Key Correspondence for Watts Bar Unit 2 Reactivation

The following is a list of correspondence on licensing and inspection activities for Watts Bar Unit 2.

| 2014 | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 |

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Originator Description
2014  
09/18/2014 NRC Watts Bar Nuclear Plant, Unit 2, Closeout of Generic Letter, 2004 02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors."
09/09/2014 NRC Memorandum and Order LBP 14 13 (Denying Motion to File New Contention and Terminating   Proceeding).
09/03/2014 TVA Response to NRC Requests Related to Granting an Operating License.
09/02/2014 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 Revision 12, and Status of Generic Communications for Unit 2 Revision 12.
08/29/2014 TVA Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Nuclear Quality Assurance Plan, TVA NQA PLN89 A.
08/28/2014 TVA Third Six Month Status Report in Response to the March 12, 2012,  Commission Order Modifying Licenses with Regard to Reliable Spent  Fuel Pool Instrumentation (Order Number EA 12 051) for Watts Bar Nuclear Plant.
08/28/2014 TVA Third Six-Month Status Report in Response to the March 12, 2012,  Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) for Watts Bar Nuclear Plant.
08/21/2014 TVA Response to Request for Additional Information Draft Two-Unit Offsite Dose Calculation Manual, Revision B
08/19/2014 NRC 2014/08/19 NRR E-mail Capture - Watts Bar 2 - RAI - Developmental Tech Specs Rev I
08/18/2014 TVA Watts Bar Nuclear Plant, Units 1 and 2 - Report for the Westinghouse Audit in Support of Reliable Spent Fuel Instrumentation Related to Order EA-12-051 (TAC MF0951 and MF1178).
08/06/2014 TVA Watts Bar, Unit 2 - Response to Request for Additional Information Related to Relief Requests Associated with Unit 2 Inservice Testing and Preservice Test Programs (MF4118).
08/05/2014 TVA Watts Bar Nuclear Plant, Units 1 & 2, Response to Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation (Order No. EA-14-044)
08/04/2014 NRC Watts Bar Nuclear Plant, Unit 2, Plan for Onsite Audit Regarding Tennessee Valley Authority Licensing Preservation Program.
07/31/2014 TVA Watts Bar, Unit 2 - WBRD-50-391/86-60 - Final Report and Revised Completion Schedule
07/23/2014 TVA Watts Bar, Unit 2, Demineralized Water System (System 059) Transition from ASME Section III to ASME Section XI.
07/22/2014 NRC 2014/07/22 NRR E-mail Capture - Watts Bar 2 - RAI - Developmental Tech Specs Rev I
07/15/2014 NRC 2014/07/15 NRR E-mail Capture - Watts Bar 2 - RAIs - Developmental Tech Specs Rev I
07/07/2014 NRC 2014/07/07 NRR E-mail Capture - Watts Bar 2 - RAIs - Developmental Tech Specs Rev I - Steam Generators 
06/30/2014 TVA Watts Bar, Unit 2, Supplemental Safety Evaluation Report Appendix HH Open Item 132 Commitment Closure.
06/27/2014 TVA Browns Ferry, Units 1, 2 & 3; Sequoyah, Units 1 & 2 and Watts Bar, Units 1 & 2 - Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request.
06/27/2014 TVA Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Submittal Extension to the Fifth Progress Update on Improved Flood Mitigation System Project.
06/25/2014 TVA Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051).
06/25/2014 TVA Watts Bar Nuclear Plant (WBN) Unit 2 - Probabilistic Risk Assessment (PRA) Summary Report - Information Previously Committed to Provide (TAC ME3334).
06/24/2014 TVA 2014/06/24 NRR E-mail Capture - Request for Additional Information Regarding the Relief Request Related to the Watts Bar Unit 2 Inservice test program (TAC MF 4118)
06/23/2014 SACE Curran Letter to Macfarlane Resubmitted re: Watts Bar Unit 2 Operating License Proceeding.
06/23/2014 TVA Watts Bar Nuclear Plant Unit 2 - Construction Deficiency Report 50-391/2014-01 - Potential Opening of Littelfuse Part Number FLAS005.T Fuses - Final Report.
     
06/16/2014 NRC 2014/06/16 NRR E-mail Capture - Watts Bar, Unit 2 - RAIs for Radiological Emergency Plan (NP-REP, Rev. 103)
06/16/2014 TVA Watts Bar Nuclear Plant, Unit 2 Submittal of Developmental Revision I of the Unit 2 Technical Specification (TS) and TS Bases and Developmental Revision D of the Unit 2 Technical Requirements Manual and Technical Requirements Manual Bases 
06/13/2014 TVA Watts Bar, Units 1 & 2, Responses to Degraded Voltage Issue Requests for Additional Information.
06/12/2014 TVA Watts Bar, Unit 2, Response to NRC Bulletin 2012-01, "Design Vulnerability in Electrical Power System."
06/10/2014 TVA Watts Bar, Unit 2 - Submittal of Pre-Operational Test Instruction 
05/22/2014 TVA Watts Bar, Unit 2, Fuel Thermal Conductivity Degradation, Response to Supplemental Safety Evaluation Report Open Item 61.
05/21/2014 NRC Watts Bar Nuclear Plant, Unit No. 2 - Request for the Use of Alternative Regarding ASME Boiler and Pressure Vessel Code, Code Case N-836, "Heat Exchange Tube Mechanical Plugging, Class 1 Section III, Division 1" (TAC No. MF3462)
05/21/2014 NRC Watts Bar Nuclear Plant, Unit 1 - E-mail re. WBN 1 Hydrology LAR with UFSAR Changes (TAC MF9130).
05/15/2014 NRC Watts Bar Nuclear Plant, Units 1 and 2 - Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0950, MF1177, MF0951, and MF1178).
05/13/2014 NRC Watts Bar, Investigative Synopsis OI 2-2013-012.
05/09/2014 TVA Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights.
05/08/2014 TVA Watts Bar, Unit 2 - Inservice Test (IST) Program/Preservice Test (PST) Program.
04/25/2014 TVA Watts Bar Nuclear Plant, Units 1 and 2 - 10 CFR 50.46 - Annual Report for 2013.
04/02/2014 TVA Watts Bar Nuclear Plant Unit 2- Submittal of Pre-operational Test Instruction
03/31/2014 TVA Tennessee Valley Authority's Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re: Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident.
03/31/2014 TVA Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Fourth Progress Update on Improved Flood Mitigation System Project.
03/31/2014 TVA Fourth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request.
03/26/2014 NRC Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051
03/20/2014 TVA Watts Bar Nuclear Plant Unit 2 - Supplemental Safety Evaluation Report 23, Appendix HH, Open Item 67- Component Cooling System Thermal Barrier Booster Pumps Above Possible Maximum Flood Level
03/11/2014 TVA Watts Bar Nuclear Plant Unit 2- Submittal of Pre-operational Test Instruction
03/10/2014 NRC Watts Bar Nuclear Plant Unit 2 – Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to 10 CFR 50.54(hh)(2)
03/06/2014 NRC Watts Bar Nuclear Plant, Units 1 and 2- Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (Mitigating Strategies)
03/05/2014 NRC Watts Bar Nuclear Plant Unit 2 E-Mail regarding Appendix HH Open Item 61 Regarding PAD Code
02/28/2014 TVA Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Watts Bar Nuclear Plant
02/20/2014 TVA Revision of Commitment- Safety Evaluation Input Regarding Quality Assurance Records- Corrective Action Program
02/10/2014 TVA Watts Bar, Unit 2 Request to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Code Case N-836
02/03/2014 TVA Watts Bar Nuclear Plant Unit 2- Diesel Generator Frequency Response to NUREG 0847 Supplemental Safety Evaluation Report 22, Open Item 32
02/03/2014 TVA Response to Request for Additional Information Regarding Response to Bulletin 2012-01, “Design Vulnerability in Electrical Power System”
01/10/2014 TVA Follow-up Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
01/09/2014 NRC Response to the Advisory Committee on Reactor Safeguards Letter, Dated Novemebr 26, 2013 on the Interim Review of Watts Bar Nuclear Plant Unit 2 Operating License Application

