Home > NRC Library > ADAMS Public Documents
Point Beach, Units 1 & 2 - License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information.
Accession Number: ML101940402
Date Released: Friday, May 20, 2011
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML101940363 - Point Beach, Units 1 & 2 - License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information. (42 page(s), 7/8/2010)
- ML101940364 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-02, Rev. 0, "HELB Reconstitution Program - Task 2, High Energy System Selection," Enclosure 1, Attachment 2. (31 page(s), 10/21/2008)
- ML101940365 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-05-P01, Rev. 0, "Main Steam Piping GL 87-11 Break Location Determination," Enclosure 1, Attachment 3. (47 page(s), 9/26/2008)
- ML101940366 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-05-P02, Rev. 0, "Main Steam Piping GL 87-11, Break Location Determination," Enclosure 1, Attachment 4. (42 page(s), 9/26/2008)
- ML101940373 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-05-P03, Rev. 0, "Main Feedwater Line GL 87-11, Break Location Determination," Enclosure 1, Attachment 5. (16 page(s), 9/26/2008)
- ML101940374 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-05-P04, Rev. 0, "Main Feedwater Line GL 87-11, Break Location Determination," Enclosure 1, Attachment 6. (16 page(s), 9/26/2008)
- ML101940375 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-05-P05, Rev. 0, "Steam Supply Piping to AFW Pump GL 87-11, Break Location Determination," Enclosure 1, Attachment 7. (22 page(s), 10/3/2008)
- ML101940376 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-05-P06, Rev. 0, "Steam Supply Piping to AFW Pump and Radwaste GL 87-11, Break Location Determination," Enclosure 1, Attachment 8. (22 page(s), 10/3/2008)
- ML101940380 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-06, Rev. 0, "HELB Reconstitution Program - Task 6 - Break and Crack Size/Location Selection," Enclosure 1, Attachment 9. (15 page(s), 11/18/2008)
- ML101940381 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-10, Rev. 0, "HELB Reconstruction Program Task 10 - Gothic Pressure Analyses," Enclosure 1, Attachment 10. (45 page(s), 11/12/2008)
- ML101940382 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-12, Rev. 0, Task 12 Jet Impingement Calculations," Enclosure 1, Attachment 12. (197 page(s), 12/10/2008)
- ML101940383 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-09, Rev. 0, "HELB Reconstitution Program TASK 09 - Gothic Models," Enclosure 1, Attachment 14. (21 page(s), 11/12/2008)
- ML101940394 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-13, Rev. 2, "HELB Reconstitution Program Task 13 - Building Recovery," Enclosure 1, Attachment 15. (206 page(s), 4/14/2010)
- ML101940389 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-15, Rev. 2, "HELB Reconstitution Program - Task 15, Required Equipment List," Enclosure 1, Attachment 16. (33 page(s), 10/29/2009)
- ML101940391 - Point Beach, Units 1 & 2 - Calculation PBNP-994-21-07, Rev. 0, "HELB Task 07 - Mass & Energy Release for Pressure Limiting Cases," Enclosure 1, Attachment 17. (8 page(s), 11/12/2008)
- ML101940392 - Point Beach, Units 1 & 2 - Calculation 2008-12355, Rev. 0, "Mass and Energy Calculation for High Energy Line Break in 3" Steam Line within CCWHX Room," Enclosure 1, Attachment 18. (202 page(s), 7/8/2010)