2010 Meetings for the B&W mPower™ Design
The following table lists, in chronological order, the meetings that staff of the U.S. Nuclear Regulatory Commission (NRC) conducted with representatives of Babcock & Wilcox (B&W) mPower, Inc., in connection with the pre-application activities associated with the mPower™ reactor design. To learn about future public meetings, see our Public Meeting Schedule.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Description |
|---|---|
| 12/20/10 | mPower Non-Public Meeting on Security Conceptual Design |
| 12/14/10 | TVA Public Meeting on Assumption Letter for Clinch River Site |
| 11/03/10 |
mPower Non-Public Meeting on Design Overview and Instrumentation & Controls Architecture
|
| 09/23/10 | mPower Non-Public Meeting on Integral Systems Testing |
| 07/29/10 | mPower Non-Public Meeting on Design Evolution and Core Fuel Design |
| 03/31/10 | mPower Public Meeting on Design Overview, Safety Approach, and IST Update |
Page Last Reviewed/Updated Friday, April 12, 2013

