Combined License Application Documents for Virgil C. Summer Nuclear Station, Units 2 and 3 Application
The U.S. Nuclear Regulatory Commission (NRC) considers public involvement in, and information about, our activities to be a cornerstone of strong, fair regulation of the nuclear industry. As such, the NRC believes that nuclear regulation should be transacted as openly and candidly as possible to maintain and enhance the public's confidence. Ensuring appropriate openness explicitly recognizes that the public must be informed about, and have a reasonable opportunity to participate meaningfully in, the NRC's regulatory processes. Toward that end, this page provides access to documents and correspondence related to the application that South Carolina Electric & Gas (SCE&G) submitted to obtain a combined license (COL) for two Westinghouse Advanced Passive 1000 (AP1000) pressurized-water reactors (PWRs) designated as Virgil C. Summer Nuclear Station, Units 2 & 3:
On this page:
- Reference Documents
- Application
- Applicant Documents
- NRC Documents
- Safety Evaluations
- Topical Reports
- Combined Licenses (COLs)
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Reference Documents
In accordance with Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52), "Licenses, Certifications, and Approvals for Nuclear Power Plants," a COL application may reference a standard design certification, an early site permit, both, or neither. Many COL applications have referenced an application for design certification, in accordance with 10 CFR 52.55(c). On that basis, SCE&G referenced Westinghouse's application to amend the AP1000 standard design certification and cited the following amended design control document (DCD) in its COL original application for Virgil C. Summer Nuclear Station, Units 2 & 3:
- AP1000 DCD - Westinghouse Revision 16
In Revision 1 to the Summer Nuclear Station Unit 2 and 3 COL application dated July 30, 2009, SCE&G updated the application to reflect that its application now incorporates by reference AP1000 DCD Revision 17.
In Revision 4 to the Summer Nuclear Station Unit 2 and 3 COL application dated February 7, 2011, SCE&G updated the application to reflect that its application now incorporates by reference AP1000 DCD Revision 18.
In Revision 5 to the Summer Nuclear Station Unit 2 and 3 COL application dated June 28, 2011, SCE&G updated the application to reflect that its application now incorporates by reference AP1000 DCD Revision 19.
Application
The following table provides access to the COL Application that SCE&G submitted for Virgil C. Summer Nuclear Station, Units 2 & 3.
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
| Part | Description | Revision |
|---|---|---|
| 0 | Cover Letter, Affidavits |
Rev. 5* Rev. 4** Rev. 3*** Rev. 2**** Rev. 1 Rev. 0 |
| 1 | Administrative and Financial Information |
Rev. 5 Rev. 4 Rev. 3 Rev. 2 Rev. 1 Rev. 0 |
| 2 | Final Safety Analysis Report (FSAR) |
Rev. 5 Rev. 4 Rev. 3 Rev. 2 Rev. 1 Rev. 0 |
| 3 | Environmental Report |
Rev. 2 Rev. 1 Rev. 0 |
| 4 | Technical Specifications |
Rev. 4 Rev. 3 Rev. 2 Rev. 1 Rev. 0 |
| 5 | Emergency Plan |
Rev. 4 Rev. 3 Rev. 2 Rev. 1 Rev. 0 |
| 6 | Limited Work Authorization (LWA) [Not used. Reserved for applicants requesting Limited Work Authorization.] | |
| 7 | Departures and Exemption Requests |
Rev. 4 Rev. 3 Rev. 2 Rev. 1 Rev. 0 |
| 8 | Safeguards/Security Plans [This Part contains safeguards information which is withheld from public availability] | |
| 9 | [This Part contains other information which is withheld from public availability] | |
| 10 | License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC) |
Rev. 5 Rev. 4 Rev. 3 Rev. 2 Rev. 1 Rev. 0 |
| 11 | COLA Enclosure 1 - Subsurface Investigative Reports | Rev. 0 |
| 12 | COLA Enclosure 2 - Seismic Technical Advisory Review Letter | Rev. 0 |
| 13 | COLA Enclosure 3 - Quality Assurance Program Description |
Rev. 2 Rev. 1 Rev. 0 |
| 14 | Mitigative Strategies Description and Plans [This Part contains other information which is withheld from public availability] | |
| 15 | Cyber Security Plan [This Part contains other information which is withheld from public availability] | |
| 16 | Special Nuclear Material (SNM) Material Control and Accounting Program Description | Rev. 0 |
| 17 | New Fuel Shipping Plan | Rev. 0 |
| 18 | Supplemental Information in Support of 10 CFR Part 70 Special Nuclear Material License Application | Rev. 0 |
* A "roadmap" providing a discussion of the Revision 5 changes to the application was provided in a SCE&G letter dated June 28, 2011.
** A "roadmap" providing a discussion of the Revision 4 changes to the application was provided in a SCE&G letter dated February 7, 2011.
*** A "roadmap" providing a discussion of the Revision 3 changes to the application was provided in a SCE&G letter dated August 26, 2010.
**** A "roadmap" providing a discussion of the Revision 2 changes to the application was provided in a SCE&G letter dated January 28, 2010. Revision 2 of the environmental report was submitted under a separate cover letter dated July 2, 2010.
Applicant Documents
This section lists, in chronological order, the years in which SCE&G submitted documents to support the U.S. Nuclear Regulatory Commission (NRC) staff's review of SCE&G's application to obtain a combined license (COL) for Virgil C. Summer Nuclear Station, Units 2 & 3. You may click on a year in the list below to see a listing of the documents that were submitted in that year.
NRC Documents
This section lists, in chronological order, the years in which the staff of the U.S. Nuclear Regulatory Commission (NRC) sent documents to SCE&G in association with SCE&G's application to obtain a combined license (COL) for Virgil C. Summer Nuclear Station, Units 2 & 3. You may click on a year in the list below to see a listing of the documents that were sent in that year.
2000s: 2011 | 2010 | 2009 | 2008
Safety Evaluations
This section lists the Safety Evaluations that the NRC has issued in connection with its review of the COL application that SCE&G submitted for Virgil C. Summer Nuclear Station, Units 2 & 3.
Topical Reports
This section lists the Topical Reports that the NRC has issued in connection with its review of the COL application that SCE&G submitted for Virgil C. Summer Nuclear Station, Units 2 & 3.
Combined Licenses (COLs)
This section lists the COLs for the Virgil C. Summer Nuclear Station, Units 2 & 3 were issued on March 30, 2012.