Home > NRC Library > ADAMS Public Documents
Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5
Accession Number: ML092330272
Date Released: Monday, October 5, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML092330237 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Final Safety Analysis Report - Front Matter (42 page(s), 6/30/2009)
- ML092330238 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 01 Introduction and General Plan Description- Section 1.0-1.9 Pages 1-46 (46 page(s), 6/30/2009)
- ML092330239 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Geography and Demography- Section 2.1- Part 1 - Pages 1-58 (58 page(s), 6/30/2009)
- ML092330240 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics- Nearby Industrial, Transportation and Military Facilities- Section 2.2 - Pages 59-110 (52 page(s), 6/30/2009)
- ML092330241 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Meteorology- Section 2.3 - Part 1 - Pages 111-574 (464 page(s), 6/30/2009)
- ML092330242 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Meteorology- Section 2.3 - Part 2 - Pages 575-667 (93 page(s), 6/30/2009)
- ML092330244 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Meteorology- Section 2.3 - Part 3 - Pages 668-724 (57 page(s), 6/30/2009)
- ML092330245 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Hydrological Engineering- Section 2.4 - Part 1 - Pages 725-969 (245 page(s), 6/30/2009)
- ML092330246 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Hydrological Engineering- Section 2.4 - Part 2 - Pages 970-1011 (42 page(s), 6/30/2009)
- ML092330247 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Hydrological Engineering- Section 2.4 - Part 3 - Pages 1012-1058 (47 page(s), 6/30/2009)
- ML092330248 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Geology, Seismology, and Geotechnical Engineering- Section 2.5 - Part 01 - Pages 1059-1399 (341 page(s), 6/30/2009)
- ML092330249 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Geology, Seismology, and Geotechnical Engineering- Section 2.5 - Part 02 - Pages 1400-1417 (18 page(s), 6/30/2009)
- ML092330250 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Geology, Seismology, and Geotechnical Engineering- Section 2.5 - Part 03 - Pages 1418-1450 (33 page(s), 6/30/2009)
- ML092330251 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Geology, Seismology, and Geotechnical Engineering- Section 2.5 - Part 04 - Pages 1451-1489 (39 page(s), 6/30/2009)
- ML092330252 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 02-Site Characteristics-Geology, Seismology, and Geotechnical Engineering- Section 2.5 - Part 05 - Pages 1490-1552 (63 page(s), 6/30/2009)
- ML092330253 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 03-Design of Structure, Components, Equipment and Systems-Sections 3.1-3.13 - Pages 1-191 (191 page(s), 6/30/2009)
- ML092330254 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 04-Reactor-Sections 4.1-4.6 - Pages 1-7 (7 page(s), 6/30/2009)
- ML092330255 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 05- Reactor Coolant Systems and Connected Systems- Section 5.1-5.4 - Pages 1-10 (10 page(s), 6/30/2009)
- ML092330256 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 06-Engineered Safety Features-Section 6.1-6.8 - Pages 1-19 (19 page(s), 6/30/2009)
- ML092330257 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 07-Instrumentation and Controls-Section 7.1-7.9 - Pages 1-10 (10 page(s), 6/30/2009)
- ML092330259 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 08- Electric Power-Section 8.1-8.4 - Pages 1-43 (43 page(s), 6/30/2009)
- ML092330260 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 09-Auxiliary Systems- Section 9.1-9B.4 - Pages 1-57 (57 page(s), 6/30/2009)
- ML092330261 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 09-Auxiliary Systems- Section App B - Pages B-1-68 (68 page(s), 6/30/2009)
- ML092330262 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 10-Steam and Power Conversion System-Section 10.1-10.4 - Pages 1-27 (27 page(s), 6/30/2009)
- ML092330263 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 11-Radioactive Waste Management-Section 11.1-11.5 - Pages 1-6 (6 page(s), 6/30/2009)
- ML092330264 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 12-Radiation Protection-Section 12.1-12.5 - Pages 1-46 (46 page(s), 6/30/2009)
- ML092330265 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 13-Conduct of Operations-Section 13.1-13.8 - Pages 1-46 (46 page(s), 6/30/2009)
- ML092330266 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 14- Verification Programs-Section 14.1-14.3 - Pages 1-40 (40 page(s), 6/30/2009)
- ML092330267 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 15-Transient and Accident Analysis-Section 15.1-15.10 - Pages 1-16 (16 page(s), 6/30/2009)
- ML092330268 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 16-Technical Specification Bases (1 page(s), 6/30/2009)
- ML092330269 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 17-Quality Assurance and Reliability Assurance-Section 17.1-17.6 - Pages 1-47 (47 page(s), 6/30/2009)
- ML092330270 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 18-Human Factors Engineering-Section 18.1-18.12 - Pages 1-18 (18 page(s), 6/30/2009)
- ML092330271 - Unistar Nuclear - Calvert Cliffs Power Plant Unit 3 COLA (Final Safety Analysis Report), Rev. 5 - Chapter 19 Probabilistic Risk Assessment and Severe Accident Evaluation- Section 19.1-19.3 - Pages 1-23 (23 page(s), 6/30/2009)