Pending Applications for Power Uprates

The following power uprates are currently under review by the NRC. The licensees for the following plants have not been authorized by the NRC to operate the plants at power levels that reflect the following increases.

(TYPE -- S = Stretch; E = Extended; MUR= Measurement Uncertainty Recapture)
(TBD = To Be Determined)

NO. PLANT % UPRATE MWt SUBMITTAL DATE PROJECTED COMPLETION
DATE
TYPE
1 Browns Ferry 2 14.3 494 06/25/2004 TBD E
2 Browns Ferry 3 14.3 494 06/25/2004 TBD E
3 Browns Ferry 1 14.3 494 06/28/2004 TBD E
4 Monticello 12.9 229 11/05/2008 TBD E
5 Grand Gulf 1 13.1 510 09/08/2010 March 2012 E
6 Turkey Point 3 15 344 10/21/2010 1st Quarter 2012 E
7 Turkey Point 4 15 344 10/21/2010 1st Quarter 2012 E
8 St. Lucie 1 11.9 320 11/22/2010 1st Quarter 2012 E
9 St. Lucie 2 11.9 320 02/25/2011 2nd Quarter 2012 E
10 Harris 1 1.6 48 04/28/2011 January 2012 MUR
11 Crystal River 3 15.5 405 06/15/2011 TBD E
12 Braidwood 1 1.6 58.4 06/23/2011 June 2012 MUR
13 Braidwood 2 1.6 58.4 06/23/2011 June 2012 MUR
14 Byron 1 1.6 58.4 06/23/2011 June 2012 MUR
15 Byron 2 1.6 58.4 06/23/2011 June 2012 MUR
16 Oconee 1 1.6 42 09/20/2011 TBD MUR
17 Oconee 2 1.6 42 09/20/2011 TBD MUR
18 Oconee 3 1.6 42 09/20/2011 TBD MUR
  Total MWt   4361.6      
  Total MWe   1453      
Page Last Reviewed/Updated Tuesday, December 27, 2011