To top of page

2013  
12/20/2013 NRC Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies).
12/17/2013 TVA Revision of Commitment for Inspection and Repair of Kapton Insulated Pigtails within Electrical Containment Penetrations.
12/12/2013 TVA Watts Bar Unit 2, Submittal of Developmental Revision H of the Technical Specification and Technical Specification Bases.
12/12/2013 TVA Updated Inservice Test (IST) Program (Unit 1) and IST/Preservice Test (PST) Program.
12/12/2013 TVA Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision.
11/22/2013 TVA Response to NRC Request for Additional Information Related to Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051).
11/21/2013 NRC Letter and Order Granting Construction Permit Extension.
11/08/2013 NRC Construction Operational Preparedness Inspection Plan.
10/29/2013 TVA Change to Commitment Date re: Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-051.
10/24/2013 NRC Interim Staff Evaluation and Request for RAI Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation.
09/27/2013 NRC Environmental Assessment and Finding of No Significant Impact for Extension of Construction Permit.
09/26/2013 TVA Submittal of Revised Section 4.3.1, "Criticality" Developmental Revision G of the Unit 2 Technical Specification.
09/16/2013 TVA Response to Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design          Basis Accidents at Pressurized-Water Reactors.
09/06/2013 TVA Response to NRC Request for Additional Information Related to   Overall Integrated Plan in Response to the Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation.
09/05/2013 TVA Tennessee Valley Authority - Organization Topical Report, TVA-NPOD89-A.
08/28/2013 TVA First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) for Watts Bar Nuclear Plant.
08/28/2013 NRC Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049.
08/28/2013 TVA First Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051).
08/28/2013 TVA Emergency Core Cooling System Evaluation Model Changes.
08/21/2013 TVA Construction Deficiency Report 50-391/2013-03 - Failure to Implement Plant Changes - Final Report.
08/14/2013 TVA Final Safety Analysis Report (FSAR) Amendment 110.
08/13/2013 TVA Fuel Thermal Conductivity Degradation, Response to Supplemental Safety Evaluation Report Open Item 61.
08/06/2013 TBA Fuel Thermal Conductivity Degradation, Response to Supplemental Safety Evaluation Report Open Item 61.
08/02/2013 NRC RAI Related Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051).
07/31/2013 NRC Supplemental Biological Assessment.
07/25/2013 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 10, and Status of Generic Communications for Unit 2 - Revision 10.
07/18/2013 TVA Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Final Report.
07/18/2013 TVA Reply to Notice of Violation (EA-13-019) 391/2013611-01, -02, and -03 Related to TVA's Commercial Grade Dedication Program.
07/17/2013 NRC Order Granting Motion to Withdraw Contention 7, in the Matter of Tennessee Valley Authority.
07/17/2013 TVA Essential Raw Cooling Water and Component Cooling System Transition from ASME Section III to ASME Section XI.
07/15/2013 TVA Updated Strategy for FLEX Equipment Storage.
07/15/2013 SACE Southern Alliance for Clean Energy's Unopposed Motion to Withdraw Contention 7.
07/03/2013 NRC Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force.
06/30/2013 NRC NUREG-0847 Supp 26 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2".
06/27/2013 TVA Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue - Final Report.
06/13/2013 TVA Submittal of Three Revised Specifications from Developmental Revision G of Technical Specification.
06/06/2013 TVA Status Update of Completion Schedule for Phase 2 Staffing Assessment Regarding 60-Day Response to 3/12/12, Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54(f) Regarding Recommendations.
05/30/2013 NRC NUREG-0498 Supplement 2 Final Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2.
05/06/2013 TVA Construction Deficiency Report 50-391/2013-01 - Commercial Grade Dedication Program - Second Interim Report.
05/02/2013 TVA Service Air System Transition from ASME Section III to ASME Section XI.
04/29/2013 TVA Construction Deficiency Report 50-391/2013-02 - Instrument Sense Line Slope Issue-Interim Report.
04/25/2013 TVA 10 CFR 50.46 - 30-Day Report and Annnual Report for 2012.
03/21/2013 TVA Response to Request for Additional Information Regarding Technical Specifications Changes - Instrumentation and Controls Branch.
03/18/2013 TVA Response to Request for Additional Information Regarding Final Safety Analysis Report Amendment Related Section 3.11 - Revised.
03/18/2013 TVA Supplemental Condenser Cooling Water Thermal Mixing Report.
03/13/2013 TVA Transmittal of Revised Unit 1/Unit 2 As-Designed Fire Protection Report.
03/13/2013 NRC Request for Additional Information Regarding Technical Specifications Instrumentation and Controls Branch.
03/12/2013 TVA Transition From American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section III Division I to Section XI-Modification of Two Previous Statements.
02/28/2013 TVA Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049).
02/28/2013 TVA Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051).
02/14/2013 TVA Updated Response to NRC Bulletin 2011-01, "Mitigation Strategies".
02/07/2013 TVA Fire Protection Program - Commitment to Provide Additional Information on Multiple Spurious Operation (MSO) Scenarios.
02/07/2013 NRC Audit of the Licensee's Management of Regulatory Commitments.
01/31/2013 TVA Construction Deficiency Report 50-391/2013-01 -Commercial Grade Dedication Program - Interim Report. 
01/29/2013 TVA Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding , Required Response 1, Integrated Assessment Approach.
01/24/2013 TVA Documentation of Liability Insurance Coverage Requested Per Supplemental Safety Evaluation Report Open Item 25. 
01/24/2013 TVA Supplemental Safety Evaluation Report Appendix HH Item 50, Anchor Bolt Documentation and Pull Tests - Revision. 
01/24/2013 TVA Waste Confidence Rulemaking and Environmental Impact Statement. 
01/17/2013 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 9, and Status of Generic Communications for Unit 2 - Revision 9. 

