Safety Evaluations with Open Items for Comanche Peak Nuclear Power Plant, Units 3 and 4 Application

The following table provides access to Safety Evaluations with Open Items that the NRC has issued in connection with its review of the COL application that Luminant submitted for Comanche Peak Nuclear Power Plant, Units 3 & 4.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and General Description of Plant TBD
2 Site Characteristics TBD
3 Design of Structures, Components, Equipment, and Systems TBD
4 Reactor TBD
5 Reactor Coolant Connecting Systems 04/28/11
6 Engineered Safety Features TBD
7 Instrumentation and Controls Systems TBD
8 Electric Power 07/05/11
9 Auxiliary Systems TBD
10 Steam and Power Conversion Systems 07/21/11
11 Radioactive Waste Management 09/20/11
12 Radiation Protection 09/28/11
13 Conduct of Operations 12/06/11
14 Initial Test Program TBD
15 Accident and Analysis TBD
16 Technical Specifications TBD
17 Quality Assurance TBD
18 Human Factors Engineering TBD
19 Probabilistic Risk Assessment and Severe Accident Evaluation TBD
Page Last Reviewed/Updated Thursday, March 29, 2012