Home > NRC Library > ADAMS Public Documents
LaSalle, Unit 1 - Report of Compliance with March 12, 2012 Commission Order Modifying Licenses with regard to Requirements of Mitigation Strategies for Beyond-Design-Basis External Events.
Accession Number: ML18130A750
Date Released: Tuesday, May 15, 2018
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18130A751 - LaSalle, Unit 1 - Report of Compliance with March 12, 2012 Commission Order Modifying Licenses with regard to Requirements of Mitigation Strategies for Beyond-Design-Basis External Events. (89 page(s), 5/9/2018)
- ML18130A752 - LaSalle, Unit 1 - Final integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figure 1, FLEX Hose Deployment. (1 page(s), 5/9/2018)
- ML18130A753 - LaSalle, Unit 1 - Final Integrated Plan Document - Mitigating Strategies NRC Order EA-12-049, Figures 2 through 15. (14 page(s), 5/9/2018)