South Texas Project, Units 3 and 4 Application

Project Overview

South Texas Project
Who:   STP Nuclear Operating Company (STPNOC)

What:   Application for a combined license (COL) for two Advanced Boiling Water Reactors (ABWRs), the proposed South Texas Project Units 3 & 4

When:   September 20, 2007 (date of application submittal)

Where:   STPNOC's South Texas Project sites near Bay City in Matagorda County, Texas

On this page:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

STP 3 & 4 COLA

  • Part 1 – General and Financial Information
  • Part 2 – Final Safety Analysis Report (FSAR)
  • Part 3 – Environmental Report
  • Part 4 – Technical Specifications
  • Part 5 – Emergency Plan
  • Part 6 – not used (place holder for Site Redress Plan if needed at later date)
  • Part 7 – Summary of exemptions to and departures from the ABWR DCD
  • Part 8 – [This Part contains safeguards information which is withheld from public availability]
  • Part 9 – Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Acceptance Review
Federal Register Notice (FRN) published for receipt and availability
10/24/07 - A
FRN published announcing acceptance
12/05/07 - A
FRN published for mandatory hearing
To Be Determined**
Safety Review
Phase 1 – Preliminary Safety Evaluation Report (SER) with Requests for Additional Information (RAIs) issued to applicant
To Be Determined*
Phase 2 – SER with Open Items issued
 
Phase 3 – Response to ACRS regarding SER with Open Items issued
 
Phase 4 – Advanced SER with no Open Items issued
 
Phase 5 – Response to ACRS regarding SER with no Open Items issued
 
Phase 6 – Final SER issued as NUREG
 
Environmental Review
Phase 1 – Acceptance Review
12/05/07 - A
Phase 2 – Scoping
To Be Determined*
Phase 3 – Draft EIS
 
Phase 4 – Final EIS
 
Phase 5 – Hearing
 
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

* The NRC will establish a schedule after STPNOC resolves vendor support issues and makes any COL revisions necessary to allow a staff review of the application in full. See the January 30, 2008 letter below for additional details.

** The original hearing notice has been withdrawn and will be republished at a future date to be determined. See the February 13, 2008 letter below for additional details.

To top of page

NRC Documents

To top of page

Requests for Additional Information

Requests for Additional Information Applicant Response
RAI Letter 01 Response
RAI Letter 02 Response
RAI Letter 03 Response
RAI Letter 04 Response
RAI Letter 05  
RAI Letter 06  
RAI Letter 07  
RAI Letter 08  
RAI Letter 09  
RAI Letter 10  
RAI Letter 11  
RAI Letter 12  
RAI Letter 13  
RAI Letter 14  
RAI Letter 15  
RAI Letter 16  
RAI Letter 17  
RAI Letter 18  
RAI Letter 19  
RAI Letter 20  
RAI Letter 21  
RAI Letter 22  
RAI Letter 23  
RAI Letter 24  
RAI Letter 25  
RAI Letter 26  
RAI Letter 27  

To top of page

Public Meetings

Date Description
02/05/08 Public Scoping Meeting
06/23/07 Public Outreach

To top of page

Contacts

Contacts for South Texas Project COL Application
Site Safety Project Manager George Wunder
Environmental Project Manager Paul Kallan
Cristina Guerrero
Contact a Public Affairs Officer

To top of page



Privacy Policy | Site Disclaimer
Tuesday, May 13, 2008