2013 NRC Documents for Comanche Peak Nuclear Power Plant, Units 3 and 4 Application

The following table provides access to documents and correspondence that the NRC has issued in 2013 in connection with its review of the COL application that Luminant submitted for Comanche Peak Nuclear Power Plant, Units 3 & 4.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
08/01/13 Notification of the Availability of the Combined License Application for Comanche Peak Nuclear Power Plant, Units 3 and 4, 10 CFR 50.43
08/01/13 Notification of the Availability of the Combined License Application for Comanche Peak Nuclear Power Plant, Units 3 and 4, 10 CFR 50.43
06/27/13 Applicability of Title 10 of the Code of Federal Regulations, Part 50, Appendix A, Criterion 5, General Design Criteria, to the Offsite Power System
05/08/13 Exemption from the Requirements of Title 10 of the Code of Federal Regulations 50.71(e)(3)(iii)