Key Correspondence for Watts Bar Unit 2 Reactivation
The following is a list of correspondence on the Possible Completion of Construction Activities.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
| Date | Originator | Description |
|---|---|---|
| 01/31/2013 | TVA | Construction Deficiency Report 50-391/2013-01 -Commercial Grade Dedication Program - Interim Report. |
| 01/29/2013 | TVA | Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding , Required Response 1, Integrated Assessment Approach. |
| 01/24/2013 | TVA | Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report Open Item 25. |
| 01/24/2013 | TVA | Supplemental Safety Evaluation Report Appendix HH Item 50, Anchor Bolt Documentation and Pull Tests - Revision. |
| 01/24/2013 | TVA | Waste Confidence Rulemaking and Environmental Impact Statement. |
| 01/17/2013 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 9, and Status of Generic Communications for Unit 2 - Revision 9. |
| 12/10/2012 | TVA | Instrumentation and Controls Staff Request for Additional Information Related to Supplemental Safety Evaluation Report Open Item 80. |
| 12/05/2012 | TVA | Watts Bar Nuclear Plant, Unit 2, Request for Additional Information Regarding Supplemental Condenser Cooling Water Velocity. |
| 11/29/2012 | NRC | Status Of 60-Day Response To Orders Modifying Licenses Regarding Recommendations 4.2, 5.1, And 7.1 Of The Near-Term Task Force Related To The Fukushima Dai-ichi Nuclear Power Plant Accident. |
| 11/01/2012 | TVA | Supplemental Safety Evaluation Report Open Item 70 Regarding the Preservice Inspection Program Plan. |
| 10/31/2012 | TVA | Draft Two-Unit Offsite Dose Calculation Manual. |
| 10/29/2012 | TVA | Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049). |
| 10/29/2012 | TVA | Initial Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Fuel Pool Instrumentation (Order Number EA-12-051). |
| 10/25/2012 | TVA | 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System." |
| 10/23/2012 | NRC | Request to use ASME Code Cases N-520-4 and N-520-5 Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates. |
| 10/17/2012 | TVA | Severe Accident Management Alternative Review. |
| 10/16/2012 | TVA | 10 CFR 50.46 Estimated Increase in Peak Clad Temperature Due to the Effect of Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown Not Being Considered - 30 Day Report. |
| 10/04/2012 | TVA | Revision of Commitment for Unit 2's Implementation of the Maintenance Rule. |
| 10/04/2012 | TVA | NRC Bulletin No. 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant System (RCS)" - Clarification. |
| 10/01/2012 | TVA | Notification of Completion of Review of Updated Hydrologic Analysis Results for Impact on Watts Bar Nuclear Plant Units 1 and 2 Final Environmental Statements. |
| 09/06/2012 | TVA | Long-Term Stability Analysis Methodology. |
| 08/30/2012 | TVA | Instrumentation and Controls Staff Request for Additional Information Related to Supplemental Safety Evaluation Report Open Item 80. |
| 08/27/2012 | TVA | Update to Technical Specification Table 3.3.3-1 and Technical Specification Bases 3.3.3. |
| 08/23/2012 | TVA | Final Safety Analysis Report, Amendment 109. |
| 08/23/2012 | TVA | Request for Renewal of Special Nuclear Material License No. SNM-2014. |
| 08/15/2012 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 8, and Status of Generic Communications for Unit 2 - Revision 8. |
| 08/09/2012 | NRC | Order Holding Waste Confidence Contention in Abeyance. |
| 08/07/2012 | NRC | Commission Memorandum and Order (CLI-12-16) to Suspend Final Licensing Decisions for Watts Bar Nuclear Plant, to Grant the Requests in Part and Deny the Requests in Part. |
| 07/31/2012 | TVA | Evaluation for Tube Vibration-Induced Fatigue. |
| 07/30/2012 | TVA | NUREG-0847 Supplemental Safety Evaluation Report Related to the Operation of WBN Unit 2, Appendix HH Open Item 5 and 8 - Core Map. |
| 07/26/2012 | NRC | Status of 90-Day Response to Request for Information Regarding Recommendation 9.3 of Near-Team Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident. |
| 07/24/2012 | NRC | SECY-12-0103 - Sixth Report on the Status of Reactivation of Construction and Licensing for Watts Bar Nuclear Plant, Unit 2 |
| 06/27/2012 | TVA | Submittal of Non-Proprietary Information Related to Final Safety Analysis Report Chapter 15 Transient Analysis. |
| 06/18/2012 | NRC | Response to NUREG-0847, Appendix HH Open Item 41 – Emergency Response Data System and Inspection Planning and Scheduling Item. |
| 06/14/2012 | TVA | Response to NUREG-0847, Appendix HH Open Item 41 – Emergency Response Data System and Inspection Planning and Scheduling Item No. 519. |
| 06/13/2012 | TVA | Response to Request for Additional Information Regarding Final Safety Analysis Report Amendment Related to Section 3.11 – Revised Response. |
| 06/11/2012 | TVA | 90-Day Response to NRC Request of Information Pursuant to 10 CFR 50.54(f) Re: Seismic Aspects of Recommendations 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-Ichi Accident. |
| 06/11/2012 | TVA | Estimates of Entrainment of Fish Eggs and Larvae at Watts Bar Nuclear Plant at Tennessee River Mile 528 from March 2010 through March 2011. |
