2012 Meetings for the B&W mPower™ Design
The following table lists, in chronological order, the meetings that staff of the U.S. Nuclear Regulatory Commission (NRC) conducted with representatives of Babcock & Wilcox (B&W) mPower, Inc., in connection with the pre-application activities associated with the mPower™ reactor design. To learn about future public meetings, see our Public Meeting Schedule.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Description |
|---|---|
| 12/13/12 |
mPower Non-Public Meeting on Security Staffing Strategy
|
| 11/27/12 |
mPower Non-Public Meeting on Nuclear Island System Design Update, Valve Design Discussion and Generic Safety Issue-191
|
| 09/20/12 | mPower Non-Public Meeting on ATWS Rule, Staff Feedback on Source Term Paper and Accident Analysis Technical Report |
| 07/26/12 |
mPower Non-Public Meeting on Core Thermal Hydraulics and Vessel Riser Design Basis
|
| 06/21/12 | mPower Public Meeting on Gale Code for Small Modular Reactors, mPower Design Specific Review Standard (DSRS) for Chapter 7 and Non-Public Meeting on Human Factors Engineering Program Development |
| 05/17/12 |
mPower Non-Public Meeting on Seismic and Soil Interaction Analysis
|
| 05/16/12 |
mPower Non-Public Meeting on Instrumentation and Controls Architecture
|
| 04/26/12 | mPower Non-Public Meeting on Core Nuclear Design Codes and Methods Qualification |
| 03/22/12 |
mPower Non-Public Meeting on Reactor Design Overview Workshop
|
| 03/21/12 |
mPower Non-Public Meeting on Site Layout and Building Details, Electrical Overview, and Selected BOP Systems
|
| 02/16/12 |
mPower Non-Public Meeting on Core and Fuel Design Update
|
| 02/01/12 | mPower Non-Public Meeting on the Status of the Integrated System Test Facility, and Overviews of the Electrical and Balance-of-Plant Designs |
| 01/31/12 | mPower Non-Public Meeting on the Instrumentation and Controls Software Development Plan, and Public Meeting on NRC Staff Presentation on Plans for Changes to mPower DSRS Chapter 7, Instrumentation and Controls |
Page Last Reviewed/Updated Friday, April 12, 2013

