The following table lists, in chronological order, the meetings that staff of the U.S. Nuclear Regulatory Commission (NRC) conducted with representatives of NuScale Power, LLC, in connection with the pre-application activities associated with the NuScale small modular reactor (SMR) design. To learn about future public meetings, see our Public Meeting Schedule.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
12/06/12 NuScale Non-Public Meeting on Fuel Design Methodology
12/04/12 NuScale Non-Public Meeting on Probabilistic Risk Assessment Status
12/04/12 NuScale Non-Public Meeting on Class 1E Power Systems
12/03/12 NuScale Non-Public Meeting on Regulatory Gap Analysis: Regulations Requiring Further Consideration
10/04/12 NuScale Non-Public Meeting on Modular Equipment Handling
10/04/12 NuScale Non-Public Meeting on Security by Design
10/03/12 NuScale Non-Public Meeting on Mechanistic Source Term
07/19/12 Public Meeting with NuScale Regarding their Risk Informed Design Approach
07/18/12 Public Meeting with the Nuclear Regulatory Commission Staff and NuScale Power, LLC, to Discuss the NuScale Program for Inspections, Tests, Analyses, and Acceptance Criteria
05/10/12 NuScale Non-Public Meeting on Seismic Design Methodology
05/09/12 NuScale Non-Public Meeting on Fuel Solutions
05/09/12 NuScale Non-Public Meeting on Regulatory Gap Analysis
04/19/12 NuScale Non-Public Meeting on Instrumentation and Controls Preliminary Design and Methodology
02/29/12 - 03/01//12 NuScale Power, LLC, Public Meeting on NuScale Plant Testing, Dynamical System Scaling, and LOCA PIRT Methods