| 06/08/2012 | NRC | Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant. |
| 06/07/2012 | TVA | Response to NUREG-0847, Appendix HH Open Item 26 – Diesel Generator. |
| 06/07/2012 | TVA | Response to NUREG-0847, Appendix HH Open Item 30 – Power System Degraded Voltage. |
| 06/05/2012 | TVA | Submittal of Revised Section 4.3, “Fuel Storage,” Developmental Revision G of Technical Specification. |
| 05/18/2012 | NRC | Response to Corrective Actions with Task Interface Agreement for Notice of Violation. |
| 05/17/2012 | TVA | Request for Extension to Construction Permit. |
| 05/17/2012 | NRC | Task Interface Agreement on Notice of Violation. |
| 05/17/2012 | TVA | Additional Information to Generic Letter 2004-02, “Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.” |
| 05/01/2012 | NRC | NRC Staff's May 2012 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
| 04/23/2012 | TVA | Instrumentation and Controls Staff Information Requests. |
| 03/30/2012 | TVA | 30-Day Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force review of the Insights from the Fukushima Dai-Ichi Accident. |
| 03/30/2012 | TVA | Answer to Order with Regard to Reliable Spent Fuel Pool Instrumentation. |
| 03/30/2012 | TVA | Answer to Order with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. |
| 03/23/2012 | NRC | Review Schedule Delay Due to Anticipated License Amendment Request and Hydrology Issues. |
| 03/13/2012 | TVA | Fire Protection Report Revision of Commitments. |
| 03/13/2012 | NRC | Correction to Issuance of Orders and Request for Information Issued Pursuant to Title 10 of the Code of Federal Regulations Part 50.54(f). |
| 03/12/2012 | NRC | Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. |
| 03/12/2012 | NRC | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force review of the Insights from the Fukushima Dai-Ichi Accident. |
| 03/12/2012 | NRC | Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. |
| 03/12/2012 | TVA | Submittal of Previously Docketed Environmental Reports. |
| 03/09/2012 | TVA | Instrumentation and Controls Staff Information Requests. |
| 03/06/2012 | NRC | NRC Staff's March 2012 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
| 03/06/2012 | ALSB | Memorandum and Order Denying TVA’s Motion for Summary Disposition of SACE Contention 7. |
| 03/05/2012 | TVA | Final Safety Analysis Report, Amendment 108. |
| 03/02/2012 | TVA | Instrumentation and Controls Staff Information Requests. |
| 02/28/2012 | TVA | Submittal of Developmental Revision G of the Technical Specification and Technical Specification Bases. |
| 02/01/2012 | TVA | Instrumentation and Controls Staff Information Requests. |
| 02/01/2012 | FEMA | FEMA Watts Bar, Final Exercise Report, Exercise Date – October 19, 2011. |
| 01/27/2012 | TVA | Comment (5) of Brenda E. Brickhouse of Tennessee Valley Authority on the Draft Supplement 2 to Final Environmental Statement. |
| 01/24/2012 | SACE | Comment (4) of Diane Curran, on Behalf of Southern Alliance for Clean Energy, on Draft Final Environmental Statement. |
| 01/23/2012 | DOI | Comments and Recommendations on the Draft Supplemental Final Environmental Statement. |
| 01/19/2012 | CN | Letter from Chickasaw Nation on Draft Final Environmental Statement. |
| 01/19/2012 | TVA | Instrumentation and Controls Staff Information Requests. |
| 01/19/2012 | NRC | Watts Bar Nuclear Plant, Unit 2 – Request for Relief Regarding Use of American Society of Mechanical Engineers Boiler & Pressure Vessel Code Cases N-801 and N-802. |
| 01/18/2012 | NRC | Status of Operating License Application Review Regarding Fire Protection Program. |
| 01/12/2012 | TVA | Final Safety Analysis Report – Revision to Chapter 15.2.4 Inadvertent Boron Dilution. |
| 01/04/2012 | PUB | Comment (3) by Anonymous Individual Opposing Draft Supplement 2 to Final Environmental Statement. |
| 01/03/2012 | NRC | NRC Staff's January 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
| 12/28/2011 | PUB | Comment (1) of Donna Budnick on the Draft Supplement 2 to Final Environmental Statement. |
| 12/27/2011 | TVA | Notification of National Pollutant Discharge Elimination System Permit Modification. |
| 12/22/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 12/21/2011 | TDOT | Tennessee Department of Transportation Comment Letter. |
| 12/21/2011 | EPA | EPA’s Comments on the DFES. |
| 12/20/2011 | NRC | NRC Staff's Answer to TVA's Motion for Summary Disposition of Contention 7 Regarding Aquatic Impacts. |
| 12/20/2011 | SACE | Certificate of Service of Copies of the Southern Alliance for Clean Energy's Opposition to TVA's Motion for Summary Disposition of Contention 7, Statement of Disputed Material Facts, and Declaration of Shawn Paul Young, Ph.D. |
| 12/20/2011 | SACE | Declaration of Shawn Paul Young, Ph.D. on Behalf of Southern Alliance for Clean Energy |
| 12/20/2011 | SACE | Southern Alliance for Clean Energy's Statement of Disputed Material Facts. |
| 12/20/2011 | SACE | Southern Alliance for Clean Energy's Opposition to Tennessee Valley Authority's Motion for Summary Disposition of Contention 7 Regarding Aquatic Impacts of Watts Bar Unit 2. |
