NRC Logo

Home > NRC Library > ADAMS Public Documents

Trip Report Regarding Staff Observation of Flume Testing of a Prototype Portion of the Proposed Replacement Suction Screen Design for the Comanche Peak Steam Electric Station.

Accession Number: ML061710147

Date Released: Monday, July 3, 2006

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer