Calvert Cliffs, Unit 3 Application

Project Overview

Calvert Cliffs
Who:   UniStar Nuclear and Constellation

What:   Application for a combined license (COL) for an AREVA U.S. Evolutionary Power Reactor (EPR), the proposed Calvert Cliffs Nuclear Power Plant Unit 3

When:   July 13, 2007 (date of initial application of Part 1 which included the Environmental Report)

Where:   Unistar's Calvert Cliffs site near Lusby in Calvert County, Maryland

On this page:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

UniStar transmittal letter for Calvert Cliffs Unit 3 COLA, Part II ( March 14, 2008)

  • Part 1 – General and Administrative Information
  • Part 2 – Final Safety Analysis Report (FSAR)
  • Part 3 – Environmental Report
  • Part 4 – Technical Specifications
  • Part 5 – Emergency Plan
  • Part 6 – Limited Work Authorization (LWA) [Part not used in this application]
  • Part 7 – DCD Departures
  • Part 8 – Security Plan [This Part contains safeguards information which is withheld from public availability]
  • Part 9 – Proprietary and Sensitive Unclassified Non-Safeguards Information [This Part contains information which is withheld from public availability.]
  • Part 10 – Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) and ITAAC Closure
  • Part 11A – Quality Assurance Program Description
  • Part 11B – AREVA Design Control Document
  • Part 11C – DCD Supplements
  • Part 11D – NEI Reference Documents [This Part contains information which is withheld from public availability.]
  • Part 11E – Process Control Program
  • Part 11F – Offsite Dose Calculation Manual
  • Part 11G – Fuel Racks Report
  • Part 11H – State and Local Emergency Plans [This Part contains information which is withheld from public availability.]

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Acceptance Review
Federal Register Notice (FRN) published for receipt and availability
08/15/07 - A
FRN published announcing acceptance
01/31/08 - A
FRN published for mandatory hearing
TBD, Note 1
Safety Review
Phase 1 – Preliminary Safety Evaluation Report (SER) with Requests for Additional Information (RAIs) issued to applicant
 
Phase 2 – SER with Open Items issued
 
Phase 3 – Response to ACRS regarding SER with Open Items issued
 
Phase 4 – Advanced SER with no Open Items issued
 
Phase 5 – Response to ACRS regarding SER with no Open Items issued
 
Phase 6 – Final SER issued as NUREG
 
Environmental Review
Phase 1 – Environmental impact statement (EIS) summary report issued
09/05/08 - T
Phase 2 – Draft EIS issued to EPA
02/09/09 - T
Phase 3 – Response to public comments on draft EIS issued
11/10/09 - T
Phase 4 – Final EIS issued to EPA
03/01/10 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Note 1: TBD pending completion of acceptance review of Part 2 of the application which was submitted on March 17, 2008.

To top of page

NRC Documents

To top of page

Public Meetings

Date Description
03/19/08 Public Environmental Scoping Meeting
08/14/07 Public Outreach

To top of page

Contacts

Contacts for Calvert Cliffs COL Application
Site Safety Project Manager John Rycyna
Environmental Project Manager Thomas Fredrichs
Contact a Public Affairs Officer