| 12/20/2011 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 7, and Status of Generic Communications for Unit 2 - Revision 7. |
| 12/20/2011 | FWS | Biological Assessment for Section 7 Consultation Related to the Operating License Application, Rhea County, Tennessee. |
| 12/19/2011 | DOI | Comment (2) of Joyce Stanley, on Behalf of the U.S. Department of the Interior, on Draft Supplemental Environmental Statement, NUREG-0498, Supplement 2. |
| 12/19/2011 | NRC | Extension of Comment Period on Draft Supplement to Final Environmental Statement for Operation. |
| 12/15/2011 | EPA | EPA's Comments on the "Draft Final Environmental Statement, Related to the Operation of Watts Bar Nuclear Plant, Unit 2." Supplement, NUREG-0498, July 2011. |
| 12/08/2011 | NRC | Transcripts for 12/8/2011 Draft Final Environmental Statement Public Comment Meeting. |
| 11/30/2011 | NRC | NUREG-0847, Supp. 25, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2". |
| 11/30/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 11/21/2011 | CNO | Letter from Choctaw Nation of Oklahoma on Draft Final Environmental Statement. |
| 11/21/2011 | TVA | Tennessee Valley Authority's Motion for Summary Disposition of Contention 7. |
| 11/18/2011 | NRC | Request for Additional Information Regarding Supplemental Evaluation Report Open Item 26. |
| 11/18/2011 | NRC | Request for Additional Information Regarding Supplemental Safety Evaluation Report Open Items 80, 81, 105, and 108. |
| 11/17/2011 | TVA | Final Safety Analysis Report, Amendment 107. |
| 11/15/2011 | NRC | 11/08/2011 Meeting Summary with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant Unit 2 Construction Project. |
| 11/14/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 11/07/2011 | TVA | Meteorology Data for Accident Dose Analysis. |
| 11/02/2011 | NRC | Notice of Availability of the Draft Supplement to Final Environmental Statement for Operation (TAC No. MD8203). |
| 11/01/2011 | NRC | NRC Staff's November 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
| 10/31/2011 | NRC | NUREG-0498 Supp 2, "Draft Final Environmental Statement, Related to the Operation of Watts Bar Nuclear Plant, Unit 2". |
| 10/31/2011 | TVA | Results of the Hydrology Analysis Without Use of Sand Baskets. |
| 10/24/2011 | TVA | Safety Evaluation Report Supplement 23 - Response to NRC Required Action Item 71. |
| 10/17/2011 | TVA | Revision of Commitment for Unit 2's Implementation of the Maintenance Rule. |
| 10/17/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Fuel Handling Accident Dose Analysis. |
| 10/13/2011 | TVA | Instrumentation And Controls Staff Information Requests. |
| 09/30/2011 | NRC | NUREG-0847 Supp 24 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2." |
| 09/30/2011 | TVA | Instrumentation & Controls Staff Information Requests. |
| 09/23/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Fuel Handling Accident Dose Analysis. |
| 09/21/2011 | NRC | Request for Additional Information Regarding Supplemental Safety Evaluation Report Open Item 80. |
| 09/20/2011 | NRC | Review of Individual Plant Examination of External Events Design Report. |
| 09/16/2011 | TVA | Revised Severe Accident Accident Management Design Alternative Review (SAMDA) Response. |
| 09/15/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Design Basis Dose Analysis. |
| 09/15/2011 | TVA | Final Safety Analysis Report - Revised Enclosures 3 & 5 for TVA to NRC Letter Dated December 10, 2010. |
| 09/15/2011 | TVA | Final Safety Analysis Report, Amendment 106. |
| 09/14/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 7. |
| 09/09/2011 | NRC | Anticipated License Amendment Requests. |
| 09/07/2011 | NRC | Complete List of Comments, Suggestions, and Staff Responses Condensed From the October 6, 2009, Public Scoping Meeting. |
| 09/06/2011 | NRC | NRC Staff's September 6, 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
| 09/01/2011 | TVA | Relief Request to Use American Society of Mechanical Engineers (ASME) Code Cases N 801 and N 802. |
| 09/01/2011 | TVA | Safety Evaluation Report Supplement 22 - Response to NRC Required Action Item 11. |
| 09/01/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 09/01/2011 | TVA | American Society of Mechanical Engineers Boiler and Pressure Vessel Code Transition - Revised Commitment. |
| 08/23/2011 | NRC | Closeout of Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Containment Spray System." |
| 08/22/2011 | TVA | Response to Request for Additional Information on the Determination of the 50 Mile Population Dose. |
| 08/15/2011 | TVA | Transmittal of Revised Unit 1 / Unit 2 As-Designed Fire Protection Report. |
| 08/12/2011 | NRC | Transition of Components to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI. |
| 08/12/2011 | NRC | Review of Individual Plant Examination Submittal - Internal Events and Internal Flood. |
| 08/12/2011 | TVA | Safety Evaluation Report Supplement 22 - Response to NRC Required Action Item. |
| 08/12/2011 | TVA | Final Safety Analysis Report, Amendment 105. |
