Final Safety Evaluations for Fermi, Unit 3 Application

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that Detroit Edison Company submitted for Fermi, Unit 3.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
  Table of Contents 11/18/14
  List of Abbreviations 11/18/14
  Abstract of the Final Safety Evaluation Report 11/18/14
1 Introduction and General Description of Plant 11/18/14
2 Site Characteristics 11/18/14
3 Design of Structures, Components, Equipment, and Systems 11/18/14
4 Reactor 11/18/14
5 Reactor Coolant System and Connected Systems 11/18/14
6 Engineered Safety Features 11/18/14
7 Instrumentation and Controls Systems 11/18/14
8 Electric Power 11/18/14
9 Auxiliary Systems 11/18/14
10 Steam and Power Conversion System 11/18/14
11 Radioactive Waste Management 11/18/14
12 Radiation Protection 11/18/14
13 Conduct of Operations 11/18/14
14 Initial Test Program 11/18/14
15 Accident Analysis 11/18/14
16 Technical Specifications 11/18/14
17 Quality Assurance 11/18/14
18 Human Factors Engineering 11/18/14
19 Probabilistic Risk Assessment 11/18/14
20 Fukushima Near-Term Task Force Recommendations 11/18/14
App A Post Combined License - Activities - License Conditions, Inspections, Test, Analyses and Acceptance Criteria, and Final Safety Analysis Report Commitments 11/18/14
App B Chronology of Combined License Application 11/18/14
App C Electronic Request for Additional Information 11/18/14
App D References 11/18/14
App E Principal Contributors 11/18/14
App F Report by Advisory Committee on Reactor Safeguards 11/18/14