review Plan for Decommissioning Cost Estimates For Nuclear Power Reactors”
|
| 10/12/2004 |
Draft NUREG/CR-6850, "EPRI/NRC-RES
Fire PRA Methodology for Nuclear Power Facilities”  |
| 09/16/2004 |
Report
on the Safety Aspects of the License Renewal Application for the Dresden
2 and 3 and Quad Cities 1 and 2 Nuclear Power Stations  |
| 09/14/2004 |
Draft
Regulatory Guide, DG-1.XXX, “Risk-informed, Performance-Based
Fire Protection for Existing Lightwater Nuclear Power Plants”
 |
| 09/10/2004 |
Proposed
Regulatory Guide 1.75, Revision 3, “Criteria For Independence
of Electrical Safety Systems”  |
| 07/20/2004 |
Report on the Safety Aspects
of the Westinghouse Electric Company Application for Certification
of the AP1000 Passive Plant Design  |
| 07/19/2004 |
Proposed Draft Final Generic
Letter on Potential Impact of Debris Blockage on Emergency Recirculation
During Design Basis Accidents at PWRs  |
| 07/15/2004 |
Regulatory Guide 1.97) to Deferral
of ACRS Review of Draft Regulatory Guide, DG-1128, Criteria for Accident
Monitoring Instrumentation for Nuclear Power Plants, (Revision 4 to
Regulatory Guide 1.97)  |
| 07/13/2004 |
Draft Final Revision to 10 CFR
50.55a, "Codes and Standards"  |
| 06/15/2004 |
Draft
Final 10 CFR 50.69, “Risk-Informed Categorization and Treatment
of Structures, Systems, and Components For Nuclear Power Reactors”
|
| 06/09/2004 |
Digital
Instrumentation and Controls Research Program  |
| 06/09/2004 |
Proposed
Revisions to Standard Review Plan Sections 5.2.3, 5.3.1, and 5.3.3
|
| 06/07/2004 |
Deferral
of ACRS Review of Draft SRP Chapter 13.0 “Conduct of Operation,”
Section 13.1.2 - 13.1.3, “Operating Organization” Revision
and Supporting Documents Until After Public Comment  |
| 06/03/2004 |
Draft
Regulatory Guide, DG-1130, “Criteria for Use of Computers in
Safety Systems of Nuclear Power Plants,” (Proposed Revision
2 to Regulatory Guide 1.152)  |
| 05/21/2004 |
Resolution
of Certain Items Identified by the ACRS in NUREG-1740, “Voltage-Based
Alternative Repair Criteria”  |
| 05/13/2004 |
Good
Practices for Implementing Human Reliability Analysis  |
| 05/07/2004 |
Use
of Mixed Oxide Lead Test Assemblies at the Catawba Nuclear Station
|
| 04/27/2004 |
SECY-04-0037,
“Issues Related to Proposed Rulemaking to Riskinform Requirements
Related to Large Break Loss-of-Coolant Accident (LOCA) Break Size
and Plans for Rulemaking on LOCA with Coincident Loss-of-Offsite Power”
 |
| 04/27/2004 |
Draft
Plan for Implementation of the Commission’s Phased Approach
to PRA Quality  |
| 04/26/2004 |
Proposed
Approach to Assess the Quality of NRC Research Projects  |
| 04/23/2004 |
Report
on the Safety Aspects of the License Renewal Application for the R.
E. Ginna Nuclear Power Plant  |
| 04/22/2004 |
Options
and Recommendations for Policy Issues Related to Licensing Non-light
Water Reactor Designs  |
| 04/20/2004 |
Draft
Final Amendments to 10 CFR Part 50, Appendix E Paragraphs IV.B and
IV.F.2.  |
| 03/18/2004 |
Draft
Final Revision 3 to Regulatory Guide 1.82, “Water Sources for
Long-Term Recirculation Cooling Following a Loss-of-Coolant Accident”
 |
| 03/18/2004 |
Report
on the Safety Aspects of the License Renewal Application for the H.
B. Robinson Steam Electric Plant, Unit 2  |
| 03/17/2004 |
ACRS
Reviews of the Westinghouse Electric Company Application for Certification
of the AP1000 Plant Design-Interim Letter  |
| 03/17/2004 |
Report
on the Safety Aspects of the License Renewal Application for the Virgil
C. Summer Nuclear Station  |
| 02/12/2004 |
Simplified
Boiling Water Reactor (ESBWR) Pre-Application Draft Safety Evaluation
Report for the Economic and Review  |
| 02/09/2004 |
Errata
Sheet for Regulatory Guides  |