Home > NRC Library > ADAMS Public Documents
Inspection Manual Change Notice 11-009
Accession Number: ML11132A086
Date Released: Thursday, June 2, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML11132A088 - Inspection Manual Change Notice 11-009. (2 page(s), 6/2/2011)
- ML101400479 - IMC 0609, "Significance Determination Process." (18 page(s), 6/2/2011)
- ML101400526 - IMC 0609 Att 3, "Senior Reactor Analyst Support Expectations." (5 page(s), 6/2/2011)
- ML103090611 - IMC 2515 App F, "Reactor Construction Activities Near Operating Unit(s)." (8 page(s), 6/2/2011)
- ML11053A009 - IMC 0040, "Preparing, Revising, and Issuing Documents for the NRC Inspection Manual." (39 page(s), 6/2/2011)
- ML111100647 - IP 65001.20,"Inspection of Safety-Related Piping DAC-Related ITAAC." (8 page(s), 6/2/2011)
- ML11132A089 - Table of Contents for Inspection Manual Change Notice 11-009. (50 page(s), 6/2/2011)