10 CFR 50 Appendix B Notices of Nonconformance (NON) and Violation (NOV) - XII. Control of Measuring and Test Equipment

The following table lists, in chronological order, the Quality Assurance (QA) Inspection for New Reactor Licensing reports and Vendor QA Inspection reports with a Criterion XII NON/NOV.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
03/14/19

HydroAire Service, Inc., Chicago, IL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs as they pertain to activities conducted at your facility related to the design, fabrication, assembly, and testing activities of components for NRC regulated facilities.

07/02/18

Target Rock, Farmingdale, NY, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs as they pertain to activities conducted at your facility related to the design, fabrication, and testing of the ECCS values for the NuScale reactor design.

11/16/17

Valcor Engineering Corporation, Springfield Township, NJ, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at their facility related to the design, fabrication, and testing of valves and replacement valve parts for NRC's regulated facilities.

11/29/16

General Atomics Electromagnetic Systems (GA-EMS), San Diego, CA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically, as it pertains to GA-EMS's design and manufacturing of radiation monitoring systems supplied for the U.S. AP1000 reactor design and to operating nuclear power plants.

07/16/15 Thermo Fisher Scientific, San Diego, CA, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain associated with safety-related components supplied to operating nuclear power plants.
12/04/14 Westinghouse Electric Company, Fuel Handling Equipment and Crane Manufacturing (FHE&CM), Shoreview and Hutchinson, MN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs
11/21/14 Southwest Research Institute, San Antonio, TX, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as they pertain to testing and analysis of nuclear safety related components.
05/15/14 Steris Isomedix Services, Whippany, New Jersey, limited scope inspection to assess Steris Isomedixs' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as it pertains to their irradiation services associated with the qualification of nuclear safety related components
04/22/13 Dresser Masoneilan facility in Avon, Massachusetts, limited scope inspection to assess Dresser Masoneilan's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to quality assurance activities associated with the design, fabrication, assembly, and testing of safety-related valves and valve parts for U.S. nuclear power plants.
01/17/13 ABB, Inc., Florence, South Caroline, limited scope inspection to assess ABB Inc.'s compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.
11/02/12 Enertech, Utah State University, Brea, CA, routine limited-scope inspection to assess Enertech's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.
05/10/12 Clark Dynamics, LLC facility (hereafter referred to as Clark), Jefferson Hills, PA, technically-focused, limited scope inspection of Clark's quality assurance (QA) program and 10 CFR Part 21 program, specifically associated with the vibrational aging and seismic qualification of worm gear actuators and electrical penetrations associated with inspections, tests, analyses, and acceptance criteria (ITAAC) 2.2.01.05.ii, 2.2.02.05a.ii, 2.2.05.05a.ii, 2.3.02.05.ii, 2.3.07.05.ii, and 2.7.01.05.ii from Revision 19 of the Westinghouse AP1000 pressurized-water reactor certified design.
01/06/12 Shaw Modular Solutions, Lake Charles, LA, follow-up inspection of selected portions of SMS's quality assurance (QA) program and 10 CFR Part 21 program
09/29/10

Mangiarotti S.p.A., Sedegliano (UD), Italy, inspection of selected portions of Mangiarotti's quality assurance (QA) program and 10 CFR Part 21 program

12/23/09

Namco Controls Corporation, Elizabethtown, NC, follow-up inspection of selected portions of Namco's quality assurance (QA) program and 10 CFR Part 21 program

09/16/09

Anderson Greenwood Crosby Corporation (Crosby), Wrenthman, MA, inspection of selected portions of Crosby's quality assurance (QA) program and 10 CFR Part 21 program

08/28/09

Creusot Forge, Le Creusot, France, inspection of selected portions of Creusot Forge's quality assurance (QA) program, and 10 CFR Part 21 program

06/09/09

Wyle Laboratories, Huntsville, AL, inspection of selected portions of Wyle's quality assurance (QA) program, and 10 CFR Part 21 program

10/15/08

Babcock and Wilcox (B&W) Nuclear Operations Group Mount Vernon Facility, Mount Vernon, IN, inspection of selected portions of B&W's quality assurance (QA) program, and 10 CFR Part 21 program

05/27/08

Namco Controls, Inc., Lancaster, SC, inspection of selected portions of Namco's quality assurance (QA) program, and 10 CFR Part 21 program

12/28/07

Areva NP, Inc., Cranberry Township, PA, inspection of selected portions of Areva NP's quality assurance (QA) program, and 10 CFR Part 21 program implemented at Eaton Cutler-Hammer's facility in Greenwood, South Carolina

To top of page