Home > NRC Library > ADAMS Public Documents
LaSalle, Units 1 and 2, Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate.
Accession Number: ML100321303
Date Released: Tuesday, February 9, 2010
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML100321304 - LaSalle, Units 1 and 2, Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate. (24 page(s), 1/27/2010)
- ML100321306 - LaSalle, Units 1 and 2, Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages. (7 page(s), 1/27/2010)
- ML100321307 - LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages. (11 page(s), 1/27/2010)
- ML100321309 - LaSalle, Units 1 and 2, Attachment 4 - NRC Regulatory Issue Summary 2002-03 Cross-Reference. (12 page(s), 1/27/2010)
- ML100321316 - LaSalle, Units 1 and 2, Attachment 5 - Summary of Regulatory Commitments. (1 page(s), 1/27/2010)
- ML100321324 - LaSalle, Units 1 and 2, Attachment 7 - GEH Nuclear Energy Affidavit Supporting Withholding. (4 page(s), 1/27/2010)
- ML100321326 - LaSalle, Units 1 and 2, Attachment 8 - NEDO-33485, Rev. 0, "Safety Analysis Report for LaSalle County Station Units 1 and 2, Thermal Power Optimization." (144 page(s), 1/27/2010)
- ML100321336 - LaSalle, Units 1 and 2, Attachment 10 - Cameron International Corporation, Application for Withholding Proprietary Information From Public Disclosure. (9 page(s), 1/27/2010)
- ML100321340 - LaSalle, Units 1 and 2, Attachment 11 - Exelon Generation Company, LLC Calculation L-003445 "Core Thermal Power Uncertainty to Support MUR for LaSalle Unit 2." (60 page(s), 1/27/2010)
- ML100321363 - LaSalle, Units 1 and 2, Attachment 13 - Exelon Generation Company, LLC Instrument Setpoint Calculations. (259 page(s), 1/27/2010)
- ML100321371 - LaSalle, Units 1 and 2, Attachment 14 - Mechanical Drawings for Leading Edge Flowmeter Installation. (2 page(s), 1/27/2010)