Home
>
Nuclear Reactors
>
Operating Reactors
>
Operational Experience
>
Reactor
Pressure Boundary Integrity Issues for Pressurized Water Reactors
> Pressurizer Issues
> News and Correspondence
News and Correspondence
This page lists, in chronological order, news and correspondence for Pressurizer Issues.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Description |
|---|---|
| 07/26/04 | Summary of June 3, 2004, Meeting with Nuclear Energy Institute, Materials Reliability Program and Industry to Discuss NRC Bulletin 2004-01 |
| 05/28/04 | NRC Bulletin 2004-01: Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors |
| 05/26/04 | SECY-04-0078 Proposed Bulletin: "Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors" |
| 05/20/04 | 6/03/04 Category 2 Meeting Notice. Purpose: To discuss with Industry, Bulletin 2004-XX, "Inspection of Alloy 82/182/600 Materials used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized Water Reactors." |
| 01/30/04 | Westinghouse Owners Group Letter regarding CE Fleet Pressurizer Heater Sleeve Inspection Program |
| 01/20/04 | Letter from Leslie N. Hartz, MRP, regarding Recommendations for Inspection of Alloy 600/82/182 Pressure Boundary Components. |
| 12/23/03 | Westinghouse Owners Group Letter regarding CE Fleet Operability Assessment Regarding Pressurizer Heater Sleeves |
| 11/19/03 | Letter from Frederick P. "Ted" Schiffley, II, WOG, to Brian Sheron, NRC, regarding Westinghouse Owners Group Activities to Address CE Plant Pressurizer Heater Sleeve Degradation Issues |
| 10/01/03 | Palo Verde Nuclear Generating Station Unit: Special Report No. 3-SR-2003-004 Boron Deposit Found at Control Element Drive Mechanism Vent |
| 09/23/03 | Palo Verde Nuclear Generating Station Unit 2: Special Report No. 2-SR-2003-00: Boron Deposit Found at Control Element Drive Mechanism Vent |
Page Last Reviewed/Updated Tuesday, May 07, 2013

