The following is a list of correspondence on the Spent Fuel Pool Leak.
For additional information see
Spent Fuel Pools.
| Date |
Description |
| 10/19/09 |
Indian Point Nuclear Generating Units 1, 2 and 3 - NRC Inspection Report on the status of the Long-Term Groundwater Monitoring Program |
| 12/16/08 |
ROP Deviation Memo for inspection resources at Indian Point |
| 05/15/08 |
Entergy's letter discussing long-range plans for groundwater monitoring. |
| 05/13/08 |
Press Release I-08-032; NRC to Discuss Inspection of Company's Assessment of Groundwater Contamination at Indian Point Plant on May 20th. |
| 05/13/08 |
Indian Point Nuclear Generating Units 1 and 2 - NRC Inspection Report Nos. 05000003/2007010 and 05000247/2007010. |
| 12/19/07 |
Approved renewal of deviation from the Reactor Oversight Process to continue heightened NRC oversight of specific issues at the Indian Point Energy Center |
| 12/11/06 |
Memorandum to Luis A. Reyes, Executive Director of Operations, from Samuel Collins, Regional Administrator Region I,
requesting renewal of the deviation from Reactor Oversight Process to continue increased NRC oversight of specific issues
at Indian Point Energy Center associated with Entergy's groundwater contamination inspection effort; and activities
related to the reliability, availability, and testing of the new Indian Point Energy Center Alert Notification System. The
Executive Director of Operations approved the request on 12/21/06. |
| 11/13/06 |
Indian Point Nuclear Generating Unit 2 - NRC Inspection Report No. 05000247/2006004 |
| 11/07/06 |
Indian Point Nuclear Generating Unit 3 - NRC Inspection Report No. 05000286/2006004 |
| 08/11/06 |
Indian Point Nuclear Generating Unit 2 - NRC Inspection Report No. 05000247/2006003 |
| 08/03/06 |
Oak Ridge Institute of Science and Education (ORISE) reports of analytical results of various samples collected by NRC relative to ground water contamination at Indian Point
|
| 07/24/06 |
Indian Point Nuclear Generating Unit 3 - NRC Inspection Report No. 05000286/2006003 |
| 04/20/06 |
Potential Sources of Groundwater Contamination at Indian Point
|
| 04/10/06 |
Current Status/Future Plans Regarding Onsite Groundwater Contamination at IPEC |
| 03/16/06 |
Indian Point Nuclear Generating Unit 2 - NRC Special Inspection Report No. 05000247/2005011 |
| 02/13/06 |
Revised Monitoring Well MW-111 Tritium 30 Day Special Report |
| 11/03/05 |
Monitoring Well MW-111 Tritium 30 Day Special Report |
| 10/28/05 |
Memorandum to Luis A. Reyes, Executive Director of Operations,
from Samuel Collins, Regional Administrator Region I, requesting
deviation from Reactor Oversight Process to increase NRC oversight
of specific issues at Indian Point Energy Center. Specific issues
identified are: Unit 2 Spent Fuel Pool Leakage and On-Site Tritium
Contamination; and Reliability and Availability of the Alert Notification
System, i.e., Sirens. The request was approved on 10/31/2005.
The following Press Release pertains:
NRC Announces Enhanced Oversight of Indian Point |
| 10/07/05 |
Updated Special Inspection Charter - Indian Point No. 2 |
| 09/20/05 |
Letter from James W. Tuffey regarding Indian Point Spent Fuel Pool |
| 09/20/05 |
Special Inspection Charter-Indian Point Unit No. 2 |
| 09/20/05 |
Press Release I-05-049; NRC Performing Special Inspection at Indian
Point 2 Nuclear Plant; Small Amount of Leakage from Spent Fuel Pool
Under Review |