2009 Public Meetings for Turkey Point, Units 6 and 7 Application

The following table lists, in chronological order, the public meetings that staff of the U.S. Nuclear Regulatory Commission (NRC) conducted with representatives of Florida Power and Light Company (FPL) in 2009, in connection with the review of the combined license (COL) application for Turkey Point, Units 6 and 7. To learn about future meetings, see our Public Meeting Schedule.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
07/28/09 Meeting to Discuss Review of COL Application
04/23/09 Public Outreach
03/26/09 Public Meeting to Discuss Underground Injection Control and Site Seismic Characteristics of Turkey Point Site for the Proposed AP1000 Pressurized Water Reactor (PWR) Units 6 and 7