Home > NRC Library > ADAMS Public Documents
Meeting Materials for March 1, 2012 Conference Call with STP Nuclear Operating Company (TAC Nos. ME7735 and ME7736).
Accession Number: ML120540492
Date Released: Friday, February 24, 2012
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML120540509 - South Texas Project, Units 1 and 2 - Email re: Meeting Materials for March 1, 2012 Conference Call (TAC NOS. ME7735 and ME7736). (1 page(s), 2/22/2012)
- ML120540557 - Licensee Slides for 03/1/12 Meeting with STP Nuclear Operating Company Meeting to Discuss GSI-191 (TAC NOS. ME7735 and ME7736). (6 page(s), 2/22/2012)
- ML120540570 - Uncertainty modeling of LOCA frequencies and break size distributions for the STP GSI-191 resolution (TAC NOS. ME7735 and ME7736). (28 page(s), 2/22/2012)
- ML120540604 - South Texas Project, Units 1 and 2 - Meeting Materials for 3/1/12 Conference Call (TAC NOS. ME7735 and ME7736). (19 page(s), 2/22/2012)
- ML120540610 - South Texas Project, Units 1 and 2 - Email RE: CASA Grande Summary (TAC NOS. ME7735 and ME7736). (1 page(s), 2/22/2012)
- ML120540667 - South Texas Project, Units 1 and 2 - CASA Grande Summary(TAC NOS. ME7735 and ME7736). (101 page(s), 2/22/2012)
- ML120540694 - South Texas Project, Units 1 and 2 - Email re: Additional Meeting Materials for the 3/01/12 meeting to Discuss GSI- 191 (TAC NOS. ME7735 and ME7736). (1 page(s), 2/22/2012)
- ML120540727 - South Texas Project, Units 1 and 2 - Actions Taken to Resolved PIRT Items. (11 page(s), 2/9/2012)
- ML120540758 - STP Summary of January Meeting. (7 page(s), 2/22/2012)
- ML120540784 - South Texas Project, Units 1 and 2 - Email re: Documents Transmitted for March 1, 2012 Meeting. (1 page(s), 2/23/2012)
- ML120540816 - South Texas Project, Units 1 and 2 - Experimental Setup for CHLE Test Equipment. (6 page(s), 2/23/2012)