To top of page

2012  
12/10/2012 TVA Instrumentation and Controls Staff Request for Additional Information Related to Supplemental Safety Evaluation Report Open Item 80. 
12/05/2012 TVA Watts Bar Nuclear Plant, Unit 2, Request for Additional Information Regarding Supplemental Condenser Cooling Water Velocity. 
11/29/2012 NRC Status Of 60-Day Response To Orders Modifying Licenses Regarding Recommendations 4.2, 5.1, And 7.1 Of The Near-Term Task Force Related To The Fukushima Dai-ichi Nuclear Power Plant Accident. 
11/01/2012 TVA Supplemental Safety Evaluation Report Open Item 70 Regarding the Preservice Inspection Program Plan.
10/31/2012 TVA Draft Two-Unit Offsite Dose Calculation Manual. 
10/29/2012 TVA Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049). 
10/29/2012 TVA Initial Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Fuel Pool Instrumentation (Order Number EA-12-051). 
10/25/2012 TVA 90-Day Response to NRC Bulletin 2012-01, "Design Vulnerability in Electric Power System."
10/23/2012 NRC Request to use ASME Code Cases N-520-4 and N-520-5 Regarding Alternative Rules for Renewal of Active or Expired N-Type Certificates.
10/17/2012 TVA Severe Accident Management Alternative Review.
10/16/2012 TVA 10 CFR 50.46 Estimated Increase in Peak Clad Temperature Due to the Effect of Fuel Pellet Thermal Conductivity Degradation and Peaking Factor Burndown Not Being Considered - 30 Day Report. 
10/04/2012 TVA Revision of Commitment for Unit 2's Implementation of the Maintenance Rule. 
10/04/2012 TVA NRC Bulletin No. 88-08, "Thermal Stresses in Piping Connected to Reactor Coolant System (RCS)" - Clarification. 
10/01/2012 TVA Notification of Completion of Review of Updated Hydrologic Analysis Results for Impact on Watts Bar Nuclear Plant Units 1 and 2 Final Environmental Statements.
09/06/2012 TVA Long-Term Stability Analysis Methodology.
08/30/2012 TVA Instrumentation and Controls Staff Request for Additional Information Related to Supplemental Safety Evaluation Report Open Item 80. 
08/27/2012 TVA Update to Technical Specification Table 3.3.3-1 and Technical Specification Bases 3.3.3. 
08/23/2012 TVA Final Safety Analysis Report, Amendment 109.
08/23/2012 TVA Request for Renewal of Special Nuclear Material License No. SNM-2014. 
08/15/2012 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 8, and Status of Generic Communications for Unit 2 - Revision 8. 
08/09/2012 NRC Order Holding Waste Confidence Contention in Abeyance. 
08/07/2012 NRC Commission Memorandum and Order (CLI-12-16) to Suspend Final Licensing Decisions for Watts Bar Nuclear Plant, to Grant the Requests in Part and Deny the Requests in Part.
07/31/2012 TVA Evaluation for Tube Vibration-Induced Fatigue. 
07/30/2012 TVA NUREG-0847 Supplemental Safety Evaluation Report Related to the Operation of WBN Unit 2, Appendix HH Open Item 5 and 8 - Core Map. 
07/26/2012 NRC Status of 90-Day Response to Request for Information Regarding Recommendation 9.3 of Near-Team Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident. 
07/24/2012 NRC SECY-12-0103 - Sixth Report on the Status of Reactivation of Construction and Licensing for Watts      Bar Nuclear Plant, Unit 2 
06/27/2012 TVA Submittal of Non-Proprietary Information Related to Final Safety Analysis Report Chapter 15 Transient Analysis. 
06/18/2012 NRC Response to NUREG-0847, Appendix HH Open Item 41 – Emergency Response Data System and Inspection Planning and Scheduling Item.
06/14/2012 TVA Response to NUREG-0847, Appendix HH Open Item 41 – Emergency Response Data System and Inspection Planning and Scheduling Item No. 519.
06/13/2012 TVA Response to Request for Additional Information Regarding Final Safety Analysis Report Amendment Related to Section 3.11 – Revised Response.
06/11/2012 TVA 90-Day Response to NRC Request of Information Pursuant to 10 CFR 50.54(f) Re: Seismic Aspects of Recommendations 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-Ichi Accident.
06/11/2012 TVA Estimates of Entrainment of Fish Eggs and Larvae at Watts Bar Nuclear Plant at Tennessee River Mile 528 from March 2010 through March 2011.
06/08/2012 NRC Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant.
06/07/2012 TVA Response to NUREG-0847, Appendix HH Open Item 26 – Diesel Generator.
06/07/2012 TVA Response to NUREG-0847, Appendix HH Open Item 30 – Power System Degraded Voltage.
06/05/2012 TVA Submittal of Revised Section 4.3, “Fuel Storage,” Developmental Revision G of Technical Specification.
05/18/2012 NRC Response to Corrective Actions with Task Interface Agreement for Notice of Violation.
05/17/2012 TVA Request for Extension to Construction Permit.
05/17/2012 NRC Task Interface Agreement on Notice of Violation.
05/17/2012 TVA Additional Information to Generic Letter 2004-02, “Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.”
05/01/2012 NRC NRC Staff's May 2012 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application.
04/23/2012 TVA Instrumentation and Controls Staff Information Requests.
03/30/2012 TVA 30-Day Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force review of the Insights from the Fukushima Dai-Ichi Accident.
03/30/2012 TVA Answer to Order with Regard to Reliable Spent Fuel Pool Instrumentation.
03/30/2012 TVA Answer to Order with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
03/23/2012 NRC Review Schedule Delay Due to Anticipated License Amendment Request and Hydrology Issues.
03/13/2012 TVA Fire Protection Report Revision of Commitments.
03/13/2012 NRC Correction to Issuance of Orders and Request for Information Issued Pursuant to Title 10 of the Code of Federal Regulations Part 50.54(f).
03/12/2012 NRC Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
03/12/2012 NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force review of the Insights from the Fukushima Dai-Ichi Accident.
03/12/2012 NRC Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.
03/12/2012 TVA Submittal of Previously Docketed Environmental Reports.
03/09/2012 TVA Instrumentation and Controls Staff Information Requests.
03/06/2012 NRC NRC Staff's March 2012 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application.
03/06/2012 ALSB Memorandum and Order Denying TVA’s Motion for Summary Disposition of SACE Contention 7.
03/05/2012 TVA Final Safety Analysis Report, Amendment 108.
03/02/2012 TVA Instrumentation and Controls Staff Information Requests.
02/28/2012 TVA Submittal of Developmental Revision G of the Technical Specification and Technical Specification Bases.
02/01/2012 TVA Instrumentation and Controls Staff Information Requests.
02/01/2012 FEMA FEMA Watts Bar, Final Exercise Report, Exercise Date – October 19, 2011.
01/27/2012 TVA Comment (5) of Brenda E. Brickhouse of Tennessee Valley Authority on the Draft Supplement 2 to Final Environmental Statement.
01/24/2012 SACE Comment (4) of Diane Curran, on Behalf of Southern Alliance for Clean Energy, on Draft Final Environmental Statement.
01/23/2012 DOI Comments and Recommendations on the Draft Supplemental Final Environmental Statement.
01/19/2012 CN Letter from Chickasaw Nation on Draft Final Environmental Statement.
01/19/2012 TVA Instrumentation and Controls Staff Information Requests.
01/19/2012 NRC Watts Bar Nuclear Plant, Unit 2 – Request for Relief Regarding Use of American Society of Mechanical Engineers Boiler & Pressure Vessel Code Cases N-801 and N-802.
01/18/2012 NRC Status of Operating License Application Review Regarding Fire Protection Program.
01/12/2012 TVA Final Safety Analysis Report – Revision to Chapter 15.2.4 Inadvertent Boron Dilution.
01/04/2012 PUB Comment (3) by Anonymous Individual Opposing Draft Supplement 2 to Final Environmental Statement.
01/03/2012 NRC NRC Staff's January 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application.

To top of page

2011  
12/28/2011 PUB Comment (1) of Donna Budnick on the Draft Supplement 2 to Final Environmental Statement.
12/27/2011 TVA Notification of National Pollutant Discharge Elimination System Permit Modification.
12/22/2011 TVA Instrumentation and Controls Staff Information Requests.
12/21/2011 TDOT Tennessee Department of Transportation Comment Letter.
12/21/2011 EPA EPA’s Comments on the DFES.
12/20/2011 NRC NRC Staff's Answer to TVA's Motion for Summary Disposition of Contention 7 Regarding Aquatic Impacts.
12/20/2011 SACE Certificate of Service of Copies of the Southern Alliance for Clean Energy's Opposition to TVA's Motion for Summary Disposition of Contention 7, Statement of Disputed Material Facts, and Declaration of Shawn Paul Young, Ph.D.
12/20/2011 SACE Declaration of Shawn Paul Young, Ph.D. on Behalf of Southern Alliance for Clean Energy
12/20/2011 SACE Southern Alliance for Clean Energy's Statement of Disputed Material Facts.
12/20/2011 SACE Southern Alliance for Clean Energy's Opposition to Tennessee Valley Authority's Motion for Summary Disposition of Contention 7 Regarding Aquatic Impacts of Watts Bar Unit 2.
12/20/2011 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 7, and Status of Generic Communications for Unit 2 - Revision 7.
12/20/2011 FWS Biological Assessment for Section 7 Consultation Related to the Operating License Application, Rhea County, Tennessee.
12/19/2011 DOI Comment (2) of Joyce Stanley, on Behalf of the U.S. Department of the Interior, on Draft Supplemental Environmental Statement, NUREG-0498, Supplement 2.
12/19/2011 NRC Extension of Comment Period on Draft Supplement to Final Environmental Statement for Operation.
12/15/2011 EPA EPA's Comments on the "Draft Final Environmental Statement, Related to the Operation of Watts Bar Nuclear Plant, Unit 2." Supplement, NUREG-0498, July 2011.
12/08/2011 NRC Transcripts for 12/8/2011 Draft Final Environmental Statement Public Comment Meeting.
11/30/2011 NRC NUREG-0847, Supp. 25, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2".
11/30/2011 TVA Instrumentation and Controls Staff Information Requests.
11/21/2011 CNO Letter from Choctaw Nation of Oklahoma on Draft Final Environmental Statement.
11/21/2011 TVA Tennessee Valley Authority's Motion for Summary Disposition of Contention 7.
11/18/2011 NRC Request for Additional Information Regarding Supplemental Evaluation Report Open Item 26.
11/18/2011 NRC Request for Additional Information Regarding Supplemental Safety Evaluation Report Open Items 80, 81, 105, and 108.
11/17/2011 TVA Final Safety Analysis Report, Amendment 107.
11/15/2011 NRC 11/08/2011 Meeting Summary with Tennessee Valley Authority to Discuss Watts Bar Nuclear Plant Unit 2 Construction Project.
11/14/2011 TVA Instrumentation and Controls Staff Information Requests.
11/07/2011 TVA Meteorology Data for Accident Dose Analysis.
11/02/2011 NRC Notice of Availability of the Draft Supplement to Final Environmental Statement for Operation (TAC No. MD8203).
11/01/2011 NRC NRC Staff's November 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application. 
10/31/2011 NRC NUREG-0498 Supp 2, "Draft Final Environmental Statement, Related to the Operation of Watts Bar Nuclear Plant, Unit 2".
10/31/2011 TVA Results of the Hydrology Analysis Without Use of Sand Baskets.
10/24/2011 TVA Safety Evaluation Report Supplement 23 - Response to NRC Required Action Item 71.
10/17/2011 TVA Revision of Commitment for Unit 2's Implementation of the Maintenance Rule.
10/17/2011 TVA Final Safety Analysis Report - Chapter 15.5 Fuel Handling Accident Dose Analysis.
10/13/2011 TVA Instrumentation And Controls Staff Information Requests.
09/30/2011 NRC NUREG-0847 Supp 24 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2."
09/30/2011 TVA Instrumentation & Controls Staff Information Requests.
09/23/2011 TVA Final Safety Analysis Report - Chapter 15.5 Fuel Handling Accident Dose Analysis.
09/21/2011 NRC Request for Additional Information Regarding Supplemental Safety Evaluation Report Open Item 80.
09/20/2011 NRC Review of Individual Plant Examination of External Events Design Report.
09/16/2011 TVA Revised Severe Accident Accident Management Design Alternative Review (SAMDA) Response.
09/15/2011 TVA Final Safety Analysis Report - Chapter 15.5 Design Basis Dose Analysis.
09/15/2011 TVA Final Safety Analysis Report - Revised Enclosures 3 & 5 for TVA to NRC Letter Dated December 10, 2010.
09/15/2011 TVA Final Safety Analysis Report, Amendment 106.
09/14/2011 NRC Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 7.
09/09/2011 NRC Anticipated License Amendment Requests.
09/07/2011 NRC Complete List of Comments, Suggestions, and Staff Responses Condensed From the October 6, 2009, Public Scoping Meeting.
09/06/2011 NRC NRC Staff's September 6, 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application.
09/01/2011 TVA Relief Request to Use American Society of Mechanical Engineers (ASME) Code Cases N 801 and N 802.
09/01/2011 TVA Safety Evaluation Report Supplement 22 - Response to NRC Required Action Item 11.
09/01/2011 TVA Instrumentation and Controls Staff Information Requests.
09/01/2011 TVA American Society of Mechanical Engineers Boiler and Pressure Vessel Code Transition - Revised Commitment.
08/23/2011 NRC Closeout of Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Containment Spray System."
08/22/2011 TVA Response to Request for Additional Information on the Determination of the 50 Mile Population Dose.
08/15/2011 TVA Transmittal of Revised Unit 1 / Unit 2 As-Designed Fire Protection Report.
08/12/2011 NRC Transition of Components to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI.
08/12/2011 NRC Review of Individual Plant Examination Submittal - Internal Events and Internal Flood.
08/12/2011 TVA Safety Evaluation Report Supplement 22 - Response to NRC Required Action Item.
08/12/2011 TVA Final Safety Analysis Report, Amendment 105.
08/10/2011 TVA Submittal of Complete Version of Developmental Revision of the Technical Specifications and Technical Specifications Bases.
08/05/2011 TVA Final Safety Analysis Report - Chapter 15.5 Design Basis Accident Dose Analysis.
08/04/2011 TVA Instrumentation and Controls Staff Information Requests.
08/03/2011 TVA Request for Additional Information Regarding Final Safety Analysis Report Amendment Related Section 3.11 - Revised Response.
07/29/2011 TVA Response to Request for Additional Information Regarding June 28, 2011 NRC Audit- Steam Line Break and other Miscellaneous RAIs.
07/28/2011 TVA Notification of National Pollutant Discharge Elimination System Permit Renewal and Approval.
07/28/2011 TVA Results from Cost-Benefit Analysis of Radwaste System Enhancements.
07/27/2011 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 6, and Status of Generic Communications for Unit 2 - Revision 6.
07/27/2011 TVA Response to Chapter 12 Request for Additional Information.
07/27/2011 NRC Request for Additional Information Regarding Incore Instrumentation System.
07/21/2011 NRC Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Group 6.
07/20/2011 NRC Request for Additional Information Regarding Final Safety Analysis Report Related to Section 15.
07/20/2011 NRC Schedule of Licensing Activities.
07/18/2011 TVA Response to Request for Additional Information Regarding June 28, 2011 NRC Audit.
07/18/2011 TVA Response to NRC Bulletin 2011-01, "Mitigation Strategies".
07/14/2011 TVA Response to Request for Additional Information Regarding Compliance with 10 CFR 50.68(b)(6).
07/13/2011 TVA Submittal of Pre-op Test Instruction, 2-PTI-261-01, Rev. 0.
07/07/2011 NRC Questions Raised to the NRC During the June 20 Public Meeting Regarding the Watts Bar Unit 2 Construction Project.
07/05/2011 NRC NRC Staff's July 2011 Bimonthly Report Regarding the Schedule for Review of the Watts Bar Number 2 License Application.
06/30/2011 NRC NUREG-0847 Supp 23 "Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2."
06/29/2011 NRC IR 05000391-11-604, on 04/03/2011 - 05/21/2011, Watts Bar Nuclear Plant, Unit 2, Construction - NRC Integrated Inspection Report.
06/29/2011 NRC Summary of Public Meeting with Tennessee Valley Authority on Watts Bar Nuclear Plant Unit 2 Construction Project.
06/27/2011 TVA Response to Request for Additional Information Regarding April 27, 2011 NRC Audit.
06/27/2011 TVA Final Safety Analysis Report - Response to Request for Additional Information Regarding Accident Dose Analysis Basis.
06/27/2011 TVA Response to Request for Additional Information on Severe Accident Management Design Alternatives.
06/24/2011 TVA Response to Final Safety Analysis Report, and Final Supplemental Environmental Impact Statement.
06/24/2011 TVA Final Safety Analysis Report - Response to Chapter 11 Request for Additional Information.
06/23/2011 TVA Instrumentation and Controls Staff Information Requests.
06/21/2011 TVA Submittal of Pre-op Test Instruction.
06/21/2011 TVA Response to NRC Staff Comments on Developmental Revisions of the Unit 2 Technical Specifications and Technical Specification Bases; Submittal of Developmental Revision F.
06/17/2011 TVA Transmittal of Quality Assurance Assessment Report NGDC-WB-11-007, Licensing Basis Preservation.
06/17/2011 TVA Response To Request For Additional Information Regarding Severe Accident Management Alternative Review.
06/15/2011 NRC Press Release-11-107: NRC Issues License to TVA Authorizing Receipt of Fresh Nuclear Fuel for Watts Bar Nuclear Plant, Unit 2.
06/15/2011 NRC Letter to A. Bhatnagar: Issuance of Special Nuclear Materials License No. SNM-2014 for Watts Bar Nuclear Plant, Unit 2 (TAC L32918).
06/13/2011 NRC Request for Additional Information Regarding Severe Accident Mitigation Design Alternatives Review - June 2011.
06/10/2011 TVA Instrumentation and Controls Staff Information Requests.
06/10/2011 TVA Response to NRC Bulletin 2011-01, "Mitigating Strategies".
06/10/2011 TVA Cyber Security Implementation Schedule Including Systems Common to WBN, Unit 1.
06/09/2011 TVA Reply to Notice of Violation 0500039/112010603-08 - Failure to Adequately Evaluate and Qualify Molded Case Circuit Breakers - Revised Response.
06/09/2011 TVA Submittal of Pre-op Test Instruction.
06/08/2011 NRC IR 05000390-11-403 & 05000391-11-403, on 05/27/11, Watts Bar Nuclear Plant.
06/08/2011 NRC Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 5.
06/07/2011 TVA Safety Evaluation Report Supplement 22 (SSER 22) - Second Response to NRC Required Action Items.
06/06/2011 TVA Final Safety Analysis Report - Response to Request for Additional Information Regarding Accident Dose Analysis Basis.
06/03/2011 TVA Final Safety Analysis Report (FSAR), Amendment 104.
06/02/2011 TVA Completion of Temporary Instruction 184, "Availability and Readiness Inspection of Severe Accident Mitigation Guidelines" at Region II Facilities - Revision.
06/01/2011 TVA Information Presented in the May 11-12, 2011 TVA/NRC Meeting Regarding Final Safety Analysis Report Section 2.4.
05/26/2011 TVA Response to Request for Information from Public Meeting on May 11, 2011.
05/25/2011 TVA Response to Request for Additional Information Item Numbers 2, 3, 5 and 15 Regarding Severe Accident Management Design Alterative Review.
05/24/2011 TVA Responses to Request for Additional Information Regarding (1) Bottom Mounted Instrument Tube Failure and (2) Mass Addition Events.
05/24/2011 TVA Submittal of Pre-op Test Instruction, 2-PTI-065-02, Rev. 0, "Emergency Gas Treatment System Pressure Test."
05/23/2011 NRC Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 4.
05/20/2011 TVA Response to Final Safety Analysis Report, Chapter 11 and Final Supplemental Environmental Impact Statement Request for Additional Information.
05/20/2011 TVA Revised Response to Request for Additional Information Question 3 Regarding Final Safety Analysis Report Section 2.4.
05/20/2011 TVA Instrumentation and Controls Staff Information Requests - Presentation Package for Public Meeting Held on May 12, 2011.
05/20/2011 TVA Cyber-Security Program Implementation Schedule.
05/19/2011 TVA Response to Request for Additional Information on Intake Pumping Station Water Velocity.
05/13/2011 TVA Response To Request For Additional Information Regarding Severe Accident Management Design Alternative Review.
05/13/2011 TVA Additional Responses to Request for Additional Information Regarding (1) Large Break Loss of Coolant Accident, (2) Steam Line Break, and (3) Miscellaneous Analysis.
05/10/2011 NRC End of Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2011601).
05/09/2011 TVA Response to Request for Additional Information Regarding Mitigation Strategy Assessments and Closure Process for Phases 1, 2, and 3 - Revised Response for RAI 2.
