United States Nuclear Regulatory Commission - Protecting People and the Environment

Fermi 2

1Q/2012 Performance Indicators

Licensee's General Comments: MSPI data changes due to minor revisions of past unavailability data



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Unplanned scrams 1.0 0 1.0 0 0 0 0 0
Critical hours 1968.5 2208.0 1262.9 1784.8 2184.0 2208.0 2209.0 2042.0
                 
Indicator value 2.8 1.9 2.8 1.9 0.9 0.9 0 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Unplanned power changes 0 0 1.0 1.0 0 0 1.0 0
Critical hours 1968.5 2208.0 1262.9 1784.8 2184.0 2208.0 2209.0 2042.0
                 
Indicator value 0.9 0 0.9 1.9 1.9 1.9 1.7 0.8

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Safety System Functional Failures 0 0 0 1 0 0 1 0
                 
Indicator value 0 0 0 1 1 1 2 1

Licensee Comments:

4Q/11: LER 2011-01, Loss of the High Pressure Coolant Injection system due to an inoperable minimum flow valve.

1Q/11: February - Fermi 2 LER 2010-004






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 2.82E-09 2.46E-09 2.16E-09 -5.74E-09 -5.60E-09 1.40E-09 5.00E-10 -4.61E-09
URI (ΔCDF) -2.97E-07 -3.02E-07 -2.93E-07 -2.97E-07 -3.00E-07 -3.01E-07 -2.95E-07 -2.99E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.90E-07 -3.00E-07 -2.90E-07 -3.00E-07 -3.10E-07 -3.00E-07 -2.90E-07 -3.00E-07

Licensee Comments:

2Q/10: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) -2.25E-09 -2.25E-09 -1.74E-10 -1.24E-10 -1.24E-10 5.29E-09 4.06E-09 4.07E-09
URI (ΔCDF) -2.85E-08 -3.00E-08 -4.12E-09 -4.38E-09 -4.63E-09 2.01E-08 2.10E-08 1.96E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.10E-08 -3.20E-08 -4.30E-09 -4.50E-09 -4.80E-09 2.50E-08 2.50E-08 2.40E-08

Licensee Comments:

2Q/10: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 1.55E-08 4.11E-09 -2.09E-09 -2.37E-09 -2.37E-09 -2.37E-09 -2.37E-09 -2.37E-09
URI (ΔCDF) -3.11E-08 -2.82E-08 -2.57E-08 -2.66E-08 -2.74E-08 -2.82E-08 -2.89E-08 -2.97E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.60E-08 -2.40E-08 -2.80E-08 -2.90E-08 -3.00E-08 -3.10E-08 -3.10E-08 -3.20E-08

Licensee Comments:

2Q/10: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) -4.22E-09 -5.87E-09 -5.88E-09 -6.24E-09 5.41E-09 6.79E-09 -4.23E-09 2.75E-09
URI (ΔCDF) -1.08E-07 -1.08E-07 -1.08E-07 -1.08E-07 -1.08E-07 -1.08E-07 -1.08E-07 -1.08E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.10E-07 -1.10E-07 -1.10E-07 -1.10E-07 -1.00E-07 -1.00E-07 -1.10E-07 -1.10E-07

Licensee Comments:

2Q/10: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 3.39E-08 4.69E-08 4.63E-08 2.88E-08 3.83E-08 3.83E-08 1.39E-08 2.12E-08
URI (ΔCDF) -1.28E-08 -1.29E-08 -1.28E-08 -1.28E-08 -1.28E-08 -1.29E-08 -1.29E-08 -1.29E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.10E-08 3.40E-08 3.30E-08 1.60E-08 2.50E-08 2.50E-08 1.00E-09 8.30E-09

Licensee Comments:

2Q/10: Changed PRA Parameter(s).






Link to Notes

Reactor Coolant System Activity 4/10 5/10 6/10 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11
Maximum activity 0.000026 0.000027 0.000027 0.000026 0.000028 0.000029 0.000033 N/A 0.000023 0.000025 0.000027 0.000033
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 N/A 0 0 0 0
Reactor Coolant System Activity 4/11 5/11 6/11 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12
Maximum activity 0.000019 0.000017 0.000014 0.000016 0.000011 0.000006 0.000023 0.000025 0.000027 0.000028 0.000031 0.000025
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 4/10 5/10 6/10 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11
Maximum leakage 1.630 1.630 1.630 1.630 1.630 1.630 1.630 0.240 1.600 1.600 1.630 1.630
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 6.5 6.5 6.5 6.5 6.5 6.5 6.5 1.0 6.4 6.4 6.5 6.5
Reactor Coolant System Leakage 4/11 5/11 6/11 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12
Maximum leakage 1.630 1.790 1.680 1.660 1.660 1.690 1.660 1.660 1.660 1.790 1.840 1.950
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 6.5 7.2 6.7 6.6 6.6 6.8 6.6 6.6 6.6 7.2 7.4 7.8

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Successful opportunities 41.0 76.0 20.0 18.0 31.0 46.0 30.0 6.0
Total opportunities 42.0 77.0 20.0 19.0 31.0 46.0 31.0 6.0
                 
Indicator value 96.1% 96.8% 96.5% 96.2% 96.9% 97.8% 97.6% 98.5%

Licensee Comments: none






Link to Notes

ERO Drill Participation 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Participating Key personnel 118.0 112.0 122.0 120.0 120.0 121.0 119.0 118.0
Total Key personnel 129.0 121.0 123.0 120.0 120.0 121.0 119.0 119.0
                 
Indicator value 91.5% 92.6% 99.2% 100.0% 100.0% 100.0% 100.0% 99.2%

Licensee Comments: none






Link to Notes

Alert & Notification System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Successful siren-tests 124 186 186 186 186 186 123 186
Total sirens-tests 124 186 186 186 186 186 124 186
                 
Indicator value 99.9% 99.9% 100.0% 100.0% 100.0% 100.0% 99.9% 99.9%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Security information not publicly available.



 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: April 24, 2012