| 08/10/2011 | TVA | Submittal of Complete Version of Developmental Revision of the Technical Specifications and Technical Specifications Bases. |
| 08/05/2011 | TVA | Final Safety Analysis Report - Chapter 15.5 Design Basis Accident Dose Analysis. |
| 08/04/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 08/03/2011 | TVA | Request for Additional Information Regarding Final Safety Analysis Report Amendment Related Section 3.11 - Revised Response. |
| 07/29/2011 | TVA | Response to Request for Additional Information Regarding June 28, 2011 NRC Audit- Steam Line Break and other Miscellaneous RAIs. |
| 07/28/2011 | TVA | Notification of National Pollutant Discharge Elimination System Permit Renewal and Approval. |
| 07/28/2011 | TVA | Results from Cost-Benefit Analysis of Radwaste System Enhancements. |
| 07/27/2011 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 6, and Status of Generic Communications for Unit 2 - Revision 6. |
| 07/27/2011 | TVA | Response to Chapter 12 Request for Additional Information. |
| 07/27/2011 | NRC | Request for Additional Information Regarding Incore Instrumentation System. |
| 07/21/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 6. |
| 07/20/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 15. |
| 07/20/2011 | NRC | Schedule of Licensing Activities. |
| 07/18/2011 | TVA | Response to Request for Additional Information Regarding June 28, 2011 NRC Audit. |
| 07/18/2011 | TVA | Response to NRC Bulletin 2011-01, "Mitigation Strategies". |
| 07/14/2011 | TVA | Response to Request for Additional Information Regarding Compliance with 10 CFR 50.68(b)(6). |
| 07/13/2011 | TVA | Submittal of Pre-op Test Instruction, 2-PTI-261-01, Rev. 0. |
| 07/07/2011 | NRC | Questions Raised to the NRC During the June 20 Public Meeting Regarding the Watts Bar Unit 2 Construction Project. |
| 07/05/2011 | NRC | NRC Staff's July 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. |
| 06/30/2011 | NRC | NUREG-0847 Supp 23 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2." |
| 06/29/2011 | NRC | IR 05000391-11-604, on 04/03/2011 - 05/21/2011, Watts Bar Nuclear Plant, Unit 2, Construction - NRC Integrated Inspection Report. |
| 06/29/2011 | NRC | Summary of Public Meeting with Tennessee Valley Authority on Watts Bar Nuclear Plant Unit 2 Construction Project. |
| 06/27/2011 | TVA | Response to Request for Additional Information Regarding April 27, 2011 NRC Audit. |
| 06/27/2011 | TVA | Final Safety Analysis Report - Response to Request for Additional Information Regarding Accident Dose Analysis Basis. |
| 06/27/2011 | TVA | Response to Request for Additional Information on Severe Accident Management Design Alternatives. |
| 06/24/2011 | TVA | Response to Final Safety Analysis Report, and Final Supplemental Environmental Impact Statement. |
| 06/24/2011 | TVA | Final Safety Analysis Report - Response to Chapter 11 Request for Additional Information. |
| 06/23/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 06/21/2011 | TVA | Submittal of Pre-op Test Instruction. |
| 06/21/2011 | TVA | Response to NRC Staff Comments on Developmental Revisions of the Unit 2 Technical Specifications and Technical Specification Bases; Submittal of Developmental Revision F. |
| 06/17/2011 | TVA | Transmittal of Quality Assurance Assessment Report NGDC-WB-11-007, Licensing Basis Preservation. |
| 06/17/2011 | TVA | Response To Request For Additional Information Regarding Severe Accident Management Alternative Review. |
| 06/15/2011 | NRC | Press Release-11-107: NRC Issues License to TVA Authorizing Receipt of Fresh Nuclear Fuel for Watts Bar Nuclear Plant, Unit 2. |
| 06/15/2011 | NRC | Letter to A. Bhatnagar: Issuance of Special Nuclear Materials License No. SNM-2014 for Watts Bar Nuclear Plant, Unit 2 (TAC L32918). |
| 06/13/2011 | NRC | Request for Additional Information Regarding Severe Accident Mitigation Design Alternatives Review - June 2011. |
| 06/10/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 06/10/2011 | TVA | Response to NRC Bulletin 2011-01, "Mitigating Strategies". |
| 06/10/2011 | TVA | Cyber Security Implementation Schedule Including Systems Common to WBN, Unit 1. |
| 06/09/2011 | TVA | Reply to Notice of Violation 0500039/112010603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response. |
| 06/09/2011 | TVA | Submittal of Pre-op Test Instruction. |
| 06/08/2011 | NRC | IR 05000390-11-403 & 05000391-11-403, on 05/27/11, Watts Bar Nuclear Plant. |
| 06/08/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 5. |
| 06/07/2011 | TVA | Safety Evaluation Report Supplement 22 (SSER 22) - Second Response to NRC Required Action Items. |
| 06/06/2011 | TVA | Final Safety Analysis Report - Response to Request for Additional Information Regarding Accident Dose Analysis Basis. |
| 06/03/2011 | TVA | Final Safety Analysis Report (FSAR), Amendment 104. |
| 06/02/2011 | TVA | Completion of Temporary Instruction 184, "Availability and Readiness Inspection of Severe Accident Mitigation Guidelines" at Region II Facilities - Revision. |
