Home > NRC Library > ADAMS Public Documents
PPL - Bell Bend COLA (FSAR), Rev. 1
Accession Number: ML090710502
Date Released: Friday, March 27, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML090710467 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 19 - Probabilistic Risk Assessment and Severe Accident Evaluation (26 page(s), 2/27/2009)
- ML090710468 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Part 02 FSAR - Table of Contents, List of Tables, and List of Figures (42 page(s), 2/27/2009)
- ML090710469 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 01 - Introduction and General Description of the Plant (50 page(s), 2/27/2009)
- ML090710470 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.0 - 02.04 (pages 2-1 to 2-1300) (1301 page(s), 2/27/2009)
- ML090710471 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Section 02.04 (pages 2-1301 to 2-1350) (50 page(s), 2/27/2009)
- ML090710472 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.04 - 02.05 (pages 2-1351 to 2-1748) (398 page(s), 2/27/2009)
- ML090710473 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1749 to 2-1764) (16 page(s), 2/27/2009)
- ML090710474 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1765 to 2-1850) (86 page(s), 2/27/2009)
- ML090710475 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1850 to 2-1872) (22 page(s), 2/27/2009)
- ML090710476 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1873 to 2-1876) (4 page(s), 2/27/2009)
- ML090710477 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1877 to 2-1879) (3 page(s), 2/27/2009)
- ML090710478 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1880 to 2-1925) (46 page(s), 2/27/2009)
- ML090710479 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1926 to 2-1932) (7 page(s), 2/27/2009)
- ML090710480 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1933 to 2-1938) (6 page(s), 2/27/2009)
- ML090710481 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1939 to 2-1946) (8 page(s), 2/27/2009)
- ML090710482 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 02 - Site Characteristics - Sections 02.05 - 02.05 (pages 2-1947 to 2-1952) (6 page(s), 2/27/2009)
- ML090710483 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 03 - Design of Structures, Components, Equipment, and Systems (230 page(s), 2/27/2009)
- ML090710485 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 03 - Design of Structures, Components, Equipment, and Systems - Section 3E.0 - Critical Sections for SR Cat. 1 Structures (26 page(s), 2/27/2009)
- ML090710486 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 04 - Reactor (2 page(s), 2/27/2009)
- ML090710487 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 05 - Reactor Coolant System and Connected Systems (10 page(s), 2/27/2009)
- ML090710488 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 06 - Engineered Safety Features (18 page(s), 2/27/2009)
- ML090710489 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 07 - Instrumentation and Controls (2 page(s), 2/27/2009)
- ML090710490 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 08 - Electric Power (38 page(s), 2/27/2009)
- ML090710491 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 09 - Auxiliary Systems (62 page(s), 2/27/2009)
- ML090710492 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 10 - Steam and Power Conversion System (26 page(s), 2/27/2009)
- ML090710493 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 11 - Radioactive Waste Management (18 page(s), 2/27/2009)
- ML090710494 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 12 - Radiation Protection (44 page(s), 2/27/2009)
- ML090710495 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 13 - Conduct of Operations (48 page(s), 2/27/2009)
- ML090710496 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 14 - Verification Programs (24 page(s), 2/27/2009)
- ML090710497 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 15 - Transient and Accident Analysis (10 page(s), 2/27/2009)
- ML090710498 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 16 - Technical Specifications (2 page(s), 2/27/2009)
- ML090710499 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 17 - Quality Assurance and Reliability Assurance (46 page(s), 2/27/2009)
- ML090710500 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 18 - Human Factors Engineering (6 page(s), 2/27/2009)
- ML090710501 - PPL - Bell Bend COLA (FSAR), Rev. 1 - Chapter 09 - Auxiliary Systems - Appendix 9B - Fire Protection Analysis (64 page(s), 2/27/2009)