R.E. Ginna Nuclear Power Plant Submittal of Flood Hazard Report per 10CFR50.54(f) re Fukushima Near-Term Force Recommendation 2.1: Flooding.
Accession Number: ML15072A008
Date Released: Wednesday, January 27, 2016
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML15072A009 - R.E. Ginna Nuclear Power Plant Submittal of Flood Hazard Report per 10CFR50.54(f) re Fukushima Near-Term Force Recommendation 2.1: Flooding. (15 page(s), 3/11/2015)
- ML15072A011 - Enclosure 2: AREVA, Inc., Rev. 1 to 51-9205719-001, "R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report," Part 1 of 2. (119 page(s), 3/11/2015)
- ML15072A012 - Enclosure 2: AREVA, Inc., Rev. 1 to 51-9205719-001, "R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report," Part 2 of 2. (16 page(s), 3/11/2015)
- ML15072A013 - Enclosure 3: G.E. Ginna Nuclear Power Plant Combined Events Flood Analysis, Calculation 32-9190280-000, Rev. 0. (222 page(s), 6/21/2013)
- ML15079A430 - Enclosure 4: Summary of Regulatory Commitments. (2 page(s), 3/11/2015)