05/09/2011 NRC Multi-Unit Operator Training and Certification Program, Revision 1, Errata.
05/06/2011 TVA Instrumentation and Controls Staff Information Requests.
04/29/2011 TVA Response to Requests for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage of Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
04/29/2011 TVA Response to Requests for Additional Information Regarding Inadvertent ECCS Actuation Analysis, and Chemical & Volume Control System Malfunction Analysis.
04/29/2011 TVA Response to Request for Additional Information on New Fuel Receipt and Storage.
04/29/2011 TVA Intake Pumping Station Water Velocity - Response to Request for Additional Information.
04/27/2011 NRC Accident Analyses Audit Report Westinghouse Documents Relating to Final Safety Analysis Report Accident Analyses.
04/27/2011 NRC Audit Report of the Common Q Post Accident Monitoring System.
04/25/2011 NRC Request for Additional Information Regarding Generic Letter 2004-02 Round 2.
04/25/2011 NRC Request for Additional Information Regarding Final Safety Analysis Report Related to Section 9.5.1 Fire Protection Round 3.
04/21/2011 TVA Withdrawal of A Previous Comment.
04/20/2011 TVA Response to Request for Additional Information Regarding Final Safety Analysis Report Section 2.4.
04/19/2011 TVA Submittal of Pre-Op Test Instruction, 2-PTI-030H-01, Rev. 0, "Lower Compartment Coolers."
04/19/2011 NRC Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water.
04/13/2011 TVA Response to Request For Additional Information (RAIs) Related to FSAR Sections 9.2.1 and 9.2.2.
04/13/2011 NRC Status of Operating License Application Review and Project Schedule Implications.
04/11/2011 NRC Multi-Unit Operator Training and Certification Program, Revision 1.
04/06/2011 TVA List of Design Differences, Revision 1.
04/06/2011 TVA Safety Evaluation Report Supplement 22 - Response to NRC Required Action Items.
04/01/2011 TVA Response to Request for Additional Information on Final Safety Analysis Report Section 9.3.2.6 for the Post Accident Sampling System.
04/01/2011 TVA Revised Response to Requests for Additional Information on Individual Plant Examination of External Events Design Report.
04/01/2011 TVA Response to Large Break Loss of Coolant Accident and Over-Pressurization Request for Additional Information.
04/01/2011 NRC Status of Operating License Application Review Regarding Radioactive Waste Management and Environmental Impacts.
03/31/2011 TVA Instrumentation and Controls Staff Information Requests.
03/28/2011 TVA Additional Information Related to NRC Environmental Review.
03/25/2011 TVA Final Safety Analysis Report - Response to Requests for Additional Information Concerning the Nuclear Steam Supply System.
03/25/2011 TVA Submittal of Pre-Op Test Instruction.
03/24/2011 TVA Final Safety Analysis Report - Response to Chapter 10 Request for Additional Information.
03/24/2011 TVA Additional Information Related to NRC Regarding Environmental Review.
03/22/2011 NRC Notice of No Significant Antitrust Changes and Time for Filing Requests for Reevaluation.
03/21/2011 TVA Re-submittal of Attachments for Responses to Hydrology Action Items.
03/21/2011 TVA Submittal of Preservice Test Program Plan, Revision 1.
03/16/2011 TVA Instrumentation and Controls Staff Information Requests. 
03/15/2011 TVA Final Safety Analysis Report (FSAR), Amendment 103.
03/11/2011 TVA Response After Completion of Engineering for the ECCS, RHR, and CSS Systems to NRC Generic Letter 2008-01: "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems".
03/07/2011 TVA Submittal of Pre-op Test Instructions.
03/04/2011 TVA Response to Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
03/02/2011 TVA Instrumentation and Controls Staff Information Requests.
02/25/2011 TVA Final Safety Analysis Report (FSAR) - Response to Chapters 11 and 12 Request for Additional Information. 
02/25/2011 TVA Instrumentation and Controls Staff Information Requests.
02/25/2011 TVA Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information.
02/22/2011 TVA Response to Antitrust Clarification Questions.
02/22/2011 TVA Submittal of Pre-op Test Instruction, 2-PTI-065-01, Revision 0.
02/17/2011 TVA Relief Request to Use Subsequent Edition and Addenda of ASME Section XI Code for PSI Activities.
02/16/2011 TVA Supplemental Information For Review of Developmental Revision A of the Unit 2 Technical Specifications (TS) and Technical Specifications Bases (TS Bases).
02/16/2011 TVA Submittal of Pre-op Test Instructions.
02/11/2011 TVA Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information.
02/10/2011 TVA Submittal of Pre-op Test Instructions.
02/10/2011 TVA Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information.
02/08/2011 TVA Response to Request for Additional Information Concerning Application for New License, Control No. 573898.
02/07/2011 TVA Submittal of "Hydrothermal Effects on Ichthyoplankton from Watts Bar Nuclear Plant Supplemental Condenser Cooling Water Outfall in Upper Chickamauge Reservoir," Report.
01/31/2011 NRC NUREG-0847, Suppl. 22, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2."
01/31/2011 TVA Request For Additional Information (RAI) Regarding Individual Plant Examination.
01/27/2011 TVA Change to Developmental Technical Specification (TS) Section 3.1.8, "Rod Position Indication." 
01/27/2011 NRC Status of Operating License Application Review.
01/25/2011 TVA Submittal Concerning Procedures for Unit 2 Special Nuclear Material.
01/25/2011 TVA Status of Unresolved Safety Issues.
01/24/2011 TVA Final Safety Analysis Report (FSAR), Section 2.4, "Hydrologic Engineering".
01/21/2011 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 5 and Status of Generic Communications for Unit 2 - Revision 5.
01/20/2011 NRC Commercial Grade Dedication of Hardware and Software Used in the Post Accident Monitoring System Audit Report.
01/18/2011 TVA Submittal of Pre-op Test Instruction.
01/13/2011 TVA American Society of Mechanical Engineers Section XI, Preservice Inspection Program - Request to Use Subsequent Edition and Addenda of ASME Section XI Code for PSI Activities.
01/12/2011 TVA Submittal of Pre-Op Test Instructions.
01/04/2011 TVA Response to Request for Additional Information Regarding Environmental Review.
01/03/2011 NRC Notification of the Delays in Completing the Operating License Application Review Due to Processing the Associated Environmental Review.

