Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Honeywell

1.0 Site Identification

Type of Site: Fuel Cycle Facility
Location: Metropolis, IL
License No.: SUB-526
Docket No.: 40-3392
License Status: Active
Project Manager: Jack Sulima

2.0 Site Status Summary

Honeywell has requested decommissioning of a portion of its Metropolis Works facility located in Metropolis, IL. Honeywell anticipates that plant operations would continue during and after the decommissioning. NRC staff is currently reviewing Honeywell's DP for this partial decommissioning action.

3.0 Major Technical or Regulatory Issues

Honeywell's proposed decommissioning design presents several unusual challenges because Honeywell has elected to leave waste in place under unrestricted land use conditions. Complicating the NRC's evaluation is Honeywell's simultaneous request to EPA seeking closure of this same portion of the facility.

4.0 Estimated Date For Closure

 