| 06/01/2011 | TVA | Information Presented in the May 11-12, 2011 TVA/NRC Meeting Regarding Final Safety Analysis Report Section 2.4. |
| 05/26/2011 | TVA | Response to Request for Information from Public Meeting on May 11, 2011. |
| 05/25/2011 | TVA | Response to Request for Additional Information Item Numbers 2, 3, 5 and 15 Regarding Severe Accident Management Design Alterative Review. |
| 05/24/2011 | TVA | Responses to Request for Additional Information Regarding (1) Bottom Mounted Instrument Tube Failure and (2) Mass Addition Events. |
| 05/24/2011 | TVA | Submittal of Pre-op Test Instruction, 2-PTI-065-02, Rev. 0, "Emergency Gas Treatment System Pressure Test." |
| 05/23/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 4. |
| 05/20/2011 | TVA | Response to Final Safety Analysis Report, Chapter 11 and Final Supplemental Environmental Impact Statement Request for Additional Information. |
| 05/20/2011 | TVA | Revised Response to Request for Additional Information Question 3 Regarding Final Safety Analysis Report Section 2.4. |
| 05/20/2011 | TVA | Instrumentation and Controls Staff Information Requests - Presentation Package for Public Meeting Held on May 12, 2011. |
| 05/20/2011 | TVA | Cyber-Security Program Implementation Schedule. |
| 05/19/2011 | TVA | Response to Request for Additional Information on Intake Pumping Station Water Velocity. |
| 05/13/2011 | TVA | Response To Request For Additional Information Regarding Severe Accident Management Design Alternative Review. |
| 05/13/2011 | TVA | Additional Responses to Request for Additional Information Regarding (1) Large Break Loss of Coolant Accident, (2) Steam Line Break, and (3) Miscellaneous Analysis. |
| 05/10/2011 | NRC | End of Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2011601). |
| 05/09/2011 | TVA | Response to Request for Additional Information Regarding Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3 - Revised Response for RAI 2. |
| 05/09/2011 | NRC | Multi-Unit Operator Training and Certification Program, Revision 1, Errata. |
| 05/06/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 04/29/2011 | TVA | Response to Requests for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
| 04/29/2011 | TVA | Response to Requests for Additional Information Regarding Inadvertent ECCS Actuation Analysis, and Chemical & Volume Control System Malfunction Analysis. |
| 04/29/2011 | TVA | Response to Request for Additional Information on New Fuel Receipt and Storage. |
| 04/29/2011 | TVA | Intake Pumping Station Water Velocity - Response to Request for Additional Information. |
| 04/27/2011 | NRC | Accident Analyses Audit Report Westinghouse Documents Relating to Final Safety Analysis Report Accident Analyses. |
| 04/27/2011 | NRC | Audit Report of the Common Q Post Accident Monitoring System. |
| 04/25/2011 | NRC | Request for Additional Information Regarding Generic Letter 2004-02 Round 2. |
| 04/25/2011 | NRC | Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 3. |
| 04/21/2011 | TVA | Withdrawal of A Previous Comment. |
| 04/20/2011 | TVA | Response to Request for Additional Information Regarding Final Safety Analysis Report Section 2.4. |
| 04/19/2011 | TVA | Submittal of Pre-Op Test Instruction, 2-PTI-030H-01, Rev. 0, "Lower Compartment Coolers." |
| 04/19/2011 | NRC | Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water. |
| 04/13/2011 | TVA | Response to Request For Additional Information (RAIs) Related to FSAR Sections 9.2.1 and 9.2.2. |
| 04/13/2011 | NRC | Status of Operating License Application Review and Project Schedule Implications. |
| 04/11/2011 | NRC | Multi-Unit Operator Training and Certification Program, Revision 1. |
| 04/06/2011 | TVA | List of Design Differences, Revision 1. |
| 04/06/2011 | TVA | Safety Evaluation Report Supplement 22 - Response to NRC Required Action Items. |
| 04/01/2011 | TVA | Response to Request for Additional Information on Final Safety Analysis Report Section 9.3.2.6 for the Post Accident Sampling System. |
| 04/01/2011 | TVA | Revised Response to Requests for Additional Information on Individual Plant Examination of External Events Design Report. |
| 04/01/2011 | TVA | Response to Large Break Loss of Coolant Accident and Over-Pressurization Request for Additional Information. |
| 04/01/2011 | NRC | Status of Operating License Application Review Regarding Radioactive Waste Management and Environmental Impacts. |
| 03/31/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 03/28/2011 | TVA | Additional Information Related to NRC Environmental Review. |
| 03/25/2011 | TVA | Final Safety Analysis Report - Response to Requests for Additional Information Concerning the Nuclear Steam Supply System. |
| 03/25/2011 | TVA | Submittal of Pre-Op Test Instruction. |
| 03/24/2011 | TVA | Final Safety Analysis Report - Response to Chapter 10 Request for Additional Information. |
| 03/24/2011 | TVA | Additional Information Related to NRC Regarding Environmental Review. |
| 03/22/2011 | NRC | Notice of No Significant Antitrust Changes and Time for Filing Requests for Reevaluation. |
| 03/21/2011 | TVA | Re-submittal of Attachments for Responses to Hydrology Action Items. |
