United States Nuclear Regulatory Commission - Protecting People and the Environment

Safety Evaluations with No Open Items for Fermi, Unit 3 Application

The following table provides access to Safety Evaluations with No Open Items that the NRC has issued in connection with its review of the COL application that Detroit Edison Company submitted for Fermi, Unit 3.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and General Description of Plant TBD
2 Site Characteristics 07/20/12
3 Design of Structures, Components, Equipment, and Systems 07/20/12
4 Reactor 04/25/11
5 Reactor Coolant System and Connected Systems 09/07/11
6 Engineered Safety Features 08/17/11
7 Instrumentation and Controls Systems 04/25/11
8 Electric Power 04/25/11
9 Auxiliary Systems 10/31/11
10 Steam and Power Conversion System 04/26/12
11 Radioactive Waste Management 10/31/11
12 Radiation Protection 10/31/11
13 Conduct of Operations 11/01/11
14 Initial Test Program 06/28/12
15 Accident and Analysis 04/25/11
16 Technical Specifications 08/15/11
17 Quality Assurance 09/22/11
18 Human Factors Engineering 04/25/11
19 Response to Severe Accident Policy Statement 09/21/11
Page Last Reviewed/Updated Tuesday, April 16, 2013