Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal
Accession Number: ML23165A212
Date Released: Monday, June 26, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23165A213 - Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal ([EstimatedPageCount] page(s), 6/13/2023)
- ML23165A215 - Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12 ([EstimatedPageCount] page(s), 6/13/2023)
- ML23165A216 - Enclosure 3: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Tier 1, Revision 11 ([EstimatedPageCount] page(s), 6/13/2023)
- ML23165A218 - Enclosure 8: Vogtle Electric Generating Plant, Units 3 and 4, Technical Requirements Manual (TRM), Revision 20 ([EstimatedPageCount] page(s), 6/13/2023)
- ML23165A219 - Enclosure 9: Vogtle Electric Generating Plant, Units 3 and 4, Technical Specifications Bases, Revision 73 ([EstimatedPageCount] page(s), 6/13/2023)
- ML23165A220 - Enclosure 5: Vogtle Electric Generating Plant (VEGP) Units 3 and 4, List of VEGP 3&4 UFSAR and VEGP 3&4 Tier 1 Figures and Sections Containing Security-Related Information or Proprietary Information. Enclosure 6: Affidavit from Southern Nuclear ..... ([EstimatedPageCount] page(s), 6/13/2023)