| 03/21/2011 | TVA | Submittal of Preservice Test Program Plan, Revision 1. |
| 03/16/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 03/15/2011 | TVA | Final Safety Analysis Report (FSAR), Amendment 103. |
| 03/11/2011 | TVA | Response After Completion of Engineering for the ECCS, RHR, and CSS Systems to NRC Generic Letter 2008-01: "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems". |
| 03/07/2011 | TVA | Submittal of Pre-op Test Instructions. |
| 03/04/2011 | TVA | Response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. |
| 03/02/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 02/25/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Chapters 11 and 12 Request for Additional Information. |
| 02/25/2011 | TVA | Instrumentation and Controls Staff Information Requests. |
| 02/25/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information. |
| 02/22/2011 | TVA | Response to Antitrust Clarification Questions. |
| 02/22/2011 | TVA | Submittal of Pre-op Test Instruction, 2-PTI-065-01, Revision 0. |
| 02/17/2011 | TVA | Relief Request to Use Subsequent Edition and Addenda of ASME Section XI Code for PSI Activities. |
| 02/16/2011 | TVA | Supplemental Information For Review of Developmental Revision A of the Unit 2 Technical Specifications (TS) and Technical Specifications Bases (TS Bases). |
| 02/16/2011 | TVA | Submittal of Pre-op Test Instructions. |
| 02/11/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information. |
| 02/10/2011 | TVA | Submittal of Pre-op Test Instructions. |
| 02/10/2011 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information. |
| 02/08/2011 | TVA | Response to Request for Additional Information Concerning Application for New License, Control No. 573898. |
| 02/07/2011 | TVA | Submittal of "Hydrothermal Effects on Ichthyoplankton from Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauge Reservoir," Report. |
| 01/31/2011 | NRC | NUREG-0847, Suppl. 22, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2." |
| 01/31/2011 | TVA | Request For Additional Information (RAI) Regarding Individual Plant Examination. |
| 01/27/2011 | TVA | Change to Developmental Technical Specification (TS) Section 3.1.8, "Rod Position Indication." |
| 01/27/2011 | NRC | Status of Operating License Application Review. |
| 01/25/2011 | TVA | Submittal Concerning Procedures for Unit 2 Special Nuclear Material. |
| 01/25/2011 | TVA | Status of Unresolved Safety Issues. |
| 01/24/2011 | TVA | Final Safety Analysis Report (FSAR), Section 2.4, "Hydrologic Engineering". |
| 01/21/2011 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 5 and Status of Generic Communications for Unit 2 - Revision 5. |
| 01/20/2011 | NRC | Commercial Grade Dedication of Hardware and Software Used in the Post Accident Monitoring System Audit Report. |
| 01/18/2011 | TVA | Submittal of Pre-op Test Instruction. |
| 01/13/2011 | TVA | American Society of Mechanical Engineers Section XI, Preservice Inspection Program - Request to Use Subsequent Edition and Addenda of ASME Section XI Code for PSI Activities. |
| 01/12/2011 | TVA | Submittal of Pre-Op Test Instructions. |
| 01/04/2011 | TVA | Response to Request for Additional Information Regarding Environmental Review. |
| 01/03/2011 | NRC | Notification of the Delays in Completing the Operating License Application Review Due to Processing the Associated Environmental Review. |
| 12/21/2010 | TVA | Submittal of Pre-op Test Instruction |
| 12/17/2010 | TVA | Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information |
| 12/14/2010 | TVA | Refurbishment Program and Licensing Basis Preservation Self Assessments |
| 12/10/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
| 12/06/2010 | TVA | Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information |
| 11/18/2010 | TVA | Response to Request for Additional Information Regarding Target Set Development |
| 11/09/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
| 10/29/2010 | TVA | Final Safety Analysis Report (FSAR), Amendment 101 |
| 10/13/2010 | TVA | Response to Request for Additional Information Regarding the Preservice Inspection Program Plan |
| 09/29/2010 | TVA | Response to Request for Additional Information (RAI) Regarding the Preservice Inspection Program Plan |
| 09/17/2010 | TVA | Response to NRC Question Regarding WBN Unit 2 Emergency Plan |
| 09/17/2010 | TVA | Response to NRC Request For Additional Information Regarding Severe Accident Management Alternatives SECPOP2000 Errors |
| 09/10/2010 | TVA | Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors |
| 09/02/2010 | TVA | Instrumentation and Controls Staff Information Requests |
| 09/01/2010 | TVA | Request for Additional Information (RAI) Regarding Final Safety Analysis Report Amendment Related Section 3.11 |
| 09/01/2010 | TVA | Final Safety Analysis Report (FSAR), Amendment 100 |
| 08/30/2010 | TVA | Submittal of Pre-op Test Instruction |
| 08/30/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
| 08/16/2010 | TVA | Change to Developmental TS Section 4.2.2, “Control Rod Assemblies.” |