To top of page

2010  
12/21/2010 TVA Submittal of Pre-op Test Instruction
12/17/2010 TVA Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information
12/14/2010 TVA Refurbishment Program and Licensing Basis Preservation Self Assessments
12/10/2010 TVA Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information
12/06/2010 TVA Safety Evaluation Report Supplement 22 (SSER22) - Response to Requests for Additional Information
11/18/2010 TVA Response to Request for Additional Information Regarding Target Set Development
11/09/2010 TVA Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information
10/29/2010 TVA Final Safety Analysis Report (FSAR), Amendment 101
10/13/2010 TVA Response to Request for Additional Information Regarding the Preservice Inspection Program Plan
09/29/2010 TVA Response to Request for Additional Information (RAI) Regarding the Preservice Inspection Program Plan
09/17/2010 TVA Response to NRC Question Regarding WBN Unit 2 Emergency Plan
09/17/2010 TVA Response to NRC Request For Additional Information Regarding Severe Accident Management Alternatives SECPOP2000 Errors
09/10/2010 TVA Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
09/02/2010 TVA Instrumentation and Controls Staff Information Requests
09/01/2010 TVA Request for Additional Information (RAI) Regarding Final Safety Analysis Report Amendment Related Section 3.11
09/01/2010 TVA Final Safety Analysis Report (FSAR), Amendment 100
08/30/2010 TVA Submittal of Pre-op Test Instruction
08/30/2010 TVA Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information
08/16/2010 TVA Change to Developmental TS Section 4.2.2, “Control Rod Assemblies.”
08/12/2010 TVA Request for Additional Information (RAI) Regarding Individual Plant Examination
08/11/2010 TVA NRC August 3-4, 2010, Instrumentation and Controls Meeting - Request for Additional Information
08/06/2010 TVA Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information
08/05/2010 TVA Response to NRC Regulatory Issue Summary 2010-08,Preparation and Scheduling of Operator Licensing Examinations
08/05/2010 TVA Response to Request For Additional Information (RAI) Regarding Licensee's Final Safety Analysis Report Amendment Related To Chapter 8, "Electric Power"
07/30/2010 TVA Status of Regulatory Framework for the Completion of Construction and Licensing for Unit 2 - Revision 3, and Status of Generic Communications for Unit 2 - Revision 3
07/30/2010 TVA Response to Request for Additional Information Regarding Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves
07/29/2010 TVA Response to Request for Additional Information Regarding Antitrust Review
07/23/2010 TVA Request for Additional Information Regarding Severe Accident Management Alternatives
07/16/2010 TVA Request for Additional Information Regarding Fire Protection Program
07/14/2010 TVA Additional Information Regarding Final Safety Analysis Report (FSAR), Chapter 7, "Instrumentation And Controls" Review - Requested Common Q Proprietary Documents
07/13/2010 NRC Request for Additional Information Regarding Antitrust Review
07/12/2010 TVA Submittal of Preoperational Test Instructions
07/12/2010 NRC Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Electrical Engineering Systems
07/12/2010 NRC Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Accident Dose
07/08/2010 NRC Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Quality And Vendor Branch Review
07/07/2010 NRC Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Spent Fuel Storage And Handling Review
07/02/2010 TVA Submittal of Additional Information Requested During May 12, 2010, Request for Additional Information (RAI) Clarification Teleconference Regarding Environmental Review
07/02/2010 NRC Program for Construction Refurbishment
07/02/2010 NRC Request for Additional Information Regarding Licensee's Final Safety Analysis Report Amendment Related to Mechanical And Civil Engineering Systems
07/01/2010 NRC Revised Notice of Receipt of Update Antitrust Information and Opportunity for Public Comment
06/30/2010 TVA Safety evaluation regarding generic letter and bulletins related to reactor pressure vessel head inspections
05/27/2010 TVA Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 99
05/07/2010 TVA Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 98
01/15/2010 TVA TVA’s Nuclear Quality Assurance Program, TVA-NQA-PLN89-A, Revision 22), with no reduction in commitment
01/11/2010 TVA Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 97

To top of page

2009  
12/14/2009 TVA Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 96
11/24/2009 TVA Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 95
10/21/2009 NRC Audit of TVA’s Management of Regulatory Commitments Program
09/22/2009 TVA TVA Responses to Public Comments and Questions Regarding the Refurbishment Program
09/09/2009 NRC Safety Evaluation for the Replacement Items Corrective Action Program Plans
09/08/2009 TVA Additional information regarding licensing basis preservation and construction refurbishment program
09/08/2009 NRC Safety Evaluation for the Quality Assurance Records Corrective Action Program Plans
09/04/2009 NRC Notice of Intent to Prepare a Supplement to the Final Environmental Statement and Conduct the Scoping Process
08/31/2009 NRC Safety Evaluation for the Cable and Electrical Corrective Action Program Plans
08/27/2009 TVA Transmittal of Final Safety Analysis Report, Amendment 94
07/28/2009 NRC Establishment of Atomic Safety Licensing Board
07/10/2009 TVA Additional Information Regarding Corrective Action Programs
07/08/2009 TVA TVA Response to Request for Additional Information on Refurbishment Plan
05/18/2009 TVA Additional Information Regarding Corrective Action Programs
05/08/2009 NRC Public Notice of Receipt of Updated Appl. for Facility Operating License
04/30/2009 TVA Submittal of Final Safety Analysis Report (FSAR), Amendment 93
04/28/2009 NRC Request for Additional Information on Programs for Licensing Basis Preservation and Construction Refurbishment
04/27/2009 NRC Fed Notice- Receipt of Update to Application for Facility Operating license and notice of Additional Opportunity for Hearing
04/22/2009 NRC Watts Bar, Unit 2, Notice of Receipt of Update to Application For Facility Operating License and Notice of Additional Opportunity for Hearing and Order
04/22/2009 NRC Watts Bar Nuclear Plant, Unit 2 - Termination of Review of Watts Bar 2 Preservice Inspection Plan
04/09/2009 NRC Information Letter to Governor Phil Bredesen Regarding an Updated Application Received for a Facility Operating License from TVA
04/06/2009 TVA Additional Information Regarding WBN Unit 2 Corrective Action Programs
03/11/2009 NRC Annual Assessment Letter
03/04/2009 TVA Update to the OL application
02/28/2009 NRC NUREG-0847, Supp. 21, "Safety Evaluation Report, Related to the Operation of Watts Bar Nuclear Plant, Unit 2"
02/23/2009 NRC Summary of December 11, 2008, Meeting with Tennessee Valley Authority on Status of Construction and Licensing Activities
02/11/2009 NRC Status of Regulatory Framework for the Completion of Corrective Action and Special Programs and Unresolved Safety Issues (TAC MD9424)
01/29/2009 NRC Integrated Inspection Report, IR 05000391-08-001, on 10/01/2008 - 12/31/2008
01/27/2009 TVA Final Supplemental Environmental Impact Statement - Severe Accident Management Alternatives
01/15/2009 NRC SECY-09-0012 - Status of Reactivation of Construction and Licensing Activities
01/14/2009 TVA Response to Request for Additional Information Regarding Cable Issue Corrective Action Program

To top of page

2008  
12/09/2008 TVA Licensing Basis Preservation and Construction Refurbishment Program
10/30/2008 TVA Submitting preservice inspection program plan
10/10/2008 NRC Status of Regulatory Framework for the Completion of Operating License Review (TAC MD9424)
10/02/2008 NRC Request For Relief Regarding Alternative Rules For Renewal of Active or Expired N-Type Certificates (TAC MD8314)
09/26/2008 TVA Regulatory Framework for the Completion of Construction and Licensing Activities for Unit 2 - Corrective Action and Special Programs, and Unresolved Safety Issues
08/25/2008 NRC Status of Generic Communications for Review
08/25/2008 TVA Westinghouse Eagle-21 Process Protection System
07/29/2008 NRC IR 05000391-08-007, on 04/01/2008 - 06/30/2008, Watts Bar, Unit 2
07/29/2008 TVA Generic Communications Status, Revision 1
07/07/2008 NRC Order Extending Construction Permit to March 31, 2013
07/07/2008 NRC Order for Extension of Construction Permit ( Tac No. MD8389)
07/02/2008 TVA Response to Request for Additional Information
07/02/2008 TVA Final Supplemental Environmental Impact Statement - Request for Additional Information
06/20/2008 NRC Environmental Assessment and Findings of No Significant Impact For Extension of Construction Permit (Tac No. MD8389)
06/16/2008 TVA Response to Additional Information Request on Regulatory Framework for the Completion of Construction and Licensing, Revision 1
06/03/2008 NRC Request For Supplemental Information to Support Acceptance Review of Final Supplemental Environmental Impact Statement
05/29/2008 TVA Cable Issues Corrective Action Program for the Completion of WBN Unit 2
05/28/2008 NRC Status of Generic Communications for Review (Tac No. MD8314) (See Attachment Below)
05/28/2008 NRC NRC Review: Generic Communications Status for TVA Watts Bar Unit 2 (ATTACHMENT ONLY)
05/22/2008 NRC Request for Additional Information, Renewal of Active or Expired N-Type Certificates for Plants (TAC No. MD8314)
05/08/2008 TVA Request for Extension of Construction Permit CPPR-92
05/08/2008 NRC Assessment of Generic Communications Status
05/08/2008 NRC Assessment of remaining licensing review scope
05/07/2008 NRC Request for Additional Information Regarding Eagle-21 Process Protection System (Tac No. MD6311)
03/20/2008 TVA Letter addressing Watts Bar Unit 2 Generic Communication status
03/13/2008 TVA Supplementing the January 29, 2008, letter on the regulatory framework tables for the SER and its supplements to allow ease of review and provide additional definitions for section status
03/06/2008 TVA Request extension of the construction permit to March 31, 2013
02/15/2008 NRC Instruction Manual Chapter 2517-WBN Unit 2 Construction Inspection Program
02/15/2008 TVA Submittal of Final Supplemental Environmental Impact Statement
02/01/2008 TVA Request to use ASME Code Case N 520 2 for expired N-type Certificates
01/29/2008 TVA Submittal of regulatory framework letter for completion of unit 2

To top of page

2007  
12/05/2007 TVA Notifying NRC that TVA will use the Westinghouse Eagle 21 process protection system on WBN Unit 2
10/23/2007 NRC Request for Additional Information, NRC staff will need for its own assessment of the status of the licensing review
10/22/2007 NRC Acceptance of TVA 120 day notice of reactivation letter
10/11/2007 TVA Informing the NRC that TVA does not see the need for additional exemptions or relief, other than those discussed in the attachment to this letter and those associated with preservice and inservice inspection programs
09/07/2007 TVA Summary of Generic Communications with supplemental information on references to closure documentation where applicable
09/07/2007 TVA Response to certain NRC Bulletins and Generic Letters for Watts Bar Unit 2
08/03/2007 TVA 120 day letter informing NRC reactivation of Unit 2
07/25/2007 NRC Commission Staff Requirements Memorandum on SECY-07-0096
06/07/2007 NRC Commission paper SECY-07-0096 describing policy issues
04/03/2007 TVA Key Assumptions for the Possible Completion of Construction Activities

To top of page

2006  
11/14/2006 TVA Feasibility Study for the Completion of Construction Activities
09/27/1976 TVA Supplement Cover letter
06/30/1976 TVA Operating License Application Cover letter for the facility operating license