Advanced Safety Evaluations for Virgil C. Summer Nuclear Station, Units 2 and 3 Application
The following table provides access to Advanced Safety Evaluations that the NRC has issued in connection with its review of the COL application that SCE&G submitted for Virgil C. Summer Nuclear Station, Units 2 & 3.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Chapter | Description | Date |
|---|---|---|
| 1 | Introduction and Interfaces | 12/10/10 |
| 2 | Site Characteristics (All sections except 2.4, "Hydrologic Engineering") | 07/06/10 |
| Site Characteristics - 2.4 Hydrologic Engineering | 09/24/10 | |
| 3 | Design of Structures, Components, Equipment, and Systems | 11/19/10 |
| 4 | Reactor | 07/07/10 |
| 5 | Reactor Coolant System and Connected Systems | 11/18/10 |
| 6 | Engineered Safety Features | 11/18/10 |
| 7 | Instrumentation and Controls | 09/13/10 |
| 8 | Electric Power | 11/09/10 |
| 9 | Auxiliary Systems | 11/03/10 |
| 10 | Steam and Power Conversion | 09/27/10 |
| 11 | Radioactive Waste Management | 09/02/10 |
| 12 | Radiation Protection | 09/02/10 |
| 13 | Conduct of Operations (All sections except 13.3, "Emergency Planning") | 12/10/10 |
| Conduct of Operations - 13.3 Emergency Planning | 11/19/10 | |
| 14 | Initial Test Program | 11/19/10 |
| 15 | Accident Analysis | 11/18/10 |
| 16 | Technical Specifications | 09/07/10 |
| 17 | Quality Assurance | 09/14/10 |
| 18 | Human Factors Engineering | 11/04/10 |
| 19 | Probabilistic Risk Assessment (PRA) (All sections except Appendix 19A, "Loss of Large Areas of the Plant due to Explosions or Fires (LOLA)") | 11/04/10 |
| Appendix 19A - Loss of Large Areas of the Plant Due to Explosions or Fires (LOLA ) | 12/10/10 | |
| Appendix A | License Conditions, Inspections, Tests, Analyses, and Acceptance Criteria, and Final Safety Analysis Report Commitment | 12/10/10 |