[an error occurred while processing this directive]

ROP Cornerstone & Performance Indicators

Reactor Safety

Mitigating Systems - The objective of this cornerstone is to monitor the availability, reliability, and capability of systems that mitigate the effects of initiating events to prevent core damage. Licensees reduce the likelihood of reactor accidents by maintaining the availability and reliability of mitigating systems. Mitigating systems include those systems associated with safety injection, decay heat removal, and their support systems, such as emergency AC power. This cornerstone includes mitigating systems that respond to both operating and shutdown events. There are five indicators in this cornerstone:


 
Mitigating System Indicator Thresholds
(White)
Increased Regulatory Response Band
(Yellow)
Required Regulatory Response Band
(Red)
Unacceptable Performance Band
Emergency Power < 2 EDG > 2.5 % > 5.0 % > 10.0 %
> 2 EDG > 2.5 % > 10.0 % > 20.0 %
Hydro Emerg. Power TBD TBD TBD
Boiling-Water Reactor (BWR) High Pressure Injection System HPCI > 4.0 % > 12.0 % > 50.0 %
HPCS > 1.5 % > 4.0 % > 20.0 %
Heat Removal System RCIC > 4.0 % > 12.0 % > 50.0 %
Pressurized-Water Reactor (PWR) High Pressure Injection System HPSI > 1.5 % > 5.0 % > 10.0 %
Heat Removal System AFW > 2.0 % > 6.0 % > 12.0%
Residual Heat Removal System RHR > 1.5 % > 5.0 % > 10.0 %
Safety System Functional Failures BWR > 6.0 N/A N/A
PWR >5.0 N/A N/A
Page Last Reviewed/Updated Thursday, April 14, 2011

Stay Connected

Thursday, April 14, 2011