Home > NRC Library > ADAMS Public Documents
Web package for FOAI/PA-2008-0276
Accession Number: ML082470365
Date Released: Friday, September 5, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML081960691 - FOIA/PA-2008-0276 - Redacted - General Electric Test Reactor (GETR) License TR-1, specific documents as noted in September 7, 1962 letter from GE to AEC (36 page(s), 7/12/2008)
- ML082420547 - FOIA/PA-2008-0276 Resp 1 - Final. (2 page(s), 8/26/2008)
- ML082420538 - Letter from G. White, GE to E. Case, AEC Advising him of the Investigations of Three Incidents Involving Release of Radioactive Material of General Electric Test Reactor. (5 page(s), 7/20/1962)
- ML082420539 - Telegram from R. Engelken, Region V to P. Morris, AEC Regarding a Stuck Control Rod in the GETR on July 23, 1962. (2 page(s), 7/24/1962)
- ML082420540 - Telegram from General Electric to E. Case, AEC Regarding a Reactor Scrammed from a Spurious Instrument Trip Experienced During Startup. (6 page(s), 7/30/1962)
- ML082420541 - Telegram from General Electric to E. Case, AEC Regarding the Sticking of General Electric Test Reactor Control Rod #5 on July 30, 1962. (2 page(s), 8/2/1962)
- ML082420542 - Letter from E. Case, DLR/AEC to F. Gifford, ACRS/AEC Enclosing a Copy of an Incoming Telegram for Field Inspector Concerning Operation of the GETR Dated September 17, 1962. (3 page(s), 9/18/1962)
- ML082420543 - Note from P. Morris, CO to R. Page, LR and E. Case, LR Enclosing a Copy of a Telegram Report from the Field Inspector Concerning a Control Rod Drive Malfunctionat the General Electric Test Reactor on February 4, 1963. (3 page(s), 2/6/1963)
- ML082420544 - Letter from G. White, GE to R. Lowenstein, AEC Advising that it is their Intention to Retain the Mark I Control rods Until the New Design is thoroughly Proven. (2 page(s), 2/21/1963)
- ML082420545 - Letter from B. Wilson, GE to S. Levine, AEC Enclosing a Supplementary Report Concerning Redesign of the GETR Control Rods. (16 page(s), 3/1/1963)
- ML082420546 - Letter from B. Wilson, GE to R. Lowenstein, AEC Enclosing Proposed Change Concerning Redesign of GETR Control Rods. (14 page(s), 3/1/1963)