New Reactors
Standard Review Plan (NUREG-0800)
Combined License (COL) Application Guidance
COL Applications
Design Certifications Licensing Reviews
Early Site Permits Licensing Reviews
Licensing Process
Rulemaking
Oversight
Quality Assurance for Nuclear Power Plants
Public Involvement
Related Documents and Other Resources

New Reactors Oversight

A new construction inspection program (CIP) is being developed for plants licensed in accordance with the requirements of 10 CFR Part 52. The introduction of "inspections, tests, analyses, and acceptance criteria" (ITAAC) into the Part 52 licensing process creates a design specific pre-approved set of performance standards that the licensee must meet and that the Commission must find have been met, before the licensee can load fuel and operate the plant.

As a result, a major focus of the CIP is on the licensee work being performed to support the completion of the ITAAC. However, additional inspections of quality assurance verification activities and operational programs will also be needed to provide assurance that these activities and programs are in compliance with applicable Nuclear Regulatory Commission (NRC) requirements. The CIP is being developed to address the specific needs associated with verifying the successful completion of the ITAAC as well as to incorporate lessons learned from previous NRC construction inspections.

Additional background documents of interest for revision of the CIP include the following:

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.

Inspection Manual Chapters

  • IMC 0614, "Documenting 10 CFR 52 Construction Audit Activities"
  • IMC 2501, "Early Site Permit (ESP)"
  • IMC 2502, "Pre-Combined License (Pre-COL) Phase"
  • IMC 2503, "Inspections of Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)"
  • IMC 2504, "Non-ITAAC Inspections"
  • IMC 2507, "Vendor Inspections"
  • IMC 2508, "Design Certification"

(To top of page)

Commission Papers (SECY)

SECY

Title

SRM

07-0049

Construction Inspection Roles And Responsibilities

 

07-0047

Staff Approach To Verifying The Closure Of Inspections, Tests, Analyses, And Acceptance Criteria (ITAAC) Through A Sample Based Inspection Program

07-0047

06-0220

Final Rule to Update 10 CFR Part 52

 

06-0114

Description Of The Construction Inspection Program For Plants Licensed Under 10 CFR Part 52

 

06-0041

Proposed Strategy to Support Implementation of New Reactor Construction Inspection Program

06-0041

05-0197

Review Of Operational Programs In A Combined License Application And Generic Emergency Planning Inspections, Tests, Analyses, and Acceptance Criteria

05-0197

04-0032

Programmatic Information Needed For Approval Of A Combined License Without Inspections, Tests, Analyses, and Acceptance Criteria

04-0032

02-0067

Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) For Operational Programs (Programmatic ITAAC)

02-0067

(To top of page)

Public Meetings

Date Description
12/18/07

Meeting to discuss the Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) closure letters and assessment and enforcement of postulated construction inspection findings

11/28/07

Meeting to discuss the Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) closure letters and assessment and enforcement of postulated construction inspection findings

10/18/07

Meeting to discuss the Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) closure letters and assessment and enforcement of postulated construction inspection findings

08/30/07, 08/31/07

Meeting to discuss the NRC monitoring of licensee performance, assessment of the results of NRC inspection activities, the Inspection Test Analysis and Acceptance Criteria (ITAAC) prioritization process and the ITAAC closure documentation requirements

01/25/07

Meeting with the Nuclear Energy Institute and Industry Stakeholders to Discuss Aspects of the Construction Inspection Program Related to the Nrc Monitoring and Assessment of Licensee Performance

01/23/07

Meeting with the Nuclear Energy Institute to Discuss Inspection Manual Chapters (IMC) 2503 And 2504 of the Construction Inspection Program

05/04/05

Meeting with the Nuclear Industry and the Public to Discuss Categorization of Inspection Findings Related to ITAAC

04/26/04

Meeting with NEI to Discuss CIP Information Management System (CIPIMS)

04/01/04

Meeting with NEI to Discuss CIPIMS Sample Schedules

02/13/04

Meeting with NEI to Discuss CIPIMS

01/29/04

Meeting with NEI to Discuss CIP and 10 CFR Part 52 Combined License Issues

01/15/04

Senior Management Meeting with NEI to Discuss CIP and 10 CFR Part 52 Combined License Issues

11/20/03

Meeting with NEI to Discuss CIP and 10 CFR Part 52 Combined License Issues

09/16/03

Meeting with Westinghouse to Discuss Construction Scheduling

08/27/03

Workshop to Discuss the Draft 10 CFR Part 52 CIP Framework Document

02/20/03

Meeting with NEI to Discuss the CIP and 10 CFR Part 52 COL

12/16/02

Meeting with Westinghouse to Discuss the Construction Schedule for New Reactors

08/22/02

Meeting with Bechtel to Discuss Construction Scheduling Software

08/20/02

Meeting with Westinghouse Electric Company to Discuss Construction Scheduling Software

(To top of page)

Also see ITAAC discussion under New Reactors Licensing Process.