Home > NRC Library > ADAMS Public Documents
Web package for FOIA/PA-2011-0187
Accession Number: ML111890519
Date Released: Tuesday, July 12, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11104A062 - FOIA/PA-2011-0187 - Redacted - Inspections of GE reactors at Japan Fukushima Dai-ichi and Fukushima Daini, inspections at Diablo Canyon, Indian Point, San Onofre, and Clinton. (2 page(s), 4/13/2011)
- ML11129A254 - FOIA/PA-2011-0187 - Resp 1 - Partial. (2 page(s), 5/5/2011)
- ML11129A278 - Clinton Power Station NRC Security Baseline Inspection Report No. 05000461/2006-003(DRS). (18 page(s), 11/30/2006)
- ML11129A279 - Clinton Power Station NRC Material Control and Accounting TI 2515/154 Phase III Inspection Report 05000461/2007-402. (16 page(s), 4/10/2007)
- ML11129A280 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2007-403(DRS). (19 page(s), 12/7/2007)
- ML11129A276 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2008-402(DRS). (21 page(s), 5/20/2008)
- ML11129A277 - Clinton Power Station TI 2515/171 Verification of Site Specific Implementation of B.5.b Phase 2. and 3 Mitigating Strategies Inspection Report No. 05000461/2008-007(DRS). (27 page(s), 6/18/2008)
- ML11129A284 - Clinton Power Station NRC Supplemental Inspection Report 05000461/2009404(DRS). (17 page(s), 4/10/2009)
- ML11129A289 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2009-402(DRS). (16 page(s), 5/14/2009)
- ML11129A285 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2010-402(DRS). (14 page(s), 3/11/2010)
- ML11129A286 - Clinton Power Station NRC Security Baseline Inspection Report 05000461/2010-403(DRS). (19 page(s), 5/26/2010)
- ML11129A287 - Clinton Power Station NRC Material Control and Accounting Program Inspection Report No. 05000461/2010-405. (5 page(s), 10/25/2010)
- ML11129A288 - Clinton Power Station Fire Protection Triennial Baseline Inspection NRC Inspection Report 05000461/2011-009. (24 page(s), 4/25/2011)
- ML11145A031 - FOIA/PA-2011-0187 - Resp 2 - Partial. (1 page(s), 5/23/2011)
- ML111190179 - IR 05000461-11-002; 01/01/11 - 03/31/11; Clinton Power Station, Unit 1; Fire Protection, Surveillance Testing. (62 page(s), 4/29/2011)
- ML11145A032 - San Onofre, Units 2 & 3 Final Safety Analysis Report, 2.4 Hydrologic Engineering Through 2.4.15 References 1-49. (52 page(s), 5/31/2007)
- ML11145A033 - San Onofre, Unit 2 & 3 Final Safety Analysis Report, Seismic Design - 3. Design of Structures, Components, Equipment, And Systems Through Appendix 3.7A-3.7A-101 Seismic Response Spectra. (127 page(s), 5/31/2007)
- ML11145A034 - Diablo Canyon, Units 1 & 2, Final Safety Analysis Report Update, 2.5 Geology And Seismology Through Figure 2.5-32 Free Field Spectra Vertical HOSGRI 7.5M/NEWMARK Rev. 11. (113 page(s), 5/31/2010)
- ML11145A035 - Diablo Canyon, Unit 1 & 2, Final Safety Analysis Report Update, 3.7 Seismic Design Through Figure 3.7-29, Derivation of Design Response Spectra for a Typical Piping System. (167 page(s), 5/31/2010)
- ML11174A131 - FOIA/PA-2011-0187 - Resp 3 - Final. (1 page(s), 6/22/2011)
- ML11174A124 - Clinton Power Station NRC Security Baseline Inspection Report 05000461-08-403(DRS) Preliminary Greater than Green Finding. (15 page(s), 11/19/2008)
- ML11174A125 - Clinton Power Station NRC Security Baseline Inspection Report 05000461-09-403(DRS). (12 page(s), 10/20/2009)
- ML11174A126 - Clinton Power Station NRC Security Baseline Inspection Report 05000461-07-401(DRS). (18 page(s), 7/13/2007)
- ML11174A128 - Clinton Power Station NRC Physical Security Baseline Inspection Report No. 05000461-06-005(DRS). (15 page(s), 6/19/2006)
- ML11174A130 - Clinton Power Station, Unit 1-NRC Inspection Report 05000461-06-006. (24 page(s), 10/18/2006)