United States Nuclear Regulatory Commission - Protecting People and the Environment

2010 Meetings for the B&W mPower™ Design

The following table lists, in chronological order, the meetings that staff of the U.S. Nuclear Regulatory Commission (NRC) conducted with representatives of Babcock & Wilcox (B&W) mPower, Inc., in connection with the pre-application activities associated with the mPower™ reactor design. To learn about future public meetings, see our Public Meeting Schedule.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
12/20/10 mPower Non-Public Meeting on Security Conceptual Design
12/14/10 TVA Public Meeting on Assumption Letter for Clinch River Site
11/03/10 mPower Non-Public Meeting on Design Overview and Instrumentation & Controls Architecture
09/23/10 mPower Non-Public Meeting on Integral Systems Testing
07/29/10 mPower Non-Public Meeting on Design Evolution and Core Fuel Design
03/31/10 mPower Public Meeting on Design Overview, Safety Approach, and IST Update
Page Last Reviewed/Updated Monday, August 12, 2013