| 08/12/2010 | TVA | Request for Additional Information (RAI) Regarding Individual Plant Examination |
| 08/11/2010 | TVA | NRC August 3-4, 2010, Instrumentation and Controls Meeting - Request for Additional Information |
| 08/06/2010 | TVA | Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information |
| 08/05/2010 | TVA | Response to NRC Regulatory Issue Summary 2010-08,Preparation and Scheduling of Operator Licensing Examinations |
| 08/05/2010 | TVA | Response to Request For Additional Information (RAI) Regarding Licensee's Final Safety Analysis Report Amendment Related To Chapter 8, "Electric Power" |
| 07/30/2010 | TVA | Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3 |
| 07/30/2010 | TVA | Response to Request for Additional Information Regarding Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves |
| 07/29/2010 | TVA | Response to Request for Additional Information Regarding Antitrust Review |
| 07/23/2010 | TVA | Request for Additional Information Regarding Severe Accident Management Alternatives |
| 07/16/2010 | TVA | Request for Additional Information Regarding Fire Protection Program |
| 07/14/2010 | TVA | Additional Information Regarding Final Safety Analysis Report (FSAR), Chapter 7, "Instrumentation And Controls" Review - Requested Common Q Proprietary Documents |
| 07/13/2010 | NRC | Request for Additional Information Regarding Antitrust Review |
| 07/12/2010 | TVA | Submittal of Preoperational Test Instructions |
| 07/12/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Electrical Engineering Systems |
| 07/12/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Accident Dose |
| 07/08/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Quality And Vendor Branch Review |
| 07/07/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Spent Fuel Storage And Handling Review |
| 07/02/2010 | TVA | Submittal of Additional Information Requested During May 12, 2010, Request for Additional Information (RAI) Clarification Teleconference Regarding Environmental Review |
| 07/02/2010 | NRC | Program for Construction Refurbishment |
| 07/02/2010 | NRC | Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Mechanical And Civil Engineering Systems |
| 07/01/2010 | NRC | Revised Notice of Receipt of Update Antitrust Information and Opportunity for Public Comment |
| 06/30/2010 | TVA | Safety evaluation regarding generic letter and bulletins related to reactor pressure vessel head inspections |
| 05/27/2010 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 99 |
| 05/07/2010 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 98 |
| 01/15/2010 | TVA | TVA’s Nuclear Quality Assurance Program, TVA-NQA-PLN89-A, Revision 22), with no reduction in commitment |
| 01/11/2010 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 97 |
| 12/14/2009 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 96 |
| 11/24/2009 | TVA | Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 95 |
| 10/21/2009 | NRC | Audit of TVA’s Management of Regulatory Commitments Program |
| 09/22/2009 | TVA | TVA Responses to Public Comments and Questions Regarding the Refurbishment Program |
| 09/09/2009 | NRC | Safety Evaluation for the Replacement Items Corrective Action Program Plans |
| 09/08/2009 | TVA | Additional information regarding licensing basis preservation and construction refurbishment program |
| 09/08/2009 | NRC | Safety Evaluation for the Quality Assurance Records Corrective Action Program Plans |
| 09/04/2009 | NRC | Notice of Intent to Prepare a Supplement to the Final Environmental Statement and Conduct the Scoping Process |
| 08/31/2009 | NRC | Safety Evaluation for the Cable and Electrical Corrective Action Program Plans |
| 08/27/2009 | TVA | Transmittal of Final Safety Analysis Report, Amendment 94 |
| 07/28/2009 | NRC | Establishment of Atomic Safety Licensing Board |
| 07/10/2009 | TVA | Additional Information Regarding Corrective Action Programs |
| 07/08/2009 | TVA | TVA Response to Request for Additional Information on Refurbishment Plan |
| 05/18/2009 | TVA | Additional Information Regarding Corrective Action Programs |
| 05/08/2009 | NRC | Public Notice of Receipt of Updated Appl. for Facility Operating License |
| 04/30/2009 | TVA | Submittal of Final Safety Analysis Report (FSAR), Amendment 93 |
| 04/28/2009 | NRC | Request for Additional Information on Programs for Licensing Basis Preservation and Construction Refurbishment |
| 04/27/2009 | NRC | Fed Notice- Receipt of Update to Application for Facility Operating license and notice of Additional Opportunity for Hearing |
| 04/22/2009 | NRC | Watts Bar, Unit 2, Notice of Receipt of Update to Application For Facility Operating License and Notice of Additional Opportunity for Hearing and Order |
| 04/22/2009 | NRC | Watts Bar Nuclear Plant, Unit 2 - Termination of Review of Watts Bar 2 Preservice Inspection Plan |
| 04/09/2009 | NRC | Information Letter to Governor Phil Bredesen Regarding an Updated Application Received for a Facility Operating License from TVA |
| 04/06/2009 | TVA | Additional Information Regarding WBN Unit 2 Corrective Action Programs |
| 03/11/2009 | NRC | Annual Assessment Letter |
