Home > NRC Library > ADAMS Public Documents
Baffle Former Bolt July 19, 2016 Meeting.
Accession Number: ML16208A001
Date Released: Monday, March 13, 2017
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML16202A073 - Industry Baffle-Former Bolt Focus Group NRC Update - Charter and Objectives. (13 page(s), 7/19/2016)
- ML16202A076 - Industry Baffle-Former Bolt Focus Group NRC Update. (15 page(s), 7/19/2016)
- ML16202A063 - Westinghouse Electric Company, LLC., Baffle-Former Bolt NSAL-16-1. (11 page(s), 7/19/2016)
- ML16202A072 - Areva Baffle-to-Former Bolt Customer Service Bulletin No. 16-02. (8 page(s), 7/19/2016)
- ML16203A025 - 1- Baffle-Former Bolt Overview of Industry Experience. (20 page(s), 7/19/2016)
- ML16203A029 - Baffle-Former Bolts Public Meeting July 19 NRC Slides. (6 page(s), 7/19/2016)
- ML16166A005 - 07/19/2016 - Meeting Agenda - Meeting on Baffle-Former-Bolts and MRP-227-A. (1 page(s), 6/21/2016)
- ML16208A039 - 07/19/2016 - Meeting Summary with Electric Power Research Institute on Materials Reliability Program-227-A, "Pressurized Water Reactor Internals Inspection and Evaluation Guidelines." (4 page(s), 9/7/2016)
- ML16215A061 - Email and PA-MSC-1473 Service Bulletin for 07/19/2016 Baffle Bolt Meeting. (6 page(s), 7/18/2016)
- ML16211A054 - Electric Power Research Institute - Transmittal of NEI-03-08 Interim Guidance Regarding Baffle Former Bolt Inspections for Tier 1 Plants as Defined in Westinghouse NSAL 16-01. (3 page(s), 7/27/2016)
- ML16222A513 - Nuclear Safety Advisory Letter NSAL-16-1, Revision 1. (13 page(s), 8/9/2016)