Home > Nuclear Reactors > Operating Reactors > Licensing > Power Uprates > Status of Power Uprate Applications > Pending Applications
Pending Applications for Power Uprates
The following power uprates are currently under review by the NRC. The licensees for the following plants have not been
authorized by the NRC to operate the plants at power levels that reflect the following increases.
(TYPE -- S = Stretch; E = Extended; MUR= Measurement Uncertainty Recapture)
(TBD = To Be Determined)
| NO. |
PLANT |
% UPRATE |
MWt |
SUBMITTAL DATE |
PROJECTED COMPLETION DATE |
TYPE |
| 1 |
Browns Ferry 2 |
15 |
494 |
06/25/2004 |
To Be Determined |
E |
| 2 |
Browns Ferry 3 |
15 |
494 |
06/25/2004 |
To Be Determined |
E |
| 3 |
Browns Ferry 1 |
15 |
494 |
06/28/2004 |
Summer 2009 |
E |
| 4 |
Calvert Cliffs 1 |
1.4 |
37 |
08/29/2008 |
August 2009 |
MUR |
| 5 |
Calvert Cliffs 2 |
1.4 |
37 |
08/29/2008 |
August 2009 |
MUR |
| 6 |
Monticello |
12.9 |
229 |
11/05/2008 |
December 2009 |
E |
| |
Total MWt |
|
1785
|
|
|
|
| |
Total MWe |
|
595 |
|
|
|
|