Home > NRC Library > ADAMS Public Documents
Comanche Peak Nuclear Power Plant, Units 3 & 4 - Supplemental Response to Request for Additional Information 233(6115)and 249 (6316)(Section 2.5.4 and 8.1).
Accession Number: ML13324B037
Date Released: Friday, November 22, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13324A996 - Comanche Peak Nuclear Power Plant, Units 3 & 4 - Supplemental Response to Request for Additional Information 233(6115)and 249 (6316)(Section 2.5.4 and 8.1). (18 page(s), 10/7/2013)
- ML13324B025 - Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR Table 2.0-1R (Sheet 10 of 14) Key Site Parameters, 2.5.4 & 2.5.5 (Text and Tables). (46 page(s), 10/7/2013)
- ML13324B026 - Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2 FSAR Figure 2.5.4-201 - Figure 2.5.4-261. (34 page(s), 10/7/2013)
- ML13324B031 - Comanche Peak Nuclear Power Plant, Units 3 & 4 COL Application Part 2, FSAR Figures 2.5.5-201 - Figures 2.5.5-219. (17 page(s), 10/7/2013)
- ML13324B027 - Calculation TXUT-001-FSAR-2.5-CALC-009, Rev. 3, "Settlement and Bearing Capacity". (320 page(s), 9/20/2013)
- ML13324B028 - Calculation TXUT-001-FSAR-2.5-CALC-010, Rev. 4, "Lateral Earth Pressures". (41 page(s), 10/7/2013)
- ML13324B029 - Calculation TXUT-001-FSAR-2.5-CALC-018, Rev. 5, "Slope Stability". (219 page(s), 9/20/2013)
- ML13324B030 - Calculation TXUT-001-FSAR-2.5-CALC-041, Rev. 0, "Coefficients of Sliding and Sidewall Friction". (8 page(s), 5/7/2013)