skip navigation links 
 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer BrowseAloud
secondary page banner Return to NRC Home Page
Reactor Vessel Head Degradation - News and Correspondence
2007
2006
2005
2004
2003
2002

News and Correspondence for 2005

This page lists, in chronological order, general news and correspondence on Reactor Vessel Head Degradation for 2005.

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Date
Description
7/28/05 Davis-Besse Nuclear Power Station NRC Integrated Inspection Report 05000346/2005007 and Office of Investigations Report NO. 3-2003-029
7/07/05 Upcoming Davis-Besse Problem Identification and Resolution (PI&R) Inspection
7/06/05 Operator Licensing Examination Approval
6/23/05 Davis-Besse Nuclear Power Station
NRC Emergency Preparedness Inspection Report
NO. 05000346/2005011(DRS)
6/10/05 Davis-Besse Nuclear Power Station
NRC Integrated Inspection Report 05000346/2005006
5/19/05 Closure of NRC Inspection Manual Chapter 0350 Oversight Panel for Davis-Besse Nuclear Power Station; Disposition of Findings Identified during the IMC 0350 Process; and Inspection Schedule Update (Inspection Report NO. 50-346/05-012)
5/05/05 Davis-Besse Nuclear Power Station
Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report no. 05000346/2005010(DRS)
4/30/05 Davis-Besse Nuclear Power Station NRC Integrated
Inspection and Special Inspection Report 05000346/2005005
4/21/05 Notice of Violation and Proposed Imposition of Civil Penalties - $5,450,000; (NRC Office of Investigations Report No. 3-2002-006; NRC Special Inspection Report No. 50-346/2002-08 (DRS)); Davis-Besse Nuclear Power Station
4/21/05 Order Prohibiting Involvement in NRC-Licensed Activities Issued to Individual - (NRC Special Inspection Report No. 50-346/2002-08 (DRS))
4/01/05 Davis-Besse Nuclear Power Station - Information Request for NRC Maintenance Rule Baseline Inspection
3/23/05 Davis-Besse Nuclear Power Station
Mid-Cycle Outage, NRC Special Inspection 05000346/2005003(DRS)
3/18/05 Davis-Besse Nuclear Power Station
NRC Integrated Inspection Report 05000346/2005002
3/18/05 Receipt of Davis-Besse reply to non-cited violation in IR04-14
3/18/05 Letter to Davis-Besse RE Administration of Licensing Exams During the Week of June 27, 2005
3/14/05 LER 05-001-00 for Davis-Besse Nuclear Power Station, Unit 1 Re Inadvertent Loss of Essential Bus and Start of Emergency Diesel Generator During Testing
3/14/05 Final Accident Sequence Precursor Analysis of February 2002 Operational Condition
3/04/05 Resubmittal of Redacted Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Report and Actions Plans for the Davis-Besse Nuclear Power Station
2/28/05 February 2005 Davis-Besse Monthly Status Report
2/14/05 Response to NRC IR 05000346-04-018, EA-04231 & EA-04-232
2/11/05 Davis-Besse Nuclear Power Station
NRC Integrated Inspection Report 05000346/2004016
1/30/05 Davis-Besse Nuclear Power Station NRC Problem Identification And Resolution Inspection Report No. 05000346/2004017
1/28/05 Letter to Mr. Gary Leidich, President
1/13/05 Davis-Besse Nuclear Power Station Special Emergency Preparedness Inspection - Discrepant Alert And Notification System Performance Indicator Data Inspection Report 05000346/2004018(DRS) Apparent Violations And Preliminary White Finding

(To top of page)