| 03/04/2009 | TVA | Update to the OL application |
| 02/28/2009 | NRC | NUREG-0847, Supp. 21, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2" |
| 02/23/2009 | NRC | Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities |
| 02/11/2009 | NRC | Status of Regulatory Framework for the Completion of Corrective Action and Special Programs and Unresolved Safety Issues (TAC MD9424) |
| 01/29/2009 | NRC | Integrated Inspection Report, IR 05000391-08-001, on 10/01/2008 - 12/31/2008 |
| 01/27/2009 | TVA | Final Supplemental Environmental Impact Statement - Severe Accident Management Alternatives |
| 01/15/2009 | NRC | SECY-09-0012 - Status of Reactivation of Construction and Licensing Activities |
| 01/14/2009 | TVA | Response to Request for Additional Information Regarding Cable Issue Corrective Action Program |
| 12/09/2008 | TVA | Licensing Basis Preservation and Construction Refurbishment Program |
| 10/30/2008 | TVA | Submitting preservice inspection program plan |
| 10/10/2008 | NRC | Status of Regulatory Framework for the Completion of Operating License Review (TAC MD9424) |
| 10/02/2008 | NRC | Request For Relief Regarding Alternative Rules For Renewal of Active or Expired N-Type Certificates (TAC MD8314) |
| 09/26/2008 | TVA | Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues |
| 08/25/2008 | NRC | Status of Generic Communications for Review |
| 08/25/2008 | TVA | Westinghouse Eagle-21 Process Protection System |
| 07/29/2008 | NRC | IR 05000391-08-007, on 04/01/2008 - 06/30/2008, Watts Bar, Unit 2 |
| 07/29/2008 | TVA | Generic Communications Status, Revision 1 |
| 07/07/2008 | NRC | Order Extending Construction Permit to March 31, 2013 |
| 07/07/2008 | NRC | Order for Extension of Construction Permit ( Tac No. MD8389) |
| 07/02/2008 | TVA | Response to Request for Additional Information |
| 07/02/2008 | TVA | Final Supplemental Environmental Impact Statement - Request for Additional Information |
| 06/20/2008 | NRC | Environmental Assessment and Findings of No Significant Impact For Extension of Construction Permit (Tac No. MD8389) |
| 06/16/2008 | TVA | Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1 |
| 06/03/2008 | NRC | Request For Supplemental Information to Support Acceptance Review of Final Supplemental Environmental Impact Statement |
| 05/29/2008 | TVA | Cable Issues Corrective Action Program for the Completion of WBN Unit 2 |
| 05/28/2008 | NRC | Status of Generic Communications for Review (Tac No. MD8314) (See Attachment Below) |
| 05/28/2008 | NRC | NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 (ATTACHMENT ONLY) |
| 05/22/2008 | NRC | Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants (TAC No. MD8314) |
| 05/08/2008 | TVA | Request for Extension of Construction Permit CPPR-92 |
| 05/08/2008 | NRC | Assessment of Generic Communications Status |
| 05/08/2008 | NRC | Assessment of remaining licensing review scope |
| 05/07/2008 | NRC | Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311) |
| 03/20/2008 | TVA | Letter addressing Watts Bar Unit 2 Generic Communication status |
| 03/13/2008 | TVA | Supplementing the January 29, 2008, letter on the regulatory framework tables for the SER and its supplements to allow ease of review and provide additional definitions for section status |
| 03/06/2008 | TVA | Request extension of the construction permit to March 31, 2013 |
| 02/15/2008 | NRC | Instruction Manual Chapter 2517-WBN Unit 2 Construction Inspection Program |
| 02/15/2008 | TVA | Submittal of Final Supplemental Environmental Impact Statement |
| 02/01/2008 | TVA | Request to use ASME Code Case N 520 2 for expired N-type Certificates |
| 01/29/2008 | TVA | Submittal of regulatory framework letter for completion of unit 2 |
| 12/05/2007 | TVA | Notifying NRC that TVA will use the Westinghouse Eagle 21 process protection system on WBN Unit 2 |
| 10/23/2007 | NRC | Request for Additional Information, NRC staff will need for its own assessment of the status of the licensing review |
| 10/22/2007 | NRC | Acceptance of TVA 120 day notice of reactivation letter |
| 10/11/2007 | TVA | Informing the NRC that TVA does not see the need for additional exemptions or relief, other than those discussed in the attachment to this letter and those associated with preservice and inservice inspection programs |
| 09/07/2007 | TVA | Summary of Generic Communications with supplemental information on references to closure documentation where applicable |
| 09/07/2007 | TVA | Response to certain NRC Bulletins and Generic Letters for Watts Bar Unit 2 |
| 08/03/2007 | TVA | 120 day letter informing NRC reactivation of Unit 2 |
| 07/25/2007 | NRC | Commission Staff Requirements Memorandum on SECY-07-0096 |
| 06/07/2007 | NRC | Commission paper SECY-07-0096 describing policy issues |
| 04/03/2007 | TVA | Key Assumptions for the Possible Completion of Construction Activities |
| 11/14/2006 | TVA | Feasibility Study for the Completion of Construction Activities |
| 09/27/1976 | TVA | Supplement Cover letter |
| 06/30/1976 | TVA | Operating License Application Cover